40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 10 of 171  Not logged in ELOG logo
Entry  Fri Jun 13 11:17:25 2008, Yoichi, Update, PSL, PMC transmittance at high power 
We received a new cable for the Scientech calorimeter. So I measured the transmittance of the PMC at higher power.

Summary:
Entry  Mon Jun 16 18:26:01 2008, Max Jones, Update, Computer Scripts / Programs, Noise Budget Changes 
In the directory cvs/cds/caltech/NB the following changes were made:

I created temporary files in ReferenceData for the C1 by copying and renaming the corresponding H1 files. 
Entry  Tue Jun 17 22:00:53 2008, John, HowTo, PSL, Problems turning MZ servo on/off 
We were unable to toggle the MZ servo on/off (Blank/Normal) from MEDM. Pushing on the Xycom board and cables changed the fault from constant to intermittent.
At least one lock loss has been caused by a MZ glitch.
Entry  Wed Jun 18 00:19:29 2008, rob, Update, PSL, MOPA trend MOPAtrend.png
15 day trend of MOPA channels.  The NPRO temperature fluctations are real, and causing the PMC to consistently run up against its rails.  The cause of the
temperature fluctations is unknown.  This, combined with the MZ glitches and Miller kicking off DC power supplies is making locking rather tetchy tonight.
 Hopefully Yoichi will find the problem with the laser and fix it by tomorrow night.
Entry  Wed Jun 18 16:07:57 2008, rob, Summary, Computers, RFM network down 

The RFM network tripped off around noon today.  It's still down.  The problem appears to be with the EPICS interface (c1dcuepics).  Trying to restart one
of the end stations yields the error: No response from EPICS.  
Entry  Wed Jun 18 16:37:54 2008, steve,rana, Update, SAFETY, CO2 test in the east arm co2.png
The CO2 laser and table are in the east arm for characterization of the mechanics. We
will not be operating it until we have an SOP (which is being written). No worries.
Entry  Wed Jun 18 18:20:10 2008, Yoichi, Update, PSL, Investigation on the NPRO temperature stabilization glitches LTEC-loop-HeatGun-Response.pdfLTMP-glitches.pdf
As Rob pointed out in http://dziban.ligo.caltech.edu:40/40m/537 the MOPA NPRO has been showing some glitchiness in the LTEC loop.
Following Rana's suggestion, Steve and I opened the MOPA and directed a heat gun for a minute to the NPRO hoping that we can see something in the LTEC
loop.
Entry  Wed Jun 18 18:26:19 2008, Yoichi, Update, PSL, Finding the optimal operation temperature for the NPRO by the slow act scan FSS-slow-scan.pdf
Being suspicious of the temperature stabilization of the NPRO crystal, I ran the slow scan script written by Rana to find the suitable operation temperature.
The procedure is the same as the one explained in the entry below:
http://www.ldas-sw.ligo.caltech.edu/ilog/pub/ilog.cgi?group=40m&task=view&date_to_view=09/04/2006&anchor_to_scroll_to=2006:09:04:22:23:56-rana
Entry  Wed Jun 18 18:32:09 2008, Max Jones, Update, Computer Scripts / Programs, NB Update 
I am reconfiguring the the noisebudget code currently in use at the sights. To that end, I have done the following things (in addition to the elog I posted
earlier)
Entry  Wed Jun 18 18:50:09 2008, rana, Update, Computers, It can only be attributable to human error. (HAL - 2001) 
[B]There has been another one of "those" events and all of the front end machines are down.[/B]

[COLOR=darkblue]We poked around and Rob determined that the FEs can't get the EPICS data from EPICS. The
Entry  Thu Jun 19 15:52:06 2008, Alberto, Configuration, Computers, Measure of the current absorbed by the new Megatron Computer 
Together with Rich Abbot, sam Abbot and I measured the current absorbed by the new Megatron computer that we installed yesterday in the 1Y3 rack. The computer
alone absorbs 8.1A at the startup and then goes down to 5.9A at regime. The rest of the rack took 5.2A without the computer so the all rack needs 13.3
at the startup and the 11.1A.
Entry  Thu Jun 19 20:22:03 2008, rana, Update, General, FE Computer Status 
I called Rolf (@LLO) who called Alex (@MIT) who suggested that we power cycle every crate 
with an RFM connection as we did before (twice in the past year).
Entry  Fri Jun 20 01:38:55 2008, rana, Update, PEM, 20 day Weather test.png
Yoichi showed me that its possible to make PNG images from PS using GS:

[CODE]gs -sDEVICE=png16m -sOutputFile=foo.png bar.ps[/CODE]
Entry  Fri Jun 20 02:20:33 2008, Yoichi, Update, , PMC transmittance degradation pmc_trans_long_trend.pdfpmc_trans_improvement.pdf
The PMC transmitted light power has been degrading constantly for last two weeks (see the attachment 1).
I went down to 2.55V.
The output of the MOPA is constant during this period. More strangely, the reflected power from the PMC is also constant.
Entry  Fri Jun 20 08:30:27 2008, stiv, Update, Photos, 40m summer line up 2008 P1020559.pngP1020560.png
atm1: John, Alberto, Yoichi, Koji, Masha, and Sharon 

atm2: surf students Max of CIT, Sharon of MIT, Masha of Harvard, Eric of CIT not shown
Entry  Fri Jun 20 17:42:48 2008, steve, Update, PSL, SS trap scattering compared to black glass trap cSSt_1.pngcSSt_2.pngscatset_61908.pngcSSt&wBGt.pngcSStbeam.png
Circular SS304 trap was compared to wedged black glass trap.

The measurement  set up of entry 529 was changed to define polarization.
Entry  Sun Jun 22 21:38:49 2008, rob, HowTo, General, IFO CONFIGURE 

Now that we're getting back into locking, it's nice to have a stable alignment of the interferometer.  
Thus, [B][COLOR=darkblue]after you're done with your experiment using subsets of the interferometer[/COLOR][/B] (such as a single arm),
Entry  Mon Jun 23 15:22:04 2008, rana, Bureaucracy, SAFETY, Laser Safety Walkthrough today Walkthrough08.jpg
 
Entry  Mon Jun 23 19:33:01 2008, rana, jenne, Update, IOO, MC_F Noise check mcf.png
We looked at the MC_F spectrum because Rob and Yoichi said that it had gone 'all crazy'. It
seemed fine as we looked at it (even with only one boost stage on) so we looked for things
that might be marginal and make it go nuts.
Entry  Mon Jun 23 19:48:28 2008, rana,alberto, Summary, IOO, StochMon trends (80 days) e.png
Here's a StochMon plot showing the RFAM after the MC. Remember that in these units, 2V means no RFAM
and 0 V means lots of RFAM. Alberto says "the calibration is in Tiramisu". So there you go.
Entry  Mon Jun 23 21:51:19 2008, Alberto, Update, General, Arm Cavity Length Measurement 40mLengthMeasure.pdf
We measured the arm cavity lengths sweeping the ETM mirror position and looking at the reflected demodulated output. We excited the mirror by a sine wave
of 0.2 Hz and amplitude of 30000 counts. From the time series of the occurrences of the resonances of the sidebands and of the carrier we evaluated the
free spectral range of the cavities and thus the lengths. The details of the procedure are explained in the attached document. As discussed in it, for
Entry  Tue Jun 24 10:24:43 2008, Koji, Update, General, Abs. Len. Meas. ~ Cavity Swing Measurement (2) armlength.pngarmlength2.png
At the entry 555, Alberto reported the results of the cavity length measurement using cavity sweeping.
As expected, each result inevitably has an ambiguity depending on which resonance do we take as an upper sideband.
Entry  Tue Jun 24 15:15:09 2008, John, Summary, LSC, Locking efforts mcl080623.png
Rob, Rana, John

In the past week or so we've been working on reducing the CARM offset using a DC signal (SPOB DC).
Entry  Tue Jun 24 17:12:10 2008, josephb, Eric, Configuration, Cameras, GC750 setup, 1X4 Hub connected, ETMX images GC750_ETMX_E30000_single.pdfGC750_ETMX_E30000_avg.pdfGC750_ETMX_E30000_std.pdf
The GC750 camera has been setup to look at ETMX.  In addition, the new 1X4 rack mounted switch (131.215.113.200) has been connected via new cat6 cable to
the control room hub (131.215.113.1?), thanks to Eric.  The camera is now plugged into 1X4 rack switch and now has a gigabit connection to the control
room computers as well as Mafalda (131.215.113.23).
Entry  Tue Jun 24 22:31:10 2008, Masha, Update, Auxiliary locking, my first step in fiber stabilization 
There is a new 1W INNOLIGHT NPRO laser at the Symmetric Port.

Set up an interferometer to measure difference in phase noise introduced by a fiber. Works as expected without the fiber! (balanced intensity, out of phase
Entry  Tue Jun 24 22:43:23 2008, rana, Summary, SEI, Stack TF Screenshot.png
 
Entry  Wed Jun 25 00:35:40 2008, Koji, Summary, General, Optical Layout on the AP table optical_layout_ap_table.pngoptical_layout_ap_table.pdf
I have visited the AP table in order to investigate where we are going to put the optical setup for the abs. length meas. 
I have attached the PNG and PDF files to share the optical layout. It is not complete. Any comments or corrections are welcome.
Entry  Wed Jun 25 01:30:19 2008, John, Summary, IOO, Frequency noise after the MC MC2noise080623.png
I made some (very) rough estimates of the contribution made to the noise after the mode cleaner by three sources.

[COLOR=pink][B]Seismic noise[/B][/COLOR] - how much of the signal is due to the mode cleaner compenstaing for seismic disturbance of CARM.
Entry  Wed Jun 25 09:46:45 2008, Sharon, Update, , Adaptive Filters 
I have been learning about different methods for applying adaptive filters to improve the Mode Cleaner lock in specific, and other LIGO systems in general.
Finding the exact number of coeffs we would like to apply for our FIR adaptive filter is very important to the efficiency of the filter. Getting this number
higher might improve the accuracy of the filter, but costs time we do not have. Another important number to find is the step size. The step size is the
Entry  Wed Jun 25 11:01:45 2008, Masha, Update, Auxiliary locking, fiber stabilization 
For the first week, I have been learning about fiber noise cancellation, auxiliary locking techniques, and other relevant helpful topics in more detail.
I am now working on a setup (more detail in previous entry) to measure phase noise introduced by 25m(?) fiber, and then will proceed to try to cancel the
noise.
Entry  Wed Jun 25 11:36:14 2008, Max Jones, Update, Computer Scripts / Programs, First Week Update C1_NoiseBudgetPlot_Day.epsC1_NoiseBudgetPlot_Night.eps
For the first week I have been modifying the noise budget script in caltech/NB to run with 40 m parameters and data. As per Rana's instructions, I have
tried to run the script with only seismic and Darm sources. This involves identifying and changing channel names and altering paramter files (such as NB/ReferenceData/C1IFOparams.m).
To supply the parameter files, I have copied the H1 files with (as yet only) slight modification. The channel name changes have been made to mirror the
Entry  Wed Jun 25 12:25:28 2008, Eric, Summary, Cameras, 2D Gaussian Fitting Code 
I initially wrote a script in MATLAB that takes pictures of the laser beam's profile and fits them to a two dimensional gaussian in order to determine the
position and width of the beam.  This code is now (mostly) ported to C so that it can be imbedded in the camera software package that Joe is writing. 
The fitting works fairly well for pictures with the beam directly incident on the camera, and less well for pictures of scatter off the end mirrors of
Entry  Wed Jun 25 13:38:22 2008, Koji, Update, General, Abs. Len. Meas. ~ Placement of the 700mW NPRO on the AP table NPRO700mW_placement.jpg
This morning I have put the 700mW NPRO on the AP table for the abs length measurement.

The RF amplifier was moved (the cables were not changed). I cleaned up some cable arrangements. I was keen not to disturb any of the other optical path.
Entry  Wed Jun 25 13:56:56 2008, John, Summary, Locking, Tuesday night locking 
Rob, John

Worked to try and reduce the CARM offset using the dc arm transmissions before changing to SPOB DC. This proved somewhat unsuccessful, the offset couldn't
Entry  Wed Jun 25 18:03:21 2008, Yoichi, Configuration, PSL, FSS Input Offset slider problem 
While working on the PMC scanning, I noticed that the FSS input offset slider is doing nothing.
I traced the signal flow and checked the cables/boards.
The slider changes the output voltage from a VMIVME4116 DAC in the PSL rack. This output voltage is confirmed to be correct at the FLKM64 connector. The
Entry  Thu Jun 26 01:08:22 2008, rana, Configuration, General, Alarm Handler Revived b.gif
I have revived the Alarm Handler by turning it on on op540m and adjusting the levels of
several of the alarming channels to not alarm (like laser power). The alarm levels are now
set to something reasonable and people should start actually paying attention to them.
Entry  Thu Jun 26 01:10:18 2008, rana, Update, PEM, Alarm Handler indicates that dust level is high Untitled.png
[I]In its first useful act[/I], the Alarm Handler started beeping indicating that the [COLOR=purple]dust particle
counts for particles of diameter less than 0.5 micron had exceeded 5000 /cu. ft.[/COLOR] Here's the
80 day trend of particles, temperature and humidity:
Entry  Thu Jun 26 10:56:15 2008, Max Jones, Update, PEM, Removed Magnetometer 
I removed the Bartington Magnetometer on the x arm to one of the outside benches. I'll be trying to determine if and how it works today. It makes a horrible
high pitched sound which is due to the fact that the battery is probably 16 yrs old. It still works with ac power though and I want to see if it is still
operating correctly before I ask to buy a new battery. Sorry for the bother. 
Entry  Thu Jun 26 12:30:40 2008, John, Summary, Locking, CARM on REFL_DC 
[COLOR=blue]Idea:[/COLOR]

Try REFL_DC as the error signal for CARM rather than PO_DC.
Entry  Thu Jun 26 14:06:00 2008, Masha, Update, General, 500mW INNOLIGHT NPRO info 500mW_NPRO.JPG
Below is the placement of 500mW INNOLIGHT NPRO mephisto laser. It is set up on the Symmetric Port table. [IMG]elog:574/1[/IMG]
Entry  Thu Jun 26 18:24:28 2008, Yoichi, Update, PSL, FSS input ofset slider problem - fixed 
I checked the FSS servo interface board and found that a LT1125CSW used to differentialize offset channel was broken (no virtual short).
So I replaced it. Now the slider is working.
The op-amp was hitting the rail. So it seems like we had been applying the maximum offset to the FSS input all the time.
Entry  Thu Jun 26 18:27:04 2008, rana, Update, Computer Scripts / Programs, No Dataviewer No Cry 
Dataviewer was hanging. It would open the Grace window but then not plot anything. Since DTT was working
fine we diagnosed this as a DV only problem. It turned out that there was a boatload of messages in the
dataviewer queue. You can check for extra messaages using the command 'ipcs -q' and then use 'rmq' to remove them.
Entry  Thu Jun 26 18:29:44 2008, Jenne, Update, , MC Back online 
Jenne, Rob, Yoichi

I was playing with the Mode Cleaner earlier today, working on measuring the effect of the new filter (see next post for loop gain measurements etc.), and
Entry  Thu Jun 26 20:59:22 2008, rana, Update, Computer Scripts / Programs, Alarm Handler 
[COLOR=red][SIZE=5][B]Please do not turn off the Alarm Handler on op540m.[/B][/SIZE][/COLOR]
Entry  Thu Jun 26 21:07:11 2008, rana, Configuration, ASS, dust & MC1 Screenshot-2.png
I realized today, that yesterday while we were trying to debug the adaptive noise canceler, I turned
off the analog dewhitening on MC1. I did this by changing settings on the Xycom screen but I
forgot to elog this -- this may have caused problems with locking via increased frequency noise.
Entry  Thu Jun 26 22:08:33 2008, Jenne, Update, Electronics, 3.7MHz bandstop filter in MC Servo  MCLoopGainBoth.pngTP1ASpectrumBoth.pngQmonWithFilt.pngMCOut2WithFilt.png
The 3.7MHz elliptical bandstop filter that I made during my SURF summer is now installed in the MC servo loop to reduce the noise at 3.7MHz. 

I have taken transfer functions with and without the filter between TP1A and TP2A, with EXCA at -20dBm, using the HP4195A Network Analyzer.  I have also
Entry  Fri Jun 27 09:20:15 2008, steve, Frogs, PEM, dust particle count is up & alarm handler is on dust3y.jpg
This 3 years plot show the trend of seasons.
When outside air quality goes bad ( 0.5 micron > 1 million ) the lab follows.
I will demonstrate this effect with a 4th of July fire works calibration.
Entry  Fri Jun 27 14:36:39 2008, John, Summary, Locking,  gettingcloser.png
Rob, Yoichi, John

Some progress last night:
Entry  Fri Jun 27 15:20:52 2008, rob, DAQ, LSC, .ini file change 

I removed C1:LSC-XARM_CTRL from the frames and added C1:LSC-CARM_ERR
Entry  Fri Jun 27 18:03:46 2008, Jenne, Update, Electronics, Another bad cable in the MC servo 
Eric was helping me to measure the response of the LO input on the MC's Demod board, and when we disconnected the end of the cable between the demod board
and the delay line phase shifter for the 29.5MHz oscillator, we noticed that the phase shifter's end of the cable was loose, like the connector wasn't
fully connected. When we checked it by wiggling the connector, the SMA end fell off.  I made a new SMA end for the cable, and reinstalled the cable.  The
ELOG V3.1.3-