40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 118 of 344  Not logged in ELOG logo
    Reply  Thu Aug 12 18:30:08 2010, kiwamu, Update, CDS, Re: current status 
Yes.  
The medm screen C1SUS_GDS_TP.adl showed some numbers which correspond to that I wrote  on the outputs.
But I still could not get any physical voltage coming from the DACs.
Entry  Thu Aug 12 23:17:54 2010, Zach, Update, elog, restarted 
 script
    Reply  Thu Aug 12 23:41:48 2010, Jenne, Update, elog, restarted 


    
        
            Quote:
        
        
            
             script
Entry  Thu Aug 12 23:49:04 2010, nancy, Update, Environment, Laser chiller temp raised 
Since the laser is off, Jenne and I rasied the chiller-chiller (small AC in the Control Room) set point temperature to 73 degree F (from 68F) to save people from shivering.
Entry  Fri Aug 13 01:53:12 2010, Gopal, Update, Optic Stacks, Gravity Implementation Confirmed Pendulum_Length.pngPendulum_Length.pngPendulum_Length.png
Time Domain Analysis on a Driven, Damped Simple Pendulum has produced a method
for implementing gravity. 
    Reply  Fri Aug 13 13:11:30 2010, Dmass, Update, elog, restarted 


    
        
            Quote:
        
        
            
            
            
  
Entry  Fri Aug 13 18:32:48 2010, steve, Update, PEM, new legs attached to optical table P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG
Koji, Rana and Steve
 
The floor preparation continued today. The really messy part of drilling and jack-hammering the concrete were done in controlled manner.
Entry  Mon Aug 16 19:12:18 2010, Jenne, Update, SUS, More TT characterization 
[Jenne, Yoichi]
We characterized Tip Tilts numbers 2 & 3 today.  Recall #4 is the one which Koji
and I measured some time ago, and #s 1 & 5 have yet to be suspended (that's on the to-do list for tomorrow).
Entry  Mon Aug 16 23:13:25 2010, Zach, Update, elog, e to the log 
 Zach

    I get so many freebies it's ridiculous
    Reply  Mon Aug 16 23:39:29 2010, Yoichi, Update, SUS, More TT characterization EQStopScrewHoles.jpg


    
        
            Quote:
        
        
            
            Things we noticed:  Koji and I had been concerned the last time we were looking at TT#2 because the frequency
    Reply  Tue Aug 17 02:07:11 2010, Yoichi, Update, CDS, DACs have correct number of channels 


    
        
            Quote:
        
        
            
Entry  Tue Aug 17 09:06:08 2010, Alberto, Update, elog, elog was down 
I just restarted the elog after I found it down a few minutes ago.
Entry  Tue Aug 17 14:09:15 2010, steve, Update, PEM, PSL optical table schedule  
Tuesday, 17 August : fill tunnel, set table height, level table and balance load
Wednesday : grout tripod legs and leave it alone
Thursday : built  guide-form for concrete
Entry  Tue Aug 17 23:59:46 2010, Katharine, Update, elog, Maglev update repulsiveforce.pngOSEMcalibration.pngOSEMslopes.png
Katharine, Sharmila

Update:  
Entry  Wed Aug 18 11:40:59 2010, josephb,kiwamu,yoichi, Update, CDS, End station working with latest RCG code 
We were able to get the latest SVN checkout (revision 2009), working with the c1x00 (IOP) and c1vgl models at the new X end on the c1iscex machine.
We were unable to get it working yesterday, and as far as we can tell, the only significant change was a reboot of the c1sus machine.  Before
the reboot, it did not look like there were any conflicting models running on the c1sus machine, but apparently something was preventing the models on
Entry  Wed Aug 18 12:24:58 2010, josephb,kiwamu, Update, CDS, shmem issue 
Apparently its possible to have working models get into a bad state in regards to shared memory, which prevents the model from working after killing
it and restarting it.  We found that by shutting all the models down, and then killing and restarting the setup_shmem process, it allowed models to
function properly again.
    Reply  Wed Aug 18 16:42:14 2010, steve, Update, PEM, PSL optical table legs load balanced P1060671.JPGP1060674.JPGP1060670.JPGP1060676.JPG
 
 Rana, Koji, Alberto and Steve, Tuesday afternoon
 
Entry  Wed Aug 18 19:14:59 2010, Jenne, Update, elog, elog dead again 
The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions instead, with success.
Entry  Wed Aug 18 19:19:38 2010, Jenne, Update, SUS, Final 2 TTs suspended! 
[Jenne, Yoichi]
The final 2 Tip Tilts (#1 and #5) have been suspended.  We have designated #5 the spare.  It looks like there might be a teensy bit of
dust on the AR surface of the optic in #5, right near the edge of the coating.  Not a critical issue if this one is the spare, although we should
    Reply  Thu Aug 19 01:49:14 2010, Jenne, Update, elog, elog dead again 


    
        
            Quote:
        
        
            
            The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions
    Reply  Thu Aug 19 09:51:43 2010, josephb, Update, elog, elog dead again 
I found the elog dead again this morning, and the script didn't kill again.  I modified the script to use the following line instead of "pkill elogd":
kill `ps -ef | grep elogd | grep -v grep | grep -v start-elog-nodus | awk '{print $2}'`
Hopefully the script will be a bit more robust in the future.
Entry  Thu Aug 19 09:52:51 2010, Alastair, Update, Computers, Elog down 
 I restarted it using start-elog-nodus and this worked out fine - even though I did it from Pete's on my phone ;-)
Entry  Thu Aug 19 11:38:48 2010, Alastair, Update, Computers, ATF wiki 
The ATF wiki page doesn't seem to be working any more.  Does anyone know where this is held so we can try to get it back online?  Thanks 
    Reply  Thu Aug 19 12:06:07 2010, Alastair, Update, Computers, ATF wiki 


    
        
            Quote:
        
        
            
            The ATF wiki page doesn't seem to be working any more.  Does anyone know where this is held so we can try to get
Entry  Thu Aug 19 16:03:59 2010, steve, Update, PEM, grouting of PSL tripod legs P1060687.JPGP1060681.JPGP1060686.JPGP1060696.JPG
The 10' x 6' optical table is seating on 6 tripods. Each tripod leg has 3 feet. They are supported by jack screws against copper plates on the concrete
floor.                            These set screws allowed us to set the height, 
level and distribute the load of the table.
Entry  Thu Aug 19 21:56:02 2010, Zach, Update, elog, restarted 
 script
Entry  Fri Aug 20 13:09:53 2010, josephb, Update, elog, Rebooted elog 
I had to restart the elog again.
At this point, I'm going to try to get one of the GC guys to install gdb on nodus, and run the elog in the debugger, that way when it crashes the
next time, I have some error output I can send back to the developer and ask why its crashing there.
Entry  Fri Aug 20 15:22:09 2010, Jenne, Update, SUS, TTs done!!! 
[Yoichi, Jenne]
Hooray!!! The Tip Tilts are completely done! 
The only things remaining are (1) Install 4 TTs in chambers sometime in September and (2) do shake tests / take TFs of the spare.
Entry  Fri Aug 20 15:49:14 2010, steve, Update, PEM, grouting is done P1060699.JPGP1060700.JPGP1060704.JPG
The preparation for pouring concrete is continuing. The grout forms were removed. Half inch ribbed steel bars were epoxied into our 4" thick floor.
The concrete holding sides- forms are cut to size. They will be installed on Monday morning and pouring concrete should follow.
We can be planning for cleaning up on Tuesday
Entry  Fri Aug 20 16:17:35 2010, steve, Update, PEM, PEM-count channels are not working 
C1: PEM-count channels are dead since August 12, 2010
Entry  Fri Aug 20 16:41:43 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly Completed 7x
I finished assembling the frequency generation unit for the upgrade. I tested it through to check that the power levels are as expected at the various
connection (see attached png, showing in black the design power values, and in red the measured ones).
Because of some modifications made on the design along the construction, I have to recalculate the SNR along the lines.
Entry  Fri Aug 20 17:46:30 2010, rana, Update, PSL, 40m PSL Upgrade Layout v0.3 
http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL/LayoutUpgrade
P-pol = purple
S-pol = red
Entry  Fri Aug 20 20:36:05 2010, Alastair, Update, General, Elog 
 Elog was down, I restarted it.
Entry  Sun Aug 22 16:20:24 2010, Zach, Update, elog, restarted (with my phone this time) 
 
Entry  Mon Aug 23 00:08:24 2010, Jenne, Update, elog, Joe, I think this's your cue... 
 
Entry  Mon Aug 23 08:28:27 2010, steve, Update, SUS, ETMY sus damping restored 
 
    Reply  Mon Aug 23 19:55:31 2010, kiwamu, Update, CDS, some progress 
 {Joe, Kiwamu}
Today we did the following works in order to get ready for the new CDS
test.
Entry  Mon Aug 23 21:04:14 2010, Jenne, Update, Treasure, Seriously? BadKiwamu_CDSsetup.jpg
Bad CDS team. Bad.
    Reply  Mon Aug 23 22:11:52 2010, kiwamu, Update, Treasure, Re:Seriously? 
Woops, I am sorry about that. I've just cleaned them up.


    
        
            Quote:
        
        
            
Entry  Tue Aug 24 06:34:01 2010, Alastair, Update, General, Elog... 
...was down.  Have restarted it.
Entry  Tue Aug 24 11:23:32 2010, steve, Update, PEM, tripod leg installation completed 7x
Bertine Robby, Bertin and Jerry completed the installation by pouring concrete yesterday and cleaning up today.
Atm1-2, steel bars, grouted feet and side forms are ready
Atm3,    bounding agent is applied for better bounding
Entry  Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png
I used the free software called 'ABCD' for Mac to construct this mode matching solution for going from the PMC to the IMC.
After getting it close by eye, I plugged the initial guess into Matlab and let it optimize the distances. I then plugged this into 'ABCD'
to get the exact solution. ABCD doesn't actually optimize anything; it just makes a nice table and graphically plots the solution.
Entry  Tue Aug 24 14:29:18 2010, josephb, Update, elog, Elog down for 1 minute 
I'm going to take the elog down for one minute and restart it under gdb (using a copy of gdb stolen from fb40m since I couldn't figure out how to install
an old enough version on nodus from source).  The terminal with information is running on Rosalba under the "Phase Noise" panel, so please
don't close it.  Ideally, the next time the elog crashes, I'll have some output indicating why or at least the line in the code.  I can then
Entry  Tue Aug 24 17:57:57 2010, Zach, Update, elog, restarted 
 Restarted the elog using the script. I had to do it twice for it to work. This is not the first time this has happened---does anyone know why this
might be?
    Reply  Tue Aug 24 22:26:16 2010, Zach, Update, elog, restarted 
took two again


    
        
            Quote:
        
        
            
Entry  Wed Aug 25 12:18:47 2010, josephb, Update, elog, Trying new version of elog to see if it helps stability 
So unfortunately, I made the start-elog-nodus script smart enough to kill the debugging run I had (although thats probably good since there might have
been issues with continuing to run - just poor timing on part of the crash).
In related news, I have gotten the latest version of the elog code to actually compile on Nodus.  I had to hack the cryptic.c file (elog/src/cryptic.c)
Entry  Wed Aug 25 12:40:28 2010, josephb, Update, elog, Reverted back to 2.7.5 until further testing is done 
So apparently the themes/configurations didn't work so nicely on some of the logbooks with 2.8.0, so I'm reverting to 2.7.5 until I can figure out (assuming
I can) how to get them to display properly.
    Reply  Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png
In a manner similar to the now classic 'Mode Matching from PMC to  IMC' entry, I have calculated the lenses and positions needed to match  the 2W NPRO
beam into the PMC.
The added complication is that we also want to have a reasonable beam  size to get into the Faraday and the AOM. It seems that this should be 
    Reply  Wed Aug 25 15:42:01 2010, Jenne, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
Thoughts on where to take the pickoff for the SHG for the PSL-green?  We discussed today at the meeting the possibility of putting a 90/10 beam
splitter right after the PMC, so that the green team would get somewhere between 100-200mW. 


    
        
            
Entry  Wed Aug 25 15:55:33 2010, josephb, Update, elog, Staying with 2.7.5 until passwords sorted out 
Turns out the elog version 2.8.0 uses a different encryption method than 2.7.5.  This mean the encrypted passwords stored in the elogd.cfg don't
work with the new code.  elogd includes functionality to generate encrypted passwords, but unfortunately I don't know the administration passwords
for some of the logbooks.  So I'm going to leave 2.7.5 running until I can get those added properly to the 2.8.0 cfg file.
ELOG V3.1.3-