    Reply  Fri Sep 17 00:56:49 2021, Koji, Update, General, Awesome 
Entry  Fri Sep 17 20:22:55 2021, Koji, Update, SUS, EQ M4.3 Long beach 
Entry  Mon Sep 20 14:11:40 2021, Koji, Update, BHD, End DAC Adapter Unit D2100647 D2100647_End_DAC_Adapter.pdf
    Reply  Mon Sep 20 21:56:07 2021, Koji, Update, Computers, Wifi internet fixed 
    Reply  Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary 
    Reply  Mon Oct 4 20:46:08 2021, Koji, Update, Electronics, Satellite amp box adapters 
    Reply  Tue Oct 5 17:01:20 2021, Koji, Update, Electronics, Sat Amp modifications 
    Reply  Thu Oct 7 02:04:19 2021, Koji, Update, Electronics, Satellite amp adapter chassis P_20211006_205044.jpg
    Reply  Tue Oct 12 23:42:56 2021, Koji, Summary, CDS, Connected c1sus2 to martian network 
Entry  Thu Oct 14 18:30:23 2021, Koji, Summary, VAC, Flange/Cable Stand Configuration 40m_flange_layout_20211014.pdf
    Reply  Fri Oct 15 17:17:51 2021, Koji, Summary, General, Vent Prep 7x
    Reply  Fri Oct 15 20:53:49 2021, Koji, Summary, General, Vent Prep 
Entry  Mon Oct 18 10:02:17 2021, Koji, Update, VAC, Vent Started / Completed Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png
    Reply  Tue Oct 19 10:59:09 2021, Koji, Update, VAC, Vent Started / Completed 
    Reply  Tue Oct 19 11:30:39 2021, Koji, Update, VAC, How to vent TP1 Screen_Shot_2021-10-18_at_14.52.34.png
    Reply  Tue Oct 19 23:43:09 2021, Koji, Summary, CDS, c1sus2 DAC to ADC test P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg
    Reply  Wed Oct 20 15:58:27 2021, Koji, Update, VAC, How to vent TP1 
Entry  Tue Oct 26 14:53:24 2021, Koji, Update, Electronics, Rack P_20211026_143814.jpg
    Reply  Wed Oct 27 18:11:37 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
    Reply  Wed Oct 27 18:16:45 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
Entry  Wed Oct 27 19:34:52 2021, Koji, Summary, Electronics, New electronics racks P_20211027_180737.jpgP_20211027_180443.jpgP_20211027_180408.jpgP_20211027_180139.jpg
Entry  Mon Nov 1 14:51:34 2021, Koji, Update, General, Checking the vent plan 
    Reply  Tue Nov 2 22:50:30 2021, Koji, Update, BHD, SOS assembly 
    Reply  Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work 
Entry  Fri Nov 5 20:35:10 2021, Koji, Update, BHD, Feedthru / Optical Mounts P_20211105_200817.jpg
    Reply  Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed 40m_BHD.png
    Reply  Mon Nov 8 18:42:38 2021, Koji, Summary, BHD, Rack Layout / Power Strips rack_plan.pdf
Entry  Thu Nov 11 00:11:39 2021, Koji, Summary, SUS, 2" to 3" sleeve issue 6x
    Reply  Tue Nov 16 18:28:53 2021, Koji, Update, BHD, SOS assembly D2100546_Wire_Block.pdfD2100546_Wire_Block.png
    Reply  Wed Nov 17 11:53:27 2021, Koji, Update, General, wire clamp plate mod 
Entry  Thu Nov 18 14:29:01 2021, Koji, Summary, BHD, BHD invac optics / opto-mechanics 
Entry  Mon Dec 6 14:26:52 2021, Koji, Update, VAC, Pumping down the RGA section 
    Reply  Tue Dec 7 13:12:50 2021, Koji, Update, VAC, Pumping down the RGA section 
    Reply  Fri Dec 10 19:22:01 2021, Koji, Update, VAC, Pumping down the RGA section 
Entry  Fri Dec 10 21:35:15 2021, Koji, Summary, SUS, Vertex SUS DAC adapter ready PXL_20211211_053155009.jpgPXL_20211211_053209216.jpgPXL_20211211_050625141-1.jpg
    Reply  Wed Dec 15 17:44:18 2021, Koji, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 
    Reply  Thu Dec 16 15:54:08 2021, Koji, Update, Electronics, ITMX feedthroughs and in-vac cables installed PXL_20211216_235056582.jpg
    Reply  Thu Dec 16 17:41:12 2021, Koji, Update, BHD, Coil driver test failed for S2100619-v1 6x
Entry  Fri Dec 17 12:32:35 2021, Koji, Update, SUS, Remaining task for 2021 
    Reply  Fri Dec 17 19:16:45 2021, Koji, Update, BHD, SOS assembly 
    Reply  Fri Dec 17 19:19:42 2021, Koji, Update, SUS, Remaining task for 2021 PXL_20211218_030145356.MP.jpg
    Reply  Sat Dec 18 00:56:14 2021, Koji, Update, BHD, SOS assembly 
    Reply  Mon Dec 20 13:52:01 2021, Koji, Update, BHD, SOS assembly 
Entry  Tue Dec 21 16:35:39 2021, Koji, Update, VAC, ITMX NW feedthru (LO1-1) connector pin bent PXL_20211222_002019620.jpgPXL_20211222_003014068.jpg
Entry  Wed Dec 22 14:57:05 2021, Koji, Update, General, chiara local backup 
    Reply  Wed Dec 22 18:16:23 2021, Koji, Update, SUS, Remaining task for 2021 ITMX_2016_07_21.jpgScreen_Shot_2021-12-22_at_18.03.42.png
    Reply  Thu Dec 23 16:38:21 2021, Koji, Update, General, Is megatron down? (Re: chiara local backup) 
    Reply  Fri Dec 24 16:49:41 2021, Koji, Update, General, Is megatron down? (Re: chiara local backup) PXL_20211224_235652821.jpg
Entry  Sun Jan 2 20:46:46 2022, Koji, Update, SUS, End SUS Electronics building PXL_20220103_081133119.jpg
    Reply  Thu Jan 6 13:54:28 2022, Koji, Update, CDS, Yearly DAQD fix 2022! Screenshot_2022-01-06_13-57-40.png