40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 120 of 344  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  16260   Tue Jul 27 20:12:53 2021 KojiUpdateBHDSOS assembly1 or 2. The stained ones are just fine.
If you find the vented 1/4-20 screws in the
clean room, you can use them.
  
  16278   Thu Aug 12 14:59:25 2021 KojiUpdateGeneralPSL shutter was closed this morningWhat I was afraid of was the vacuum interlock.
And indeed there was a pressure surge this
morning. Is this real? Why didn't we
 Screen_Shot_2021-08-12_at_14.58.59.png 
  16279   Thu Aug 12 20:52:04 2021 KojiUpdateGeneralPSL shutter was closed this morningI did a bit more investigation on this.

- I checked P1~P4, PTP2/3, N2,
TP2, TP3. But found only P1a and P2 were
 Screen_Shot_2021-08-12_at_20.51.19.pngScreen_Shot_2021-08-12_at_20.51.34.png 
  16281   Tue Aug 17 04:30:35 2021 KojiUpdateSUSNew electronicsReceived:

Aug 17, 2021 2x ISC Whitening

Delivered 2x Sat Amp board to Todd
 P_20210816_234136.jpgP_20210816_235106.jpgP_20210816_234220.jpg 
  16284   Thu Aug 19 14:14:49 2021 KojiUpdateCDSTime synchornization not running131.215.239.14 looks like Caltech's
NTP server (ntp-02.caltech.edu)
https://webmagellan.com/explore/caltech.edu/28415b58-837f-4b46-a134-54f4b81bee53
  
  16288   Mon Aug 23 11:51:26 2021 KojiUpdateGeneralCampus Wide Power Glitch Reported: Monday, 8/23/21 at 9:30am Campus
Wide Power Glitch Reported:
Monday, 8/23/21 at 9:30am (more like 9:34am
  
  16290   Mon Aug 23 19:00:05 2021 KojiUpdateGeneralCampus Wide Power Glitch Reported: Monday, 8/23/21 at 9:30am Restarting the RTS was unsuccessful because
of the timing discrepancy error between the
RT machines and the FB. This time no matter
  
  16294   Tue Aug 24 18:44:03 2021 KojiUpdateCDSFB is writing the frames with a year old dateDan Kozak pointed out that the new frame
files of the 40m has not been written in
2021 GPS time but 2020 GPS time.
 Screen_Shot_2021-08-24_at_18.46.24.png 
  16306   Wed Sep 1 21:55:14 2021 KojiSummaryGeneralTowards the end upgrade- Sat amp
mod and test: on going (Tega)
- Coil driver mod and test: on going
  
  16308   Thu Sep 2 19:28:02 2021 KojiUpdate This week's FB1 GPS Timing Issue SolvedAfter the disk system trouble, we could
not make the RTS running at the nominal state.
A part of the troubleshoot FB1 was rebooted.
  
  16309   Thu Sep 2 19:47:38 2021 KojiUpdateCDSThis week's FB1 GPS Timing Issue SolvedAfter the reboot daqd_dc was not working,
but manual starting of open-mx / mx services
solved the issue.
  
  16310   Thu Sep 2 20:44:18 2021 KojiUpdateCDSChiara DHCP restartedWe had the issue of the RT machines rebooting.
Once we hooked up the display on c1iscex,
it turned out that the IP was not given at
  
  16311   Thu Sep 2 20:47:19 2021 KojiUpdateCDSChiara DHCP restarted[Paco, Tega, Koji]

Once chiara's DHCP is back,
things got much more straight forward.
  
  16312   Thu Sep 2 21:21:14 2021 KojiSummaryComputersVacuum recovery 2Attachment 1:
We are pumping the main volume with
TP2. Once P1a reached the pressure ~2.2mtorr,
 Screenshot_2021-09-02_21-20-24.pngScreenshot_2021-09-02_21-20-48.png 
  16316   Wed Sep 8 18:00:01 2021 KojiUpdateVACcronjobs & N2 pressure alertIn the weekly meeting, Jordan pointed out
that we didn't receive the alert for
the low N2 pressure.
  
  16317   Wed Sep 8 19:06:14 2021 KojiUpdateGeneralBackup situationTega mentioned in the meeting that it could
be safer to separate some of nodus's
functions from the martian file system.
  
  16328   Tue Sep 14 17:14:46 2021 KojiUpdateSUSSOS Tower HardwareYup this is OK. No problem.

 
  
  16331   Tue Sep 14 19:12:03 2021 KojiSummaryPEMExcess seismic noise in 0.1 - 0.3 Hz bandLooks like this increase is correlated
for BS/EX/EY. So it is likely to be real.

Comparison between 9/15
 C1-ALL_393F21_SPECTRUM-1315699218-86400.pngC1-ALL_393F21_SPECTRUM-1315267218-86400.png 
  16333   Wed Sep 15 23:38:32 2021 KojiUpdateALSALS ASX PZT HV was off -> restoredIt was known that the Y end ALS PZTs are
not working. But Anchal reported in the meeting
that the X end PZTs are not working too.
 P_20210915_151333.jpg 
  16334   Wed Sep 15 23:53:54 2021 KojiSummaryGeneralTowards the end upgradeOrdered compoenents are in.

- Made 36 more Sat Amp internal
boards (Attachment 1). Now
 P_20210915_231308.jpgP_20210915_225039.jpgP_20210915_224341.jpg 
  16335   Thu Sep 16 00:00:20 2021 KojiUpdateGeneralRIO Planex 1064 Lasers in the south cabinetRIO Planex 1064 Lasers in the south cabinet

Property Number C30684/C30685/C30686/C30687
 P_20210915_232426.jpg 
  16336   Thu Sep 16 01:16:48 2021 KojiUpdateGeneralFrozen 2It happened again. Defrosting required.  P_20210916_003406_1.jpg 
  16341   Fri Sep 17 00:56:49 2021 KojiUpdateGeneralAwesomeThe
Incredible Melting Man!

 
  
  16342   Fri Sep 17 20:22:55 2021 KojiUpdateSUSEQ M4.3 Long beachEQ  M4.3 @longbeach
2021-09-18 02:58:34 (UTC) / 07:58:34
(PDT)
  
  16344   Mon Sep 20 14:11:40 2021 KojiUpdateBHDEnd DAC Adapter Unit D2100647I've uploaded the schematic and PCB
PDF for End DAC Adapter Unit D2100647.

Please review the design.
 D2100647_End_DAC_Adapter.pdf 
  16350   Mon Sep 20 21:56:07 2021 KojiUpdateComputersWifi internet fixedUg, factory resets... Caltech IMSS announced
that there was an intermittent network service
due to maintenance between Sept 19 and 20.
  
  16376   Mon Oct 4 18:00:16 2021 KojiSummaryCDSc1teststand problems summaryI don't know anything about
mx/open-mx, but you also need open-mx,don't
you?
  
  16378   Mon Oct 4 20:46:08 2021 KojiUpdateElectronicsSatellite amp box adaptersThanks. You should be able to find the
chassis-related hardware on the left side
of the benchtop drawers at the middle workbench.
  
  16380   Tue Oct 5 17:01:20 2021 KojiUpdateElectronicsSat Amp modificationsMake sure the inputs for the PD amps are
open. This is the current amplifier and we
want to leave the input pins open for the
  
  16387   Thu Oct 7 02:04:19 2021 KojiUpdateElectronicsSatellite amp adapter chassisThe 4 units of Satellite Amp Adapter were
done:
- The ears were fixed with the screws
 P_20211006_205044.jpg 
  16397   Tue Oct 12 23:42:56 2021 KojiSummaryCDSConnected c1sus2 to martian networkDon't you need to add the new
hosts to /diskless/root/etc/rtsystab at fb1?
--> There looks many elogs talking about
  
  16404   Thu Oct 14 18:30:23 2021 KojiSummaryVACFlange/Cable Stand ConfigurationFlange Configuration for BHD

We will need total 5 new
cable stands. So Qty.6 is the number to be
 40m_flange_layout_20211014.pdf 
  16408   Fri Oct 15 17:17:51 2021 KojiSummaryGeneralVent PrepI took over the vent prep: I'm going
through the list in [ELOG
15649] and [ELOG
 7x 
  16409   Fri Oct 15 20:53:49 2021 KojiSummaryGeneralVent PrepFrom
the IFO point of view, all look good and
we are ready for venting from Mon Oct 18
  
  16410   Mon Oct 18 10:02:17 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Anchal, Koji]

- Checked the main volume is isolated.
- TP1 and TP2 were made isolated from
 Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png 
  16412   Tue Oct 19 10:59:09 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Yehonathan, Anchal,
Koji]

North door of the BS chamber opened
  
  16413   Tue Oct 19 11:30:39 2021 KojiUpdateVACHow to vent TP1I learned that TP1 was vented through the
RGA room in the past. This can be done by
opening VM2 and a manual valve ("needle
 Screen_Shot_2021-10-18_at_14.52.34.png 
  16415   Tue Oct 19 23:43:09 2021 KojiSummaryCDSc1sus2 DAC to ADC test(Because of a totally unrelated reason)
I was checking the electronics units for
the upgrade. And I realized that
 P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg 
  16418   Wed Oct 20 15:58:27 2021 KojiUpdateVACHow to vent TP1Probably the hard disk of c0rga is dead.
I'll follow up in this elog later today.

Looking at the log in /opt/rtcds/caltech/c1/scripts/RGA/logs
  
  16428   Tue Oct 26 14:53:24 2021 KojiUpdateElectronicsRack1. We have a rack at the 40m storage. We
are free to take it to the lab. If there
is a tag, tell the info to Liz. Let's
 P_20211026_143814.jpg 
  16434   Wed Oct 27 18:11:37 2021 KojiSummaryBHDPart II of BHR upgrade - Relocation of TT2 and MMT1/2 alignmentClosed the PSL shutter @18:11
During the vent, we want to keep the
cavity unlocked if not necessary.
  
  16435   Wed Oct 27 18:16:45 2021 KojiSummaryBHDPart II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment- Moving the MMT2 south by a cm is fine.
This will give you ~0.5cm at TT1 without
changing the other alignment much.
  
  16436   Wed Oct 27 19:34:52 2021 KojiSummaryElectronicsNew electronics racks1. The rack we cleaned today (came from
West Bridge) will be placed between 1X3 and
1X4, right next to 1X4 (after removing the
 P_20211027_180737.jpgP_20211027_180443.jpgP_20211027_180408.jpgP_20211027_180139.jpg 
  16442   Mon Nov 1 14:51:34 2021 KojiUpdateGeneralChecking the vent planThe vent team described
a detailed vent plan (and reports where the
actions have been performed)
  
  16446   Tue Nov 2 22:50:30 2021 KojiUpdateBHDSOS assembly2.5Hz is surprising. Can you move it down
to sub 1Hz by adding a socket cap screw at
the top instead of the set screw for the
  
  16448   Thu Nov 4 15:03:43 2021 KojiSummaryBHD1Y1 rack workI have visited the binder file for the
40m wiring file in the control room.
The 12V power supply on 1Y1 is for
  
  16452   Fri Nov 5 20:35:10 2021 KojiUpdateBHDFeedthru / Optical Mounts- New feedthrus [4xDB25 Qty 4 / 8xDB25
Qty 1] are placed on the wire shelf at the
entrance -> Jordan, please clean them.
 P_20211105_200817.jpg 
  16454   Mon Nov 8 13:13:00 2021 KojiSummaryBHD1Y1 rack work; Sorensens removedUpdated the rack layout. Now there is an
issue.
We were supposed to have 1U space
 40m_BHD.png 
  16458   Mon Nov 8 18:42:38 2021 KojiSummaryBHDRack Layout / Power Strips


Rack
 rack_plan.pdf 
  16464   Thu Nov 11 00:11:39 2021 KojiSummarySUS2" to 3" sleeve issueYehonathan and Tega found that the new
PR3 and SR3 delivered in 2020 is in fact 3/4"
 6x 
ELOG V3.1.3-