  16341   Fri Sep 17 00:56:49 2021 KojiUpdateGeneralAwesomeThe
Incredible Melting Man!

 
  
  16342   Fri Sep 17 20:22:55 2021 KojiUpdateSUSEQ M4.3 Long beachEQ  M4.3 @longbeach
2021-09-18 02:58:34 (UTC) / 07:58:34
(PDT)
  
  16344   Mon Sep 20 14:11:40 2021 KojiUpdateBHDEnd DAC Adapter Unit D2100647I've uploaded the schematic and PCB
PDF for End DAC Adapter Unit D2100647.

Please review the design.
 D2100647_End_DAC_Adapter.pdf 
  16350   Mon Sep 20 21:56:07 2021 KojiUpdateComputersWifi internet fixedUg, factory resets... Caltech IMSS announced
that there was an intermittent network service
due to maintenance between Sept 19 and 20.
  
  16376   Mon Oct 4 18:00:16 2021 KojiSummaryCDSc1teststand problems summaryI don't know anything about
mx/open-mx, but you also need open-mx,don't
you?
  
  16378   Mon Oct 4 20:46:08 2021 KojiUpdateElectronicsSatellite amp box adaptersThanks. You should be able to find the
chassis-related hardware on the left side
of the benchtop drawers at the middle workbench.
  
  16380   Tue Oct 5 17:01:20 2021 KojiUpdateElectronicsSat Amp modificationsMake sure the inputs for the PD amps are
open. This is the current amplifier and we
want to leave the input pins open for the
  
  16387   Thu Oct 7 02:04:19 2021 KojiUpdateElectronicsSatellite amp adapter chassisThe 4 units of Satellite Amp Adapter were
done:
- The ears were fixed with the screws
 P_20211006_205044.jpg 
  16397   Tue Oct 12 23:42:56 2021 KojiSummaryCDSConnected c1sus2 to martian networkDon't you need to add the new
hosts to /diskless/root/etc/rtsystab at fb1?
--> There looks many elogs talking about
  
  16404   Thu Oct 14 18:30:23 2021 KojiSummaryVACFlange/Cable Stand ConfigurationFlange Configuration for BHD

We will need total 5 new
cable stands. So Qty.6 is the number to be
 40m_flange_layout_20211014.pdf 
  16408   Fri Oct 15 17:17:51 2021 KojiSummaryGeneralVent PrepI took over the vent prep: I'm going
through the list in [ELOG
15649] and [ELOG
 7x 
  16409   Fri Oct 15 20:53:49 2021 KojiSummaryGeneralVent PrepFrom
the IFO point of view, all look good and
we are ready for venting from Mon Oct 18
  
  16410   Mon Oct 18 10:02:17 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Anchal, Koji]

- Checked the main volume is isolated.
- TP1 and TP2 were made isolated from
 Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png 
  16412   Tue Oct 19 10:59:09 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Yehonathan, Anchal,
Koji]

North door of the BS chamber opened
  
  16413   Tue Oct 19 11:30:39 2021 KojiUpdateVACHow to vent TP1I learned that TP1 was vented through the
RGA room in the past. This can be done by
opening VM2 and a manual valve ("needle
 Screen_Shot_2021-10-18_at_14.52.34.png 
  16415   Tue Oct 19 23:43:09 2021 KojiSummaryCDSc1sus2 DAC to ADC test(Because of a totally unrelated reason)
I was checking the electronics units for
the upgrade. And I realized that
 P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg 
  16418   Wed Oct 20 15:58:27 2021 KojiUpdateVACHow to vent TP1Probably the hard disk of c0rga is dead.
I'll follow up in this elog later today.

Looking at the log in /opt/rtcds/caltech/c1/scripts/RGA/logs
  
  16428   Tue Oct 26 14:53:24 2021 KojiUpdateElectronicsRack1. We have a rack at the 40m storage. We
are free to take it to the lab. If there
is a tag, tell the info to Liz. Let's
 P_20211026_143814.jpg 
  16434   Wed Oct 27 18:11:37 2021 KojiSummaryBHDPart II of BHR upgrade - Relocation of TT2 and MMT1/2 alignmentClosed the PSL shutter @18:11
During the vent, we want to keep the
cavity unlocked if not necessary.
  
  16435   Wed Oct 27 18:16:45 2021 KojiSummaryBHDPart II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment- Moving the MMT2 south by a cm is fine.
This will give you ~0.5cm at TT1 without
changing the other alignment much.
  
  16436   Wed Oct 27 19:34:52 2021 KojiSummaryElectronicsNew electronics racks1. The rack we cleaned today (came from
West Bridge) will be placed between 1X3 and
1X4, right next to 1X4 (after removing the
 P_20211027_180737.jpgP_20211027_180443.jpgP_20211027_180408.jpgP_20211027_180139.jpg 
  16442   Mon Nov 1 14:51:34 2021 KojiUpdateGeneralChecking the vent planThe vent team described
a detailed vent plan (and reports where the
actions have been performed)
  
  16446   Tue Nov 2 22:50:30 2021 KojiUpdateBHDSOS assembly2.5Hz is surprising. Can you move it down
to sub 1Hz by adding a socket cap screw at
the top instead of the set screw for the
  
  16448   Thu Nov 4 15:03:43 2021 KojiSummaryBHD1Y1 rack workI have visited the binder file for the
40m wiring file in the control room.
The 12V power supply on 1Y1 is for
  
  16452   Fri Nov 5 20:35:10 2021 KojiUpdateBHDFeedthru / Optical Mounts- New feedthrus [4xDB25 Qty 4 / 8xDB25
Qty 1] are placed on the wire shelf at the
entrance -> Jordan, please clean them.
 P_20211105_200817.jpg 
  16454   Mon Nov 8 13:13:00 2021 KojiSummaryBHD1Y1 rack work; Sorensens removedUpdated the rack layout. Now there is an
issue.
We were supposed to have 1U space
 40m_BHD.png 
  16458   Mon Nov 8 18:42:38 2021 KojiSummaryBHDRack Layout / Power Strips


Rack
 rack_plan.pdf 
  16464   Thu Nov 11 00:11:39 2021 KojiSummarySUS2" to 3" sleeve issueYehonathan and Tega found that the new
PR3 and SR3 delivered in 2020 is in fact 3/4"
 6x 
  16471   Tue Nov 16 18:28:53 2021 KojiUpdateBHDSOS assemblyYehonathan told me that the wires
are touching between the clamps!
I went back to the CAD and confirmed
 D2100546_Wire_Block.pdfD2100546_Wire_Block.png 
  16473   Wed Nov 17 11:53:27 2021 KojiUpdateGeneralwire clamp plate modOf course, we remove the magnet-dumbbell
for machining. After that the part will be
cleaned/baked again. And Yehonathan is going
  
  16475   Thu Nov 18 14:29:01 2021 KojiSummaryBHDBHD invac optics / opto-mechanicsI   
  16490   Mon Dec 6 14:26:52 2021 KojiUpdateVACPumping down the RGA sectionJordan reported that the RGA section needs
to be pumped down to allow the analyzer to
run at sufficiently low pressure (P<1e-4
  
  16493   Tue Dec 7 13:12:50 2021 KojiUpdateVACPumping down the RGA sectionSo that Jordan can run the RGA scan this
afternoon, I ran TP3 and started pumping
down the RGA section.
  
  16501   Fri Dec 10 19:22:01 2021 KojiUpdateVACPumping down the RGA sectionThe scan result was ~x10 higher than the
previously reported scan on 2020/9/15 (https://nodus.ligo.caltech.edu:8081/40m/15570),
  
  16502   Fri Dec 10 21:35:15 2021 KojiSummarySUSVertex SUS DAC adapter ready4 units of Vertex SUS DAC adapter (https://dcc.ligo.org/LIGO-D2100035)
ready.

https://dcc.ligo.org/LIGO-S2101689
 PXL_20211211_053155009.jpgPXL_20211211_053209216.jpgPXL_20211211_050625141-1.jpg 
  16510   Wed Dec 15 17:44:18 2021 KojiSummaryBHDPart VIII of BHR upgrade - Placed LO1If ITMX already has another side magnet,
we can migrate the side OSEM of ITMX to the
other side. This way, the interference of
  
  16515   Thu Dec 16 15:54:08 2021 KojiUpdateElectronicsITMX feedthroughs and in-vac cables installedThanks for the installation.

With regard to the connector convention,
let's use the attached arrangement so
 PXL_20211216_235056582.jpg 
  16516   Thu Dec 16 17:41:12 2021 KojiUpdateBHDCoil driver test failed for S2100619-v1Good catch. It turned out that the both
+ and - side of the output stages for CH2
were oscillating at ~600kHz. If I use a capacitance
 6x 
  16519   Fri Dec 17 12:32:35 2021 KojiUpdateSUSRemaining task for 2021Anything else? Feel free to edit this entry.

- SUS: AS1 hanging

- SUS: PR3/SR2/LO2 3/4" thick
  
  16521   Fri Dec 17 19:16:45 2021 KojiUpdateBHDSOS assemblyWe @40m do the convention of the arrow
at the thinnest side & pointing the HR
side, but nobody says Lambda does the same.
  
  16522   Fri Dec 17 19:19:42 2021 KojiUpdateSUSRemaining task for 2021I had the fear that any mistake in the
electronics chain could have been the show
stopper.
 PXL_20211218_030145356.MP.jpg 
  16524   Sat Dec 18 00:56:14 2021 KojiUpdateBHDSOS assemblySad... We just need to check the wedge
direction everytime, unfortunately.

Pencil: can you try to gently wipe
  
  16526   Mon Dec 20 13:52:01 2021 KojiUpdateBHDSOS assemblyLO1: No need to remove
the pencil mark for the damping test. Until
we see serious contamination on the LO1 optic,
  
  16529   Tue Dec 21 16:35:39 2021 KojiUpdateVACITMX NW feedthru (LO1-1) connector pin bentI've received a report that a pin of
an ITMX NW feedthru connector was bent. (Attachment
1)
 PXL_20211222_002019620.jpgPXL_20211222_003014068.jpg 
  16532   Wed Dec 22 14:57:05 2021 KojiUpdateGeneralchiara local backupchiara
local backup of /cvs/cds has not been running
since the move of chiara in Nov 19.
  
  16534   Wed Dec 22 18:16:23 2021 KojiUpdateSUSRemaining task for 2021The in-vacuum installation team has reported
that the side OSEMs of ITMX and LO1 are going
to be interfering if place LO1 at the planned
 ITMX_2016_07_21.jpgScreen_Shot_2021-12-22_at_18.03.42.png 
  16535   Thu Dec 23 16:38:21 2021 KojiUpdateGeneralIs megatron down? (Re: chiara local backup)The local backup seems working fine again.
But I found that megatron
is down and this is a real issue. This should
  
  16536   Fri Dec 24 16:49:41 2021 KojiUpdateGeneralIs megatron down? (Re: chiara local backup)It turned out that the UPS installed on
Nov 22 failed (cf https://nodus.ligo.caltech.edu:8081/40m/16479
). As a fact, it was alive just for
 PXL_20211224_235652821.jpg 
  16538   Sun Jan 2 20:46:46 2022 KojiUpdateSUSEnd SUS Electronics building19:00~ Start working on the electronics
bench

The following units were tested
 PXL_20220103_081133119.jpg 
  16547   Thu Jan 6 13:54:28 2022 KojiUpdateCDSYearly DAQD fix 2022!Just
restarting all the c1sus2 models fixed the
issue. (Attachment 1)
 Screenshot_2022-01-06_13-57-40.png 