40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 122 of 357  Not logged in ELOG logo
    Reply  Mon Nov 30 15:17:57 2015, Koji, Update, LSC, LO level check for the LSC RF distribution box 
    Reply  Thu Sep 15 21:12:53 2022, Paco, Update, BHD, LO phase "dc" control lophase_oltf.pdflophase_noise_spectra.pdf
Entry  Fri Mar 3 18:47:13 2023, Paco, Summary, BHD, LO phase POS noise coupling - I lophasenoise_bh55Qcontrol.pngbhnoisecoupling_excscreenshot.pngbh55q_noisecoupling.pngbh44q_noisecoupling.png
    Reply  Tue Dec 6 17:12:23 2022, yehonathan, Summary, BHD, LO phase control using audio (MICH and AS1) + RF Screenshot_2022-12-06_16-44-37_LOPHASE_OLTF_BH55_Q_AS1dither.pngScreenshot_2022-12-06_17-10-47_LOPHASE_OLTF_BH55_Q_BSdither.png
    Reply  Tue Oct 25 17:27:11 2022, Paco, Summary, BHD, LO phase control with RF + audio sidebands Screenshot_2022-10-25_17-36-45_LOPHASELOCKED.pngScreenshot_2022-10-25_17-33-33_LOPHASELOCKING_MICHBHD_ELP80_280HzDither.png
    Reply  Wed Oct 26 16:04:12 2022, Paco, Summary, BHD, LO phase control with RF + audio sidebands 
    Reply  Fri Oct 21 16:15:10 2022, yuta, Summary, BHD, LO phase locking with BH55 audio dither trials Screenshot_2022-10-21_15-33-18_LO_OLTF_LO1_BH55_Q.pngScreenshot_2022-10-21_15-42-50_LO_OLTF_LO1_BHDCDIFF.pngScreenshot_2022-10-21_15-44-53_MICH_OLTF.pngScreenshot_2022-10-21_15-50-43_LO_OLTF_LO1_BH55_Q_MICH.pngScreenshot_2022-10-21_16-11-16.png
    Reply  Mon Oct 3 15:19:05 2022, Paco, Update, BHD, LO phase noise and control after violin mode filters filters_c1sus_lo1_lsc.pngBHDC_asd_act.pngboosted_lo_phase_control.png
Entry  Thu Mar 23 17:47:53 2023, Paco, Update, NoiseBudget, LO phase noise budget (BH55_Q) lophase_cal_nb_20230322.pngPXL_20230323_202125206.jpgPXL_20230323_194150923.jpg
    Reply  Mon Mar 20 20:27:30 2023, yuta, Update, BHD, LO phase noise contribution in MICH BHD MICH_Sensitivity_20230320.pdfMICH_Sensitivity_20230320_BH55Contribution.pdfMICH_Sensitivity_20230320_BH44Contribution.pdf
    Reply  Tue Mar 14 18:44:39 2023, yuta, Update, BHD, LO phase noise measurements in ITMX single bounce, MICH and FPMI BH555_BH44_LO_PHase_Control_Comparison.pdf
    Reply  Tue Apr 18 19:29:43 2023, yuta, Update, BHD, LO phase noise measurements in ITMX single bounce, MICH and FPMI Screenshot_2023-04-18_19-48-11.pngBH555_BH44_LO_Phase_Control_Noise_Budgets.pdfBH55_BH44_LO_Phase_Control_Noise_Budgets.zipBH44_LO_Phase_Noise.pdf
    Reply  Fri Sep 30 20:18:55 2022, Paco, Update, BHD, LO phase noise with different actuation points BHDC_asd_actuation_point.png
Entry  Mon Apr 24 19:11:20 2023, Koji, Summary, BHD, LO/MI(DARM) signal strength comparison between the configurations 
    Reply  Wed Apr 26 11:27:49 2023, Paco, Summary, BHD, LO/MI(DARM) signal strength comparison between the configurations with finesse 
    Reply  Tue Nov 28 17:24:44 2023, Radhika, Update, General, LO/POP beams aligned 7x
    Reply  Tue Jan 11 12:19:12 2022, Anchal, Summary, BHD, LO1 Input Matrix Diagonalization performed. LO1_SUS_InpMat_Diagnolization.pdfLO1_FreeSwingData_PeakFitting.pdf
    Reply  Wed Jun 15 15:45:37 2022, yuta, Update, SUS, LO1 LLCOIL now working, it was loose connection Measurement.JPGBAD.JPGScreenshot_2022-06-15_15-59-05.png
    Reply  Tue Sep 6 17:39:40 2022, Paco, Update, SUS, LO1 LO2 AS1 AS4 damping loop step responses LO1_Step_Response_Test_2022-09-06_17-19.pdfLO2_Step_Response_Test_2022-09-06_17-30.pdfAS1_Step_Response_Test_2022-09-06_17-53.pdfAS4_Step_Response_Test_2022-09-06_18-16.pdf
    Reply  Mon Jan 10 14:52:51 2022, Anchal, Summary, BHD, LO1 OSEMs roughly calibrated and noise measured LO1_vs_ETMX_OSEM_Spectrum_LF_x30_Gain.pdfLO1_vs_ETMX_OSEM_Spectrum_HF_x30_Gain.pdf
Entry  Wed Mar 1 19:18:18 2023, Paco, Update, SUS, LO1 dewhitening uncalibrated_lo_phase_errctrl.png
    Reply  Thu Mar 2 10:54:25 2023, Paco, Update, SUS, LO1 dewhitening uncalibrated_lo_phase_errctrl_ADW.png
    Reply  Mon Jan 10 18:36:41 2022, Anchal, Summary, BHD, LO1 free swinging test set to trigger 
Entry  Fri May 13 14:26:00 2022, JC, Update, Alignment, LO2 Beam 
    Reply  Wed Jun 15 15:07:07 2022, Koji, Update, SUS, LO2 SUS stuck fixed Screenshot_2022-06-15_15-00-22.pngScreenshot_2022-06-15_15-00-40.png
Entry  Tue Jun 14 18:45:43 2022, Anchal, Update, SUS, LO2 lower magnets are stuck in coil, won't come off 
    Reply  Mon Dec 14 13:08:33 2009, Koji, Update, Treasure, LOCKSTARS 
    Reply  Mon Dec 14 14:16:14 2009, Alberto, Update, Treasure, LOCKSTARS 
Entry  Thu Oct 13 20:25:32 2011, Katrin, Update, Green Locking, LPF transfer function YARM designLPF.pngLC_LPF.TIF
Entry  Thu Aug 2 03:06:57 2012, Sasha, Update, Simulations, LS Plant (LSP) is officially ONLINE Screenshot-1.png
Entry  Wed May 11 13:54:32 2011, steve, Update, LSC, LSC power supplies P1070679.JPG
Entry  Thu Apr 14 01:03:43 2011, Koji, Update, LSC, LSC Campaign ~ Status 
Entry  Fri Aug 12 16:42:51 2011, Yoichi, Configuration, LSC, LSC Feed Forward Compensator FFCinLSC.pngFFC.png
Entry  Fri Jul 24 20:32:15 2015, ericq, Update, Electronics, LSC LO distribution box power button replaced  2015-07-24_15.43.56.jpg2015-07-24_16.57.19.jpg
Entry  Tue Sep 20 02:21:10 2011, Koji, Update, LSC, LSC MEDM screen cleaning up 
Entry  Thu Aug 14 18:31:45 2014, ericq, Update, LSC, LSC Modeling Update 7x
Entry  Mon Jul 18 14:39:53 2011, Jenne, Update, Computers, LSC PD chans acquired 
    Reply  Thu Jul 7 02:23:59 2011, Jenne, Summary, LSC, LSC Whitening Filters have been fit AS55Q.png
    Reply  Thu Jul 7 15:34:44 2011, Jenne, Summary, LSC, LSC Whitening Filters have been fit 
Entry  Wed Sep 16 23:07:06 2015, rana, Update, Electronics, LSC Whitening board: LP filters added, pictures taken 20150916_221210.jpgout.pdf
Entry  Sat Dec 21 01:54:04 2013, Koji, Configuration, LSC, LSC Whitening for the DCPDs/CM servo replaced 
Entry  Tue Sep 17 18:44:29 2013, Masayuki, Update, LSC, LSC calibration screen calibration_screen.png
    Reply  Fri Sep 20 22:49:10 2013, Masayuki, Update, LSC, LSC calibration screen plot.pdf
    Reply  Wed Sep 25 08:11:01 2013, Masayuki, Summary, LSC, LSC calibration screen plot.pdfScreenshot.pngScreenshot-1.pngfringe.pdf
    Reply  Fri Sep 27 13:55:11 2013, Masayuki, Update, LSC, LSC calibration screen 
    Reply  Fri Sep 27 21:01:50 2013, Masayuki, Update, LSC, LSC calibration screen 
    Reply  Mon Sep 30 11:33:15 2013, rana, Update, LSC, LSC calibration screen 
Entry  Fri Mar 14 15:52:07 2008, rob, Configuration, LSC, LSC code change 
Entry  Thu Mar 20 16:06:27 2008, rob, Configuration, LSC, LSC code change 
Entry  Tue Apr 7 21:39:57 2009, Yoichi, Configuration, Computers, LSC code recompiled with a fix for denormalization problem 
ELOG V3.1.3-