  3560   Sun Sep 12 23:02:53 2010 valeraUpdate PMC mode matchingKiwamu and I found that the first lens
in the PMC mode matching telescope was mislabeled.
It is supposed to be PLCX-25.4-77.3-C and
 pmc.pdfpmc-abcd.tiff 
  3561   Sun Sep 12 23:16:52 2010 valeraUpdate FSS mode matchingThe attached plot shows the beam scans
of the beam leaking from the back mirror
of the PMC to the BS cube that first turns
 fss.pdffssaom-abcd.tifffssrc-abcd.tiff 
  3562   Mon Sep 13 00:19:32 2010 ranaUpdate VCO Driver Output power v. slider control voltageI measured the RF power output of the VCO
Driver box as a function of slider value.
I measured using the Gigatronics Handheld
 vco.png 
  3564   Mon Sep 13 10:22:48 2010 josephbUpdateCDSRCG bugs/feature request wiki pageI've started a wiki page under the Upgrade
09/New CDS section regarding known bugs and
pending feature requests for the Real Time
  
  3565   Mon Sep 13 11:40:50 2010 AlbertoUpdateElectronicsFrequency Box Documentation Added to the SVNI uploaded all the material about the RF
frequency Generation Box  into the SVN under
the path:
 freqBoxSVNdierctoryStructure.png 
  3566   Mon Sep 13 11:49:34 2010 kiwamuUpdatePSLmode matching from PMC to IMCI have been working on the mode matching
lenses which are sitting after the boradband
EOM.
 psl_mmt1.pngnewMM.png 
  3568   Mon Sep 13 19:41:38 2010 ranaUpdatePSLFSS AOM alignmentThe IR sensitive Olympus 570 camera gives
us a really nice view of these IR beams.
Its actually a lot better than what you can
  
  3569   Mon Sep 13 21:52:53 2010 kiwamuUpdateGreen Lockingthe X end laser is ON
 I turned ON the laser
at the X end station, which had
  
  3572   Tue Sep 14 18:07:41 2010 AlbertoUpdateElectronicsFrequency Box Documentation Added to the SVNI completed a LIGO document describing
design, construction and characterization
of the RF System for the 40m upgrade.
  
  3573   Wed Sep 15 01:27:52 2010 rana, steve, valeraUpdatePSLFSS cables connected- connected the TTFSS cables (FSS fast
goes directly to NPRO PZT for now)
- measured the reference cavity 21.5
  
  3574   Wed Sep 15 01:58:28 2010 valeraUpdatePSLFSS lockingThe RefCav is locked and aligned. I changed
the fast gain sign by changing the jumper
setting on the TTFSS board. The RefCav visibility
 DSC_2510.JPG 
  3575   Wed Sep 15 03:08:26 2010 KojiUpdatePSLFSS lockingBrilliant! This is the VERY way
how the things are to be conquered!

  
  3577   Wed Sep 15 16:00:26 2010 koji, steveUpdateMOPA We removed the Lightwave MOPA Controller
from 1X1 (south)  It was a real painfully
messy job to pull out the umbilical.
  
  3578   Wed Sep 15 16:12:35 2010 koji, steveUpdateMOPAMOPA Controller is taken out of the PSL rackWe removed the Lightwave MOPA Controller,
PA#102, NPRO206 power supply to make room
for the IOO chassy at 1X1 (south) rack.
 P1060843.JPG 
  3580   Fri Sep 17 01:36:14 2010 valeraUpdate PMC line widthThe attached plots show the PMC cavity
line width measurement with 1 mW and 160
mW into the PMC. The two curves on each plot
 TEK00009.PNGTEK00010.PNG 
  3581   Fri Sep 17 03:06:06 2010 KojiUpdateSUSSOS sent for bakingTwo SOS suspensions for the ETMs were
disassembled and packed for cleaning and
baking by Bob.
 IMG_3596.jpgIMG_3597.jpg 
  3582   Fri Sep 17 03:32:11 2010 KojiUpdateSUSArrangement of the SUS towersThe day before yesterday, I was cleaning
a flow bench in the clean room.
I found that one SOS was standing
  
  3583   Fri Sep 17 12:11:42 2010 josephbUpdateCDSDowns updateIn doing a re-inventory prior to the IOO
chassis installation, I re-discovered we
had a missing interface board that goes in
  
  3584   Fri Sep 17 14:55:01 2010 josephbUpdateCDSTook 5565 RFM card from IOVME to place in the new IOO chassisI took the 5565 RFM card out of the IOVME
machine to so I could put it in the new IO
chassis that will be replacing it. 
  
  3585   Fri Sep 17 17:35:35 2010 steveUpdatePEMcleaned up at 1Y1 PSL rackCleaned up cables on the top and bottom.
Vacuumed both areas. We still have some remaining
shading from the MOPA umbilical and more
  
  3589   Mon Sep 20 11:39:45 2010 josephbUpdateCDSSwitch overI talked to with Alex this morning, discussing
what he needed to do to have a frame builder
running that was compatible with the new
  
  3590   Mon Sep 20 16:59:26 2010 josephbUpdateCDSMegatron in 1X2 rack, to be come c1ioo[Rana, Koji, Joe]
We pulled the phase shifters in the
1X2 rack out to make room for megatron. 
  
  3593   Tue Sep 21 16:05:21 2010 josephbUpdateCDSFirst pass at rack diagramI've made a first pass at a rack diagram
for the 1X1 and 1X2 racks, attached as png.
Gray is old existing boards, power
 1X1_1X2_racks.png 
  3594   Wed Sep 22 16:35:45 2010 josephbUpdateCDSFibers pulled, new FB install tomorrow[Aidan, Tara, Joe]
We pulled out what used to be the
LSC/ASC fiber from the 1Y3 arm rack, and
  
  3600   Thu Sep 23 12:05:20 2010 josephb, alexUpdateCDSfb40m down, new fb in progressAlex came over this morning and we began
work on the frame builder change over. 
This required fb40m be brought down and disconnected
  
  3602   Thu Sep 23 21:01:11 2010 josephb, alexUpdateCDSfb40m still down, new fb still in progressUnfortunately, copying the data to the USB/SATA
drive over at downs took longer than expected
for Alex.  We will be installing the new
  
  3604   Fri Sep 24 00:56:35 2010 koji, taraUpdateElectronicstesting TTFSSWe
found that a transistor was broken from yesterday
spark too. We partially fixed TTFSS, and
  
  3606   Fri Sep 24 22:58:40 2010 josephbUpdateCDSModified front end medm screensTo startup medm screens for the new suspension
front end, do the following:
1) From a control room machine, log
  
  3607   Fri Sep 24 23:47:10 2010 koji, taraUpdateElectronicstesting TTFSS  Q3, a PZT2222A transistor,
on D0901846 is replaced by a GE-82. However,
the board is still not fully function.
  
  3608   Sat Sep 25 19:01:13 2010 KojiUpdateElectronicstesting TTFSSHow much current do you need for each voltages?
GE-82 was the only PNP transister
I could find in the lab. It's too old but
  
  3609   Sun Sep 26 18:29:23 2010 rana, JohnUpdateCDSModified front end medm screensIssues
 megamind-poster3.jpg 
  3610   Mon Sep 27 00:33:50 2010 ranaUpdatePSLHigh Voltage Driver added to TTFSS -> NPROWe added the Thorlabs HV Driver in
between the FSS and the NPRO today.
The FSS is locking with it, but we
  
  3612   Mon Sep 27 17:35:13 2010 josephbUpdateCDSUpdated Suspension screens/Megatron now c1ioo/Further work on fbThe medm screens have been updated further,
with the hidden matrices added in bright
colors.  An example screen shot is attached.
 MC1_Example_Screen.png 
  3613   Mon Sep 27 21:57:59 2010 ZachUpdateelogelog restarted took two runs of the script as usual   
  3615   Tue Sep 28 10:07:29 2010 josephbUpdateCDSUpdated Suspension screens/Megatron now c1ioo/Further work on fb

    
        
  
  3616   Tue Sep 28 14:12:14 2010 steveUpdateGeneralvertex crane drive is out of orderThe vertex crane drive is overheating,
it stopped functioning. Service man will
be here tomorrow morning.
  
  3617   Tue Sep 28 21:11:52 2010 koji, taraUpdateElectronicsFixing the new TTFSSWe
found a small PCB defect which is an excess
copper shorting circuit on the daughter board,
 before.jpgafter.jpgbefore.jpgafter.jpg 
  3618   Wed Sep 29 01:53:44 2010 ranaUpdatePSLpaths broken and VCO turned offI found that several linux libraries have
been moved around and disabled today. In
particular, I see a bunch of new stuff in
  
  3619   Wed Sep 29 11:18:36 2010 josephbUpdateCDSApps code changesAfter asking Alex specifically what he
did yesterday after I left, he indicated
he copied  a bunch of stuff from Hanford,
  
  3621   Wed Sep 29 15:34:46 2010 kiwamuUpdateGeneralfixing vertex crane
    

       
            
  
  3622   Wed Sep 29 16:56:36 2010 yutaUpdateVAC2 doors opened(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday,
  
  3623   Wed Sep 29 18:28:32 2010 yutaUpdateComputersaldabella connects to the wireless networkBackground:
 We need laptops that connect
to the wireless network to use them in the
  
  3624   Thu Sep 30 09:34:58 2010 steveUpdateGeneralvertex crane trolly drive fixed


   
        
            
 P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG 
  3625   Thu Sep 30 11:07:20 2010 josephb, alexUpdateCDStest points starting to workThe centos 5.5 compiled gds code is currently
living on rosalba in the /opt/app directory
(this is local to Rosalba only).  It
  
  3626   Thu Sep 30 13:43:29 2010 steveUpdateSAFETYpropane gas smell in control roomThe control room's north west corner smelled
like propane gas  yesterday around 16:30
We all agreed that the smell was
  
  3627   Thu Sep 30 14:09:33 2010 yutaUpdateComputersmariabella connects to the wireless networkBackground:
 We need laptops that connect
to the wireless network to use them in the
  
  3628   Thu Sep 30 16:29:35 2010 josephb, alexUpdateCDSfb updateThere currently seems to be a timing issue
with  the frame builder.  We switched
over to using a symmetricom card to get an
  
  3629   Thu Sep 30 17:11:01 2010 alex iUpdateCDSDAQ system updateThe frame builder is timed from the Symmetricom
GPS card now, which is getting the IRIGB
timecode from the freq. distribution amplifier
  
  3630   Thu Sep 30 18:51:50 2010 yutaUpdateComputerssetting up aldabella and mariabella(Kiwamu, Yuta)

Background:
  
  3631   Thu Sep 30 21:55:31 2010 ranaUpdateCDSDAQ sys updateIts pretty exciting to see that Joe got
Alex to actually use the ELOG. Its a proof
that even rare events occur if you are patient
 Untitled.png 