ID Date Author Type Categoryup Subject Text Attachments
  3461   Tue Aug 24 06:34:01 2010 AlastairUpdateGeneralElog......was down.  Have restarted it.   
  3475   Fri Aug 27 07:21:13 2010 AlastairUpdateGeneralelog... was down.  I restarted the version
in the 2.7.5 folder.  It went down again
almost immediately but stayed up after the
  
  3567   Mon Sep 13 12:09:42 2010 kiwamuSummaryGeneralelog restarted Elog didn't respond, so I restarted
it with the script.
Before killing the process somehow
  
  3605   Fri Sep 24 16:31:35 2010 steveConfigurationGeneralopen frame- rack is movedThe squeezing open frame rack was moved
from the south side of the PSL enclosure
to the north side of the SP table.
 P1060881.JPG 
  3616   Tue Sep 28 14:12:14 2010 steveUpdateGeneralvertex crane drive is out of orderThe vertex crane drive is overheating,
it stopped functioning. Service man will
be here tomorrow morning.
  
  3621   Wed Sep 29 15:34:46 2010 kiwamuUpdateGeneralfixing vertex crane
    

       
            
  
  3624   Thu Sep 30 09:34:58 2010 steveUpdateGeneralvertex crane trolly drive fixed


   
        
            
 P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG 
  3733   Mon Oct 18 09:01:48 2010 steveHowToGeneralHow not to This BNC cable is crying for help. Please
do not do this to me.  It should be
reported  to the  abused center.Throw
 P1060926.JPG 
  3745   Wed Oct 20 16:41:41 2010 steveOmnistructureGeneral laser chiller leaving for MIT   P1060929.JPG 
  3832   Mon Nov 1 10:17:55 2010 steveUpdateGeneralbreakers relabelledPedro of the electrical shop helped to
retrace wires from the racks to the breakers.
Many wrong labels were replaced. These labels
 P1060970.JPGP1060972.JPGP1060975.JPG 
  3854   Wed Nov 3 16:49:31 2010 steveUpdateGeneralstorage cabinet is in placeThe south end of IFO room 104 was reshuffled.
The flow bench was moved all the way to the
south end to create more room for the crane
 P1070018.JPG 
  3862   Thu Nov 4 17:24:49 2010 steveUpdateGeneralconflat flanges for MIT8 pieces of 10" CF blanks were shipped
to MIT
 P1070020.JPG 
  3864   Thu Nov 4 17:57:27 2010 steveUpdateGeneralBeamScanner is working againKoji, Suresh and Steve,
The beam scanner is back from repair. 
Koji and Suresh helped to move the I/O address
 P1070024.JPG 
  3914   Sun Nov 14 02:59:31 2010 ranaConfigurationGeneralMEDM snapshots web pageSince Nodus is a Solaris machine it can
barely handle doing the ImageMagick commands
(such as convert and import). I removed
  
  4096   Thu Dec 23 22:13:50 2010 KojiUpdateGeneralPZT HV turned onThe four IOO PZTs have been turned on in
order to confirm the alignment of the IFO.
Once they are turned on, the spots
  
  4099   Fri Dec 31 12:41:02 2010 ranaUpdateGeneralIR flashesI came in today to check up on the StripTool
and burn the Ubuntu LTS (new CDS OS) DVD.
I was pretty excited to see the PRM flashes
 Untitled.png 
  4142   Wed Jan 12 02:41:19 2011 kiwamuUpdateGeneraldaytime tasks for tomorrow[Rana, Kiwamu]
Here
is the list for the daytime tasks of tomorrow,
  
  4158   Fri Jan 14 17:58:50 2011 OsamuConfigurationGeneralStandalone RT setup I'll be gone to Hanford site next
week and come back to Caltech on 24th's week.
I setup a standalone RT system at
  
  4197   Tue Jan 25 00:09:54 2011 KojiUpdateGeneralJenne laser is at PSL LabI found Tara's elog entry that Jenne laser
is at PSL Lab. 
Since we recently use it frequently,
  
  4225   Sat Jan 29 00:31:05 2011 SureshUpdateGeneralVertex crane upgrade completedThe
Vertex crane is smarter and safer now. 
 6x 
  4235   Tue Feb 1 15:09:41 2011 KojiOmnistructureGeneralProjector - fixedThe projector in the controls room has
been fixed the orange blinking of the status
LED.
  
  4290   Mon Feb 14 17:16:47 2011 steveUpdateGeneralracks, breakers labeledThe south arm labels were changed from
y to x to reflect reality.
So racks, manual disconnects and
  
  4297   Tue Feb 15 06:59:57 2011 Suresh, JenneOmnistructureGeneralX end enclosure left open[Jenne, Suresh]
 Jenne found the X-end table
enclosure had been left open.  She replaced
  
  4299   Tue Feb 15 11:53:02 2011 kiwamuSummaryGeneraltoday's missionsI
think this week is going to be an "alignment
week".
  
  4310   Thu Feb 17 00:43:13 2011 kiwamuSummaryGeneralto do list for tomorrowLet's
share our tasks ! 
  
  4322   Fri Feb 18 00:35:21 2011 kiwamuSummaryGeneralto do list for Feb. 18thDAYTIME
  -  more
  
  4357   Fri Feb 25 13:28:14 2011 kiwamuSummaryGeneralto do list Because it maybe useful to share
this kind of information among us, I just
  
  4359   Fri Feb 25 14:50:16 2011 KojiSummaryGeneralto do list- Put priority on the list
- Put names on the items
- Where is the CDS TO DO ==> Joe
  
  4364   Mon Feb 28 11:22:40 2011 josephbSummaryGeneralto do list

   
        
            
  
  4371   Wed Mar 2 22:57:57 2011 sureshSummaryGeneralStuff from LLOHere is a partial list of stuff which is
being packed at LLO to be shipped to CIT. 
The electronics ckt boards are yet to be
 eLIGO_items_from_LLO_for_Caltech.xls 
  4381   Mon Mar 7 17:58:14 2011 sureshSummaryGeneralStuff from LLO
Here is the updated list. These lists were
used as packing lists and therefore are organised
 eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf 
  4405   Fri Mar 11 16:30:42 2011 steveUpdateGeneralhigh speed servo unit is hereNew
Focus Servo Controller has just arrived.
We have 25 days to evaluate this product.
 P1070462.JPG 
  4412   Fri Mar 18 14:18:00 2011 kiwamuSummaryGeneralnew laser pointersJust for a record. We got 4 new laser
pointers (2 greens, 1 blue, and 1 green and
 DSC_2883_ss.jpg 
  4433   Wed Mar 23 14:19:35 2011 KojiSummaryGeneralGrand PlanThis is the grand plan we talked about
in the beginning of the meeting.

    (Kiwamu) X-end Green cleaning
  
  4458   Tue Mar 29 22:29:16 2011 kiwamuUpdateGeneralsome tasks tomorrow *  Temporary strain relief for
the heliax cables on 1X2 (Steve)
  
  4461   Wed Mar 30 16:57:13 2011 kiwamuUpdateGeneralturned off c1aux [Steve / Kiwamu]
 As a part of the video cable
session, we reconnected some power cords
  
  4475   Thu Mar 31 11:30:51 2011 steveConfigurationGeneralstrain relieved rf cablesI strain relieved RF cables labeled 33
MHZ LO and 166 MHZ to EOM at 1X2  This
is a temporary setup for the 11 MHZ
 P1070491.JPG 
  4488   Tue Apr 5 17:31:59 2011 steveSummaryGeneralnew laser pointers

    

       
            
 P1070530.JPG 
  4515   Tue Apr 12 12:01:30 2011 josephbUpdateGeneralIFO controls, now with 10% less lying (ITMX/ITMY controls swapped)The ITMX/ITMY control swap is complete.
The
steps from this
elog were followed.
  
  4516   Tue Apr 12 16:01:33 2011 josephbUpdateGeneralRFM errorsProblem:
Currently the c1scy,
c1mcs, and c1rfm models are reporting an
error with receiving some data sent over
  
  4629   Wed May 4 15:56:09 2011 valeraSummaryGeneralPSL and MC trendsThe attached plot shows 2 day trends of
the PMC and MC reflected and transmitted
power, the PSL POS/ANG QPD signals, and the
 pslmcdrift.pdf 
  4649   Fri May 6 01:27:12 2011 KojiSummaryGeneralaLIGO BBPD / Green PD investigationMinicircuits
ERA-5SM was used for the RF
amp of the BBPD. This amp is promising
 PD_response.pdfFFD-100_AP389_MCL.pdf 
  4658   Sat May 7 12:57:54 2011 KojiSummaryGeneralaLIGO BBPD / Green PD investigationThe RF amplifier of the prototype BBPD
has been replaced from ERA-5SM to MAR-6SM.
 PD_response.pdf 
  4676   Tue May 10 09:05:49 2011 KojiUpdateGeneralaLIGO BBPD / Green PD investigationBBPD update
- The BBPD circuit has been constructed
on the aLIGO BBPD board
 PD_response.pdf 
  4701   Thu May 12 09:00:23 2011 steveUpdateGeneraloptical table covers must be usedI found ITMX-ISCT and BS-ISCT ( IFO sensing-control
table)  not covered this morning. Please
do not leave tables open.
  
  4727   Mon May 16 15:46:05 2011 KojiUpdateGeneraloptical layout viewable on the online version of autocadI have made my own AutoCAD WS account and
put the latest 40m layout.
AutoCAD WS is a free cloud service
  
  4778   Wed Jun 1 21:56:43 2011 KojiUpdateGeneralaLIGO BBPD / Green PD final resultHere is the conclusive result for the
circuit configuration for aLIGO BBPD and
40m Green PD. 
 PD_response.pdflinearity_GALI_6.pdf 
  4824   Wed Jun 15 15:18:01 2011 kiwamuUpdateGeneralWednesday cleaning[Jenne / Kiwamu]
We spent approximately an hour for
the weekly Wednesday cleaning.
  
  4835   Mon Jun 20 00:59:02 2011 kiwamuSummaryGeneralWeekly reportThis
is a summary for the week ending June 19th.
Feel
  
  4856   Wed Jun 22 17:35:35 2011 IshwitaUpdateGeneralHot air stationThis is the new hot air station for the
40m lab.........
 
 P6220212.JPGP6220213.JPG 