  3132   Tue Jun 29 10:20:58 2010 ranaUpdateMOPAMOPA is NOT deadNot dead. It just had a HT fault. You can
tell by reading the front panel. Cycling
the power usually fixes this.
  
  3134   Tue Jun 29 12:08:43 2010 josephbUpdateCDSDaily Downs UpdateI talked with Rolf, and asked if we were
using Megatron for IO.  The gist boiled
down to we (the 40m) needed to use it for
  
  3136   Tue Jun 29 14:19:44 2010 josephbUpdateCDSDaily Downs Update (Part 2)I picked up the ribbon cable connectors
from Jay.  It looks like we'll have
to make the new cables for connecting the
  
  3137   Tue Jun 29 16:44:12 2010 Jenne, ranaUpdateMOPAMOPA is NOT dead, was just asleep

    
        
  
  3138   Tue Jun 29 17:10:49 2010 steve, ranaUpdateVACslow pumpdown startedThe folding crane was fixed and tested
this morning by the NNN rigging company.
Pictures will be posted by Steve in the morning.
  
  3139   Tue Jun 29 20:47:19 2010 JenneUpdatePEMTerminator put on Guralp BoxA little D-sub terminator was put on the
Gur1 input to the Guralp box, to check again
the noise level of the box.
  
  3140   Tue Jun 29 23:49:18 2010 steve, ranaUpdateVACslow pumpdown started   Untitled.png 
  3141   Wed Jun 30 00:45:26 2010 ranaUpdateVACslow pumpdown stopped for the nightAs per Steve's instructions, at 12:43 AM,
I used the following steps to stop the pumpdown
until the morning:
  
  3142   Wed Jun 30 11:35:06 2010 Gopal UpdateGeneral6.23.10 - 6.30.10 Weekly UpdateSummary of this Week's Activities:
6/23: LIGO Safety Tour; Simulink
Controls Tutorial
  
  3143   Wed Jun 30 11:39:20 2010 nancyUpdateWIKI-40M UpdateWeekly UpdateWednesday Morning E-log :
 
Most of the time through this week,
  
  3144   Wed Jun 30 12:01:20 2010 josephbUpdateCDSSUS IO ChassisI spent this morning populating the SUS
IO Chassis and getting it ready for installation
into the 1Y4 rack.  I discovered I'm
  
  3145   Wed Jun 30 12:13:39 2010 Sharmila, KatharineUpdateWIKI-40M Updateweekly updateWeekly Project Update:

We are studying Haixing's circuit
  
  3146   Wed Jun 30 12:20:49 2010 RazibUpdatePhase CameraWeekly updateThis week I have completed following tasks:
1. Worked out the analytical expressions
for the amount of power of the DC and oscillatory
  
  3147   Wed Jun 30 14:38:04 2010 JenneUpdatePEMGuralp terminator is switchedI moved the Guralp box's input terminator
from Gur1 to Gur2 a minute or so ago to check
the other channels.
  
  3148   Wed Jun 30 15:24:04 2010 steve,kiwamuUpdateVACslow pumpdown copmlete


   
        
            
 slowpd.jpgbutterfly.JPG 
  3149   Wed Jun 30 17:30:54 2010 JenneUpdatePEMSeismometers moved for MC Wiener workNow that the MC is back up and running,
I put the Guralp seismometers at the ends
of the mode cleaner.  Gur1 is near MC2,
  
  3150   Wed Jun 30 18:16:55 2010 steveUpdateSAFETYSURF safety training 201040m SURFs Razib Obaid, Nancy Aggarwal,
Unknown Bearded SMURF, Megan
 DSC_1902.JPG 
  3153   Thu Jul 1 14:03:40 2010 josephbUpdatePEMTemporary disconnect of some PEM channels for ~20 minutesIn order to identify the output adapter
of the BNC patch panel used for about 20
PEM channels, I had to disconnect its power
  
  3154   Thu Jul 1 14:28:39 2010 JenneUpdatePEMMC1 Accelerometers in placeKevin sent me an email with top secret
info on where one of the other accelerometer
cubes was hiding (it was with his shaker
  
  3155   Thu Jul 1 17:05:36 2010 josephb, kiwamu, steveUpdateCDSNew SUS Chassis in rackThanks to Steve's work on some L brackets,
and Kiwamu's lifting help, we now have a
new SUS IO chassis in the new 1X4 rack (formerly
  
  3156   Fri Jul 2 11:06:38 2010 josephb, kiwamuUpdateCDSCDS and Green locking thoughtsKiwamu and I went through and looked at
the spare channels available near the PSL
table and at the ends.
  
  3157   Fri Jul 2 11:33:15 2010 josephbUpdateCDSc1sus needs real time linux to be setup on itI connected a monitor and keyboard to the
new c1sus machine and discovered its not
running RTL linux.  I changed the root
  
  3158   Tue Jul 6 11:57:06 2010 josephbUpdateCDSDaily Downs UpdateI went to talk to Rolf and Jay this morning. 
I asked Rolf if a chassis was available,
so he went over and disconnected one of his
  
  3159   Tue Jul 6 17:05:30 2010 Megan and JoeUpdateComputersc1iovme rebootWe rebooted c1iovme because the lines stopped
responding to inputs on C1:I00-MC_DRUM1.
This fixed the problem.
  
  3160   Tue Jul 6 17:07:56 2010 josephbUpdateCDSc1sus statusI talked to Alex, and he explained the
steps necessary to get the real time linux
kernel installed.  It basically went
  
  3161   Tue Jul 6 17:29:04 2010 ChipUpdatePEMThe Ranger is mine!    
  3162   Tue Jul 6 17:38:27 2010 JenneUpdateSUSTip Tilt Progress![Jenne, Kyung Ha]
We successfully suspended the 4 eddy
current dampers for the first Tip Tilt. 
  
  3165   Wed Jul 7 11:23:08 2010 Sharmila, KatharineUpdateWIKI-40M Update Weekly Update:
Last Weds-Thurs, we wrote and edited
our progress reports.
  
  3166   Wed Jul 7 11:35:59 2010 GopalUpdateWIKI-40M Update6.30.10 - 7.7.10 Weekly Update Summary of this Week's Activities:
6/30: 2nd and 3rd drafts of Progress
Report
  
  3167   Wed Jul 7 12:17:36 2010 RazibUpdatePhase CameraWeekly updateI have completed the following tasks:
1. Find a simplified calibration
of the exposure time for the current He-Ne
 DC_1Hz_beat_sig.jpgDC_1Hz_beat_sig.jpgDC_5Hz_beat_sig.jpg 
  3168   Wed Jul 7 12:45:00 2010 nancyUpdate Weekly UpdateWednesday after the meeting - Started report,
learnt mode cleaner locking from Kiwamu and
Rana, saw how to move optics on the tables
  
  3169   Wed Jul 7 17:05:30 2010 steve, ranaUpdateSAFETYSummary of Crane Damage/MalfunctionThe 1 Ton yellow crane support beam
jammed up at Friday morning, June 25.
 
 10x 
  3171   Wed Jul 7 19:41:27 2010 JenneUpdateSUS1.5 more ECD sets suspended for tip tilts[Jenne, Kyung Ha]
We made some good progress on suspending
the Tip Tilt ECDs today.  We finished
 ECDbackplane_blackdump_small.jpgECDbackplane_foil_small.jpg 
  3172   Wed Jul 7 22:22:49 2010 JenneUpdateComputersSome channels not being recorded!!![Rana, Jenne]
We discovered
  
  3174   Wed Jul 7 22:58:08 2010 nancyUpdateIOOMC alignment values.Nancy and Koji:
This is what I and Koji measured
after aligning the MC in the afternoon.
  
  3175   Wed Jul 7 23:11:08 2010 KojiUpdateIOOMC alignment values.Hmm. I expect that you will put more details
of the work tomorrow.
i.e. motivation, method, result (the
  
  3176   Thu Jul 8 14:11:16 2010 josephbUpdateComputersSome channels not being recorded!!!This has been fixed,
thanks to some help from Alex.  It doesn't
  
  3177   Thu Jul 8 14:32:42 2010 josephbUpdateCDSDaily Downs UpdateAfter talking with Rolf, and clarifying
exactly which machine I wanted, he gave me
an 4600 Sun machine (similar to our current
  
  3179   Thu Jul 8 15:43:58 2010 ranaUpdateComputersSome channels not being recorded!!!

    
        
 3-monkeys-ComicPosition.gif 
  3180   Thu Jul 8 16:24:30 2010 GopalUpdateOptic StacksCompletion of single stack layerSingle layer of stack successfully modeled
in COMSOL. I'm working on trying to add Viton
springs now and extend it to a full stack.
  
  3181   Thu Jul 8 17:29:20 2010 Katharine, SharmilaUpdateelog 


 6x 
  3182   Thu Jul 8 19:43:16 2010 nancyUpdateIOOWFS calculationsThe WFS error signals were recorded in
the order 
WFS1_PIT
  
  3183   Thu Jul 8 20:32:22 2010 nancyUpdateIOOMC alignment values.I and Koji were trying to lock the mode
cleaner for measuring the  beam power at
MC2 end. That is when we obtained the trans
  
  3184   Thu Jul 8 21:44:43 2010 nancyUpdateIOOWFS calculations 
I just found the singular values
and the condition number of the 4*4 matrix
  
  3185   Fri Jul 9 11:09:14 2010 josephbUpdateComputersFb40m and a few other machines turned off briefly just before 11amI turned off fb40m2 and fb40m temporarily
while we added an extra power strip 
to the (new) 1X6 rack at the bottom in the
  
  3187   Fri Jul 9 12:07:26 2010 RazibUpdatePhase CameraWeekly updateHere are some more details about the current
phasecam setup. We are using a He-Ne laser
setup
 phase_cam_setup_09_08_10.jpgmod_setup_(copy)_annotated.jpg 
  3188   Fri Jul 9 12:25:25 2010 kiwamuUpdateGreen LockingSHG on PSL tableIn order
to increase the green power on the PSL table,
 PSL_doubling.png 
  3192   Mon Jul 12 10:23:51 2010 steveUpdatePEMair condition maintenance is todayThe AC filters will be checked and/or replaced
today. This means the AC will be off for
sort periods of time. Temperature and particle
 pem2y.jpg 
  3195   Mon Jul 12 13:16:53 2010 kiwamuUpdateGreen LockingPZT feedback at X endThe
feedback signal going to the laser PZT at
the X end station was measured in 
 arm_day_night.png 
  3197   Mon Jul 12 15:49:56 2010 nancyUpdateSUSCharacterisation of the QPDI and koji setup the measurement of the
QPD response to the pitch and yaw displacements
of the beam spot.
 fullyaw.jpgyaw_linear.jpgfullpitch.jpgpitch_linear.jpg 