40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 10 of 350  Not logged in ELOG logo
Entry  Thu Sep 24 19:35:20 2009, rana, HowTo, Photos, 40m Google account 
    Reply  Fri Jun 29 13:11:31 2012, steve, Update, VAC, 40m IFO at atm vent06292012.png40m@ATM.png
    Reply  Thu Jan 23 13:23:10 2014, Steve, Update, VAC, 40m IFO is at atmosphere 
Entry  Tue Jul 21 21:25:18 2015, Max Isi, Update, General, 40m LDAS account 
    Reply  Sat Apr 10 11:56:14 2021, Jon, Update, CDS, 40m LSC simPlant model x1lsp_main.png
    Reply  Tue Apr 13 16:24:38 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model 
    Reply  Mon Apr 19 13:15:20 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model 
    Reply  Wed Apr 21 10:03:01 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model Overview.png
    Reply  Wed Apr 21 11:01:37 2021, Rana, Update, CDS, 40m LSC simPlant model 
    Reply  Fri Apr 23 15:52:19 2021, Ian MacMillan, Update, CDS, 40m LSC simPlant model Plant_framework.pdfSimple_Plant.pdfControls.pdf
Entry  Wed Apr 11 16:33:16 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items 
Entry  Thu May 3 13:35:56 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items 
Entry  Wed May 9 15:50:13 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items 
Entry  Wed May 23 13:57:11 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items 
    Reply  Wed May 23 20:41:37 2012, Suresh, Bureaucracy, General, 40m Meeting Action Items: Tip-tilts : cabling and electronics  
Entry  Fri Jun 28 16:19:06 2013, Charles, Update, ISS, 40m Noise Budget - Seismic Contribution seismic_noise_6-28-13_raw.pngseismic_noise_6-28-13_raw.figseismic_noise_6-28-13_meters.pngseismic_noise_6-28-13_meters.fig
    Reply  Wed Dec 19 00:12:46 2018, gautam, Update, OMC, 40m OMC DCC node 
Entry  Fri Aug 20 17:46:30 2010, rana, Update, PSL, 40m PSL Upgrade Layout v0.3 
Entry  Sat May 9 17:01:08 2020, Yehonathan, Update, Loss Measurement, 40m Phase maps loss estimation ITMX_Loss_Map.pdfETMX_Loss_Map.pdfITMX_Phase_Map_(nm).pdfETMX_Phase_Map_(nm).pdf
    Reply  Wed May 13 15:13:11 2020, Yehonathan, Update, Loss Measurement, 40m Phase maps loss estimation ITMX_Loss_Map.pdfETMX_Loss_Map.pdf
    Reply  Thu May 14 12:21:56 2020, Yehonathan, Update, Loss Measurement, 40m Phase maps loss estimation ITMX_Loss_Map_Perturbation_Theory.pdfETMX_Loss_Map_Perturbation_Theory(1).pdf
    Reply  Thu May 14 19:00:43 2020, Yehonathan, Update, Loss Measurement, 40m Phase maps loss estimation 
    Reply  Tue May 19 15:39:04 2020, Yehonathan, Update, Loss Measurement, 40m Phase maps loss estimation Mode_power_fraction1.pdf
Entry  Fri Jul 13 15:49:38 2012, yuta, Bureaucracy, General, 40m Priority Action Items 
Entry  Wed Jan 25 15:04:41 2012, Jenne, Bureaucracy, SAFETY, 40m SOS supplies moved off of cleanroom flow bench 
Entry  Tue Jun 28 16:09:41 2016, Praful, Update, General, 40m Summary Pages 
Entry  Fri Oct 2 17:00:06 2009, Alberto, Update, General, 40m Update - Requirements on the 5x Frequency Multiplier DesignOfTheMultiplier1-14-15.pdf
Entry  Sat Jun 12 19:41:04 2010, Alberto, Update, Locking, 40m Upgrade Optickle Model optickleIFOworkingpoint.pdf
    Reply  Sun Jun 13 08:28:44 2010, valera, Update, Locking, 40m Upgrade Optickle Model 
    Reply  Mon Jun 14 07:57:07 2010, alberto, Update, Locking, 40m Upgrade Optickle Model 
    Reply  Tue Jun 15 21:28:44 2010, alberto, Update, Locking, 40m Upgrade Optickle Model allTransferFunctions_DARMoff_0.pdfallTransferFunctions_DARM2AS_10pmDARMoffset.pdfJan_DARM2AS.pdf
Entry  Thu May 31 17:47:25 2012, Suresh, Omnistructure, General, 40m Wireless Network 40m_Wifi.png
    Reply  Fri Jun 1 10:00:03 2012, steve, Omnistructure, General, 40m Wireless Network 
Entry  Fri Dec 30 12:53:47 2022, Koji, Update, General, 40m avoided the power outage 
Entry  Wed Jun 23 15:15:53 2010, josephb, Summary, Computers, 40m computer security issue from last night and this morning 
Entry  Fri Nov 5 15:20:18 2010, josephb, alex, Summary, CDS, 40m computer slow down solved 
    Reply  Fri Nov 5 21:49:12 2010, rana, Summary, CDS, 40m computer slow down solved 
    Reply  Sat Nov 6 16:13:14 2010, rana, Summary, CDS, 40m computer slow down solved 
    Reply  Mon Aug 28 16:20:00 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Mon Aug 28 17:13:57 2017, ericq, Update, CDS, 40m files backup situation 
    Reply  Tue Sep 26 15:55:20 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Thu Sep 28 10:33:46 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Thu Sep 28 11:13:32 2017, jamie, Update, CDS, 40m files backup situation 
    Reply  Thu Sep 28 23:47:38 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Fri Sep 29 11:07:16 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Thu Oct 5 13:58:26 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Fri Oct 6 12:46:17 2017, gautam, Update, CDS, 40m files backup situation 
    Reply  Sat Oct 28 00:36:26 2017, gautam, Update, CDS, 40m files backup situation - ddrescue 415E2F09-3962-432C-B901-DBCB5CE1F6B6.jpegBFF8F8B5-1836-4188-BDF1-DDC0F5B45B41.jpeg
Entry  Mon Nov 23 17:53:08 2009, Jenne, Update, Computers, 40m frame builder backup acting funny 
    Reply  Tue Nov 24 16:06:45 2009, Jenne, Update, Computers, 40m frame builder backup acting funny 
ELOG V3.1.3-