  3092   Sun Jun 20 18:28:25 2010 kiwamuUpdateGreen LockingRe: lock with PDH boxOn the wiki I summarized about the modification
of the PDH box which is currently running
on the end PDH locking. 
  
  3093   Mon Jun 21 14:21:34 2010 Jenne, KiwamuUpdatePhotosInspection of Magnets for the TTs    
  3094   Mon Jun 21 18:01:34 2010 JenneUpdate40m UpgradingSRM, PRM hung, magnets inspected[Jenne, Kiwamu, Rana, Eric Gustafson]
The SRM and PRM have been re-hung,
and are ready for installation into the chambers. 
  
  3095   Mon Jun 21 20:11:21 2010 KojiUpdatePhotosInspection of Magnets for the TTsWere these magnets chipped before the Ni
plating?
  
  3096   Tue Jun 22 09:45:21 2010 Aidan, Joe, RazibUpdatePhase CameraCurrent phase camera setup. Seeing Acoustic beat We've set up a preliminary test bed
for the phase camera. It simply uses a HeNe
that is split into two beams. One is frequency
 2010-06-22_Phase_camera_layout_version_1.pdf 
  3097   Tue Jun 22 13:38:13 2010 KojiUpdatePhase CameraCurrent phase camera setup. Seeing Acoustic beat1. In terms of the AOM:

How much beam power is  incident
  
  3098   Tue Jun 22 18:56:32 2010 JenneUpdateEnvironmentBad placement of recycling binSomeone has been moving the big blue recycling
bin in front of the laser-chiller-chiller
(the air conditioner in the control room). 
 BlockingLaserChillerChiller_small.jpg 
  3099   Tue Jun 22 20:07:08 2010 JenneUpdate40m UpgradingFirst attempt at Tip Tilt hanging[Jenne, Steve, Nancy, Gopal]
We
made an attempt at hanging some of the Tip
 2_ECDs_small.jpgMagnetStickingOutFar_small.jpg 
  3100   Wed Jun 23 11:25:14 2010 Katharine and SharmilaUpdateWIKI-40M UpdateMaglevWeekly update

Lab work
  
  3101   Wed Jun 23 11:31:12 2010 nancyUpdateWIKI-40M UpdateWeekly UpdateThis week I attended a whole lot of orientations,
lectures, and meetings related to SURF. Done
with general and laser safety training.
  
  3103   Wed Jun 23 12:31:36 2010 GopalUpdateGeneral6.16.10-6.23.10 Weekly UpdateSummary of This Week's Activities:
6/16: LIGO Orientation; First Weekly
Meeting; 40m tour with Jenne; Removed WFS
  
  3104   Wed Jun 23 12:47:43 2010 JenneUpdateSUSPRM, SRM ready for vacuumI fitzed
with the PRM and SRM briefly, and I now believe
 SRM_pitch_offset_small.jpg 
  3105   Wed Jun 23 12:52:35 2010 kiwamuUpdatePhotosBS chamber before cleaning up    
  3107   Wed Jun 23 15:33:42 2010 josephbUpdateCDSDaily Downs UpdateI visited downs and announced that I would
be showing up again until all the 40m hardware
is delivered. 
  
  3108   Wed Jun 23 17:48:16 2010 steveUpdateMOPAlaser head tempThe laser chiller temp is fluctuating and
the power output is decreasing. See 120 days
plot.
 htemp120d.jpg 
  3111   Wed Jun 23 23:55:03 2010 Katharine, Sharmila, Rana, Steve and KiwamuUpdateVACwiped the BSSome unused
optics in the BS chamber were removed. 
  
  3112   Thu Jun 24 01:02:34 2010 Sharmilla, Rana and KiwamuUpdateGreen Lockinga channel for PPKTP temperatureWe added
a channel on c1psl in order to monitor the
  
  3113   Thu Jun 24 06:49:29 2010 AidanUpdateGreen Lockinga channel for PPKTP temperatureIs this a setpoint temperature that we
can change by writing to the channel or is
it a readout of the actual temperature of
  
  3115   Thu Jun 24 13:02:59 2010 JenneUpdateComputersSome lunchtime reboots[Jenne, Megan, Frank]
We rebooted c1iovme, c1susvme1, and
c1susvme2 during lunch.  Frank is going
  
  3116   Thu Jun 24 16:59:24 2010 josephbUpdateVACFinished restoring the access connector and door[Jenne,  Kiwamu, Steve, Sharmila,
Katherine, Joe]
We finished bolting the door on the
  
  3119   Fri Jun 25 08:10:23 2010 josephbUpdateCDSDaily Downs UpdateYesterday afternoon I went to downs and
acquired the following materials:
2 100 ft long blue fibers, for use
  
  3120   Fri Jun 25 12:09:27 2010 kiwamuUpdateComputersGPIB controller of HP8591EI've
just stolen a GPIB controller, an yellow
small box, from the spectrum analyzer HP8591E.
  
  3122   Fri Jun 25 20:32:30 2010 kiwamuUpdateGreen Lockinggreen power on the PSL tableThe power
of the green beam generated on the PSL table
 optical_power.png 
  3124   Sat Jun 26 20:16:44 2010 josephbUpdateCDSNew checkout of RCG from SVN and changes madeORPHAN ENTRY FOUND ON ROSALBA:::::::::::::::::::::::::::::::::::::::::::::::::::>>>>>>>>>>>>>>>>>>>>>>>>>>>>>   
  3126   Mon Jun 28 11:27:08 2010 MeganUpdateElectronicsMarconi Phase NoiseUsing the three Marconis in 40m at 11.1
MHz, the Three Cornered Hat technique was
used to find the individual noise of each
 IndividualNoise11100kHzAllRanges.jpgIndividualNoise11100kHzSeparate.jpgDirectvsIndirectNoise.jpgFG12Noise.jpg 
  3128   Mon Jun 28 13:40:53 2010 josephb, AlexUpdateCDSChanges added to CDS SVN, new checkout, new features, some changes madeLast week Alex merged in the changes I
had made to the local 40m copy of the Real
Time Code Generator.  These were to
  
  3130   Tue Jun 29 08:41:06 2010 steveUpdateMOPAMOPA is deadI found the laser dead this morning.
The crane people are here to unjam
it.
 laserisdead.jpg 
  3132   Tue Jun 29 10:20:58 2010 ranaUpdateMOPAMOPA is NOT deadNot dead. It just had a HT fault. You can
tell by reading the front panel. Cycling
the power usually fixes this.
  
  3134   Tue Jun 29 12:08:43 2010 josephbUpdateCDSDaily Downs UpdateI talked with Rolf, and asked if we were
using Megatron for IO.  The gist boiled
down to we (the 40m) needed to use it for
  
  3136   Tue Jun 29 14:19:44 2010 josephbUpdateCDSDaily Downs Update (Part 2)I picked up the ribbon cable connectors
from Jay.  It looks like we'll have
to make the new cables for connecting the
  
  3137   Tue Jun 29 16:44:12 2010 Jenne, ranaUpdateMOPAMOPA is NOT dead, was just asleep

    
        
  
  3138   Tue Jun 29 17:10:49 2010 steve, ranaUpdateVACslow pumpdown startedThe folding crane was fixed and tested
this morning by the NNN rigging company.
Pictures will be posted by Steve in the morning.
  
  3139   Tue Jun 29 20:47:19 2010 JenneUpdatePEMTerminator put on Guralp BoxA little D-sub terminator was put on the
Gur1 input to the Guralp box, to check again
the noise level of the box.
  
  3140   Tue Jun 29 23:49:18 2010 steve, ranaUpdateVACslow pumpdown started   Untitled.png 
  3141   Wed Jun 30 00:45:26 2010 ranaUpdateVACslow pumpdown stopped for the nightAs per Steve's instructions, at 12:43 AM,
I used the following steps to stop the pumpdown
until the morning:
  
  3142   Wed Jun 30 11:35:06 2010 Gopal UpdateGeneral6.23.10 - 6.30.10 Weekly UpdateSummary of this Week's Activities:
6/23: LIGO Safety Tour; Simulink
Controls Tutorial
  
  3143   Wed Jun 30 11:39:20 2010 nancyUpdateWIKI-40M UpdateWeekly UpdateWednesday Morning E-log :
 
Most of the time through this week,
  
  3144   Wed Jun 30 12:01:20 2010 josephbUpdateCDSSUS IO ChassisI spent this morning populating the SUS
IO Chassis and getting it ready for installation
into the 1Y4 rack.  I discovered I'm
  
  3145   Wed Jun 30 12:13:39 2010 Sharmila, KatharineUpdateWIKI-40M Updateweekly updateWeekly Project Update:

We are studying Haixing's circuit
  
  3146   Wed Jun 30 12:20:49 2010 RazibUpdatePhase CameraWeekly updateThis week I have completed following tasks:
1. Worked out the analytical expressions
for the amount of power of the DC and oscillatory
  
  3147   Wed Jun 30 14:38:04 2010 JenneUpdatePEMGuralp terminator is switchedI moved the Guralp box's input terminator
from Gur1 to Gur2 a minute or so ago to check
the other channels.
  
  3148   Wed Jun 30 15:24:04 2010 steve,kiwamuUpdateVACslow pumpdown copmlete


   
        
            
 slowpd.jpgbutterfly.JPG 
  3149   Wed Jun 30 17:30:54 2010 JenneUpdatePEMSeismometers moved for MC Wiener workNow that the MC is back up and running,
I put the Guralp seismometers at the ends
of the mode cleaner.  Gur1 is near MC2,
  
  3150   Wed Jun 30 18:16:55 2010 steveUpdateSAFETYSURF safety training 201040m SURFs Razib Obaid, Nancy Aggarwal,
Unknown Bearded SMURF, Megan
 DSC_1902.JPG 
  3153   Thu Jul 1 14:03:40 2010 josephbUpdatePEMTemporary disconnect of some PEM channels for ~20 minutesIn order to identify the output adapter
of the BNC patch panel used for about 20
PEM channels, I had to disconnect its power
  
  3154   Thu Jul 1 14:28:39 2010 JenneUpdatePEMMC1 Accelerometers in placeKevin sent me an email with top secret
info on where one of the other accelerometer
cubes was hiding (it was with his shaker
  
  3155   Thu Jul 1 17:05:36 2010 josephb, kiwamu, steveUpdateCDSNew SUS Chassis in rackThanks to Steve's work on some L brackets,
and Kiwamu's lifting help, we now have a
new SUS IO chassis in the new 1X4 rack (formerly
  
  3156   Fri Jul 2 11:06:38 2010 josephb, kiwamuUpdateCDSCDS and Green locking thoughtsKiwamu and I went through and looked at
the spare channels available near the PSL
table and at the ends.
  
  3157   Fri Jul 2 11:33:15 2010 josephbUpdateCDSc1sus needs real time linux to be setup on itI connected a monitor and keyboard to the
new c1sus machine and discovered its not
running RTL linux.  I changed the root
  
  3158   Tue Jul 6 11:57:06 2010 josephbUpdateCDSDaily Downs UpdateI went to talk to Rolf and Jay this morning. 
I asked Rolf if a chassis was available,
so he went over and disconnected one of his
  