  4050   Tue Dec 14 01:04:23 2010 kiwamuUpdateSUSalignment of ITMs and PRM done   The alignment of the ITMs   
  4051   Tue Dec 14 04:14:53 2010 ranaUpdateElectronicsRF Photodiode CharacterizationsThis is looking better, but the fit data
for the TF should be plotted along with the
data. The data should be made up of points
  
  4052   Tue Dec 14 09:26:17 2010 ZachUpdateelogrestarted Restarted the elog with the script   
  4053   Tue Dec 14 11:24:35 2010 josephbUpdateCDSburt restoreI had
updated the individual start scripts, but
forgotten to update the rc.local file on
  
  4054   Tue Dec 14 15:15:19 2010 kiwamuUpdateSUSput ETMY and aligned the beam  [Zach and Kiwamu]
 We
  
  4055   Tue Dec 14 22:42:56 2010 kiwamuUpdateSUSinstalled the last TT . And some more progresses  [Koji, Oasmu and Kiwamu]
 
  
  4057   Wed Dec 15 13:36:44 2010 josephbUpdateCDSETMY IO chassis updateI gave
Alex a sob story over lunch about having
to go and try to resurrect dead VME crates. 
  
  4058   Wed Dec 15 14:23:32 2010 KojiUpdateCDSETMY IO chassis updateGreat!

I wish this board works fine at least for
several days...
  
  4060   Wed Dec 15 17:21:20 2010 josephbUpdateCDSETMY controls statusStatus:
The
c1iscey was converted over to be a diskless
  
  4061   Wed Dec 15 18:29:59 2010 JenneUpdatePEMSeismometer Channels Being Recorded AgainThe Seismometer channels are once more
being recorded.  Alastair brought Gur1
back from the ATF the other day, and today
  
  4062   Wed Dec 15 23:10:40 2010 KojiUpdateIOOSRM Oplev / Dark Steering mirrors installedI helped the vacuum installation work in
the evening.
- Three steering mirrors after the
  
  4063   Thu Dec 16 01:23:43 2010 kiwamuUpdateSUSSRM OSEMs installed  [Zach and Kiwamu]
 We worked
 DSC_2757_ss.jpg 
  4064   Thu Dec 16 10:52:42 2010 josephbUpdateCamerasNew PoE digital camerasWe have two new Basler acA640-100gm cameras. 
These are power over ethernet (PoE) and very
tiny.
 basler.jpg 
  4065   Thu Dec 16 15:10:18 2010 josephb, kiwamuUpdateCDSETMY working at the expense of ETMXI acquired
a second full pair of Host interface board
cards (one for the computer and one for the
  
  4066   Fri Dec 17 00:30:05 2010 KojiUpdateIOOITMY / SRM / BS / PRM OPLEVs aligned[Steve and Koji]
The
invac OPLEV mirrros were aligned
  
  4067   Fri Dec 17 00:55:30 2010 KojiUpdateIOOThe dark port beams reached the AP table[Koji and Kiwamu]
We
obtained two dark port beams on the AP table:
  
  4068   Fri Dec 17 02:22:06 2010 kiwamuUpdateCDSETMY damping: not good  I made some efforts
in order to damp ETMY, however it still doesn't
  
  4069   Fri Dec 17 03:37:47 2010 ranaUpdateSUSITMY / SRM / BS / PRM OPLEVs aligned

    
        
  
  4070   Sat Dec 18 01:17:04 2010 kiwamuUpdateIOOsome more alignments [Koji and Kiwamu]
 We did some more vacuum
works today. It is getting ready to pump
  
  4071   Sat Dec 18 06:24:49 2010 ranaUpdateelogrestartedThe process was taking up 100% of the CPU
and not responding via web. The .log file
showed the last action was somebody reading/editing
  
  4072   Sat Dec 18 23:33:06 2010 KojiUpdateelogrestartedDid the same.

  
  4073   Sun Dec 19 11:19:42 2010 KojiUpdateelogrestartedDid it again. It seemed that Google bot
came to the elog and tried to obtain  "http://nodus.ligo.caltech.edu:8080/robots.txt".
That was the last of the log.
  
  4074   Sun Dec 19 22:45:28 2010 ranaUpdateelogrestartedI deleted the yellow box which showed up
by default when making an elog entry. Would
be nice if we could make it so that you have
  
  4075   Mon Dec 20 10:06:36 2010 kiwamuUpdateCDSETMY damped  Last Saturday
I succeeded in damping the ETMY suspension
 2010Dec18.png 
  4076   Mon Dec 20 10:47:29 2010 KojiUpdateIOOPlan for closing the vacuum chambersMonday

    Place the bars on the
  
  4077   Mon Dec 20 16:57:58 2010 steveUpdateIOOchecking out & closing the vacuum chambers
    Check EQ-stops
  
  4078   Mon Dec 20 22:56:20 2010 JenneUpdateIOOPlan for closing the vacuum chambersTuesday 

    If still everythig is
fine, put the BS heavy door.

-
  
  4079   Mon Dec 20 23:10:25 2010 JenneUpdateSUSPretty much ready for pump-down. A few final things....[Kiwamu, Jenne, Koji, Osamu]
We have mostly prepared the IFO for
pump down. 
  
  4080   Mon Dec 20 23:32:58 2010 kiwamuUpdateIOORe:checking out & closing the vacuum chambers    
  4081   Tue Dec 21 08:26:08 2010 ranaUpdateelogelogd is getting killed by SureshSuresh killed the elogd again from India.
This was the log file:
Accept-Charset: ISO-8859-1,utf-8;q=0.7,*;q=0.7
  
  4082   Tue Dec 21 11:52:58 2010 josephbUpdateComputersRGA scripts fixed, c0rga fixedc0rga apparently had a full hard drive. 
There was 1 Gig log file in /var/log directory,
called Xorg.0.log.old which I deleted which
  
  4085   Wed Dec 22 06:50:19 2010 ranaUpdateelogelogd is getting killed by SureshAfter another elog crash, I've blacklisted
the domain that Suresh is using by editing
the apache httpd.conf. Let's see what happens
  
  4086   Wed Dec 22 11:24:23 2010 haixingUpdateSUSmeasurement of imbalance in quadrant maglev protopeYesterday, a sequence of force and gain
measurement was made to determine the imbalance
in the
 config_2x2.png 
  4087   Wed Dec 22 15:30:47 2010 OsamuUpdateASCETMY oplev fixedAccording to c1scy.mdl, OL signals should
be connected to adc_0_24 to adc_0_27 but
they were connected to adc_0_16 to adc_0_19
  
  4088   Wed Dec 22 15:47:22 2010 KojiUpdateVACTank closing procedure[Jenne Kiwamu Joe Osamu Steve Koji]
Yesterday (21st), we closed the BSC
and the four testmass chambers.
  
  4091   Thu Dec 23 03:15:11 2010 KojiUpdateelogelogd is getting killed by SureshELOG has crashed and I restarted it.
Actually the filtering is not effective
so far as elog is not using apache but has
  
  4092   Thu Dec 23 08:54:32 2010 SureshUpdateelogthe delhi univ syndromeSorry folks!  I couldnt get to the
elog and didnt know that the elog was crashing
every time I tried to access it. 
  
  4093   Thu Dec 23 12:19:43 2010 kiwamuUpdateGreen Lockinginstalled doubling oven base at PSL tableI
gave a christmas present to a doubling oven
who has been sitting on the PSL table.
 DSC_2820_ss.jpgDSC_2814_ss.jpgDSC_2815_ss.jpg 
  4095   Thu Dec 23 18:51:37 2010 ranaUpdateGreen Lockinginstalled doubling oven base at PSL tableThis is not such a bad base design, but
remember that we have to get a couple of parts
  
  4096   Thu Dec 23 22:13:50 2010 KojiUpdateGeneralPZT HV turned onThe four IOO PZTs have been turned on in
order to confirm the alignment of the IFO.
Once they are turned on, the spots
  
  4097   Fri Dec 24 09:01:33 2010 josephbUpdateCDSBorrowed ADCOsamu has borrowed an ADC card from the
LSC IO chassis (which currently has a flaky
generation 2 Host interface board). 
  
  4099   Fri Dec 31 12:41:02 2010 ranaUpdateGeneralIR flashesI came in today to check up on the StripTool
and burn the Ubuntu LTS (new CDS OS) DVD.
I was pretty excited to see the PRM flashes
 Untitled.png 
  4101   Sat Jan 1 19:13:40 2011 ranaUpdateCDSc1pem now recording data I found that there was no PEM data
nor any other data (no SUS or otherwise.
No testpoints, no DAQ).
 Untitled.png 
  4103   Tue Jan 4 02:58:53 2011 JenneUpdateIOOPower into Mode Cleaner increasedWhat was the point:
I twiddled with several different
  
  4104   Tue Jan 4 11:06:32 2011 KojiUpdateIOOPower into Mode Cleaner increased- Previously MC TRANS was 9000~10000 when
the alignment was good. This means that the
MC TRANS PD is saturated if the full power
  
  4105   Tue Jan 4 13:57:48 2011 kiwamuUpdateIOOincident mirror changed from 45deg to 0 degI replaced the final steering mirror
(Y1-1037-45-S)
in the zig-zag path on the PSL table by a
  
  4106   Tue Jan 4 15:12:33 2011 SureshUpdateIOOMC Trans Mon QPD gain decreased by 10 Decreased
the gain of MC-Trans-Mon QPD ckt
The
  
  4107   Tue Jan 4 18:37:18 2011 JenneUpdateIOOMCWFS alignedI undid Yuta's
temporary setup, and put beam back on both
  
  4108   Tue Jan 4 21:21:57 2011 kiwamuUpdateIOOPZTs are connected to c1iscauxI connected
PZT1 and PZT2 to a slow front end machine
 Screenshot20110104.png 
  4110   Wed Jan 5 03:06:02 2011 kiwamuUpdateIOObeam spots on MC mirrorsI checked
the spot positions on MC1 and MC3 by running
  