5337
|
Fri Sep 2 17:52:16 2011 |
kiwamu | Update | SUS | ITMX realigned |
The new ITMX was aligned by changing the DC biases.
The resultant DC biases are reasonably small.
C1:SUS-ITMX_PIT_COMM = -0.2909
C1:SUS-ITMX_YAW_COMM = -0.0617
The alignment was done by trying to resonate the green light in the X arm cavity.
The spot position of the green light on the ITMX mirror looked good. This was confirmed by inserting a sensor card.
I did the OSEM mid-range adjustment and the rotation adjustment but at the end the OSEM DC voltage has changed due to the DC bias operation.
The OSEM rotation was approximately optimized so that all the face shadow sensors are sensitive to the POS motion but the SIDE shadow sensor is insensitive to the POS motion.
It needs a free swinging diagnosis. |
5338
|
Fri Sep 2 17:57:18 2011 |
kiwamu | Update | SUS | Re: ITMY released without opening chambers |
It stacked again . We should take a closer look at it.
Quote from #5326 |
The ITMY mirror was released. The OSEM readouts became healthy.
|
|
5339
|
Sat Sep 3 14:47:50 2011 |
kiwamu | Update | IOO | triple resonant box : brief estimations about reflections and mode. depths |
(RF reflections)
The reflected RF power going back to the RF generation box will be :
Power at 11MHz = 2 dBm
Power at 29.5 MHz = 3 dBm
Power at 55 MHz = 9dBm
Assuming the input power at 11 and 55 MHz are at 27 dBm (40m wiki page). And 15 dBm for 29.5 MHz.
Since there is an RF combiner in between the generation box and the resonant box, it reduces the reflections by an additional factor of 10 dB (#4517)
In the estimation above, the reduction due to the RF combiner was taken into account.
(Modulation depths)
Besides the reflection issue, the circuit meets a rough requirement of 200 mrad at 11 and 55 MHz.
For the 29.5 MHz modulation, the depth will be reduced approximately by a factor of 2, which I don't think it's a significant issue.
So the modulation depths should be okay.
Assuming the performance of the resonant circuit remains the same (#2586), the modulation depths will be :
Mod. depth at 11 MHz = 280 mrad
Mod. depth at 29.5 MHz = 4 mrad (This is about half of the current modulation depth)
Mod. depth at 55 MHz = 250 mrad
Quote from #5336 |
What are the reflected RF powers for those frequencies?
Is the 29.5MHz more problem than the 55MHz, considering the required modulation depth?
|
|
5340
|
Mon Sep 5 21:12:05 2011 |
Dmass | Update | Computer Scripts / Programs | elog broke, fixed |
Restarted elog 9:11PM 9/5/11 |
5341
|
Tue Sep 6 08:05:53 2011 |
steve | Update | SUS | ITMX must be touching |
Quote: |
The new ITMX was aligned by changing the DC biases.
The resultant DC biases are reasonably small.
C1:SUS-ITMX_PIT_COMM = -0.2909
C1:SUS-ITMX_YAW_COMM = -0.0617
The alignment was done by trying to resonate the green light in the X arm cavity.
The spot position of the green light on the ITMX mirror looked good. This was confirmed by inserting a sensor card.
I did the OSEM mid-range adjustment and the rotation adjustment but at the end the OSEM DC voltage has changed due to the DC bias operation.
The OSEM rotation was approximately optimized so that all the face shadow sensors are sensitive to the POS motion but the SIDE shadow sensor is insensitive to the POS motion.
It needs a free swinging diagnosis.
|
ITMX OSEMs UL 1.8V, UR 1.7V, LR 0V, LL 0V, SD 1.3V at the same bias setting shown above. May be a lose earth quake tip?or magnet is touching? |
5342
|
Tue Sep 6 11:21:33 2011 |
Jenne | Update | SUS | ITMX rehung (Friday) |
[Jenne, Katrin, Jamie]
I'm a bad kid, and forgot to elog my Friday morning work...
Bob gave me back ITMX after a 48hour bake at 80C + clean RGA scan Friday morning after coffee and doughnuts. Katrin helped me put it back in the suspension wire.
While I was leveling the optic (making sure the scribe lines on each side of the optic are at the same height off the table), Katrin cut some new viton for replacement EQ stops. The optic was missing one lower earthquake stop (the one that Jamie noticed last week), and somehow one other rubber piece came out of the EQ stop on another lower screw while we were re-suspending the optic. We put the new stops in, and then checked the balance of the test mass.
The oplev is still the HeNe laser that is leveled to the level optical table in the cleanroom. The lever arm is ~1.5 meters, and over that distance the reflected beam was pointed "up" in pitch by ~1.5mm, which is less than one beam diameter of the HeNe. This is well within our ability to correct using the OSEMs.
We then locked the test mass, and installed it in the chamber. I approximately did the half-voltage centering of the OSEMs, leaving the fine-tuning to Kiwamu for after lunch. |
5343
|
Tue Sep 6 11:27:19 2011 |
Jenne | Update | General | Afternoon pre-pumpdown todo list |
These are the things that I can think of that we need to do before we can close up:
* Take a close look at both ITMs' OSEMs, and ensure that the magnets aren't too close to either plate in the OSEMs. Both have had funny business over the past week.
* Do a free swinging test on both ITMs. (ITMY may not need it, if we haven't touched it since the last free swinging test, but it can't hurt to take the data)
* Confirm that POX is exiting the chamber.
* Is there anything else???
Our goal is to finish this work by tonight, so that we can close doors and start pumping tomorrow. |
5344
|
Tue Sep 6 17:43:01 2011 |
Suresh | Update | IOO | Free Swing ITMY started |
Free swing of ITMY started at
Tue Sep 6 17:41:43 PDT 2011
|
5345
|
Tue Sep 6 17:48:57 2011 |
kiwamu | Update | SUS | free swinging test on ITMY |
Tue Sep 6 17:48:02 PDT 2011
999391697
|
5346
|
Tue Sep 6 17:56:12 2011 |
Jenne | Update | SUS | free swinging test on ITMX |
Quote: |
Tue Sep 6 17:48:02 PDT 2011
999391697
|
Kiwamu excited ITMY (which Suresh had already started). I just kicked ITMX:
Tue Sep 6 17:55:21 PDT 2011
999392136 |
5347
|
Tue Sep 6 17:56:53 2011 |
Jenne | Update | IOO | Free Swing ITMY started |
Quote: |
Free swing of ITMY started at
Tue Sep 6 17:41:43 PDT 2011
|
I think Kiwamu accidentally restarted this kick at 17:48:02 PDT. |
5348
|
Tue Sep 6 21:00:48 2011 |
Zach | Update | elog | elog restarted |
I restarted the elog with the script as it was not up when I tried to make a post. It was again unresponsive when I went to submit, but this time the script couldn't restart it. The log said it couldn't bind to 8080, which usually happens if the daemon is still running. I pkilled it, then reran the script, and it appears to be working. |
5349
|
Tue Sep 6 21:33:21 2011 |
Jenne | Update | SUS | Diagonalizability of ITMX and ITMY is acceptable |
[Rana and Kiwamu on ITMX, Jenne and Suresh on ITMY, Zombie/brains meeting on accepting the matricies]
Optic |
Spectra |
Matrix |
"Badness" |
ITMX |
 |
pit yaw pos side butt
UL 0.584 0.641 1.396 -0.578 0.558
UR 0.755 -1.359 0.120 -0.286 0.262
LR -1.245 -0.139 0.604 -0.388 0.511
LL -1.416 1.861 1.880 -0.681 -2.669
SD -0.753 0.492 3.263 1.000 -1.523 |
5.85983 |
ITMY |
 |
pit yaw pos side butt
UL 1.000 0.572 1.134 -0.059 0.951
UR 0.578 -1.428 0.916 -0.032 -1.024
LR -1.422 -0.531 0.866 -0.009 1.086
LL -1.000 1.469 1.084 -0.036 -0.939
SD -0.662 0.822 1.498 1.000 0.265 |
4.47727
|
OSEMs were tweaked. We have decided that both ITMs are okay in terms of their diagonalization. ITMY isn't stellar when you look at the spectra, but it's kind of close enough. Certainly the matrix looks fine.
Aside from checking on POX, I think we're now ready to close up. Check back later tonight for a final decision announced on the elog. |
5350
|
Tue Sep 6 22:51:53 2011 |
rana | Summary | Cameras | All Camera setups a need upgrading |
I just tried to adjust the ETMY camera and its not very user friendly = NEEDS FIXING.
* Camera view is upside down.
* Camera lens is contacting the lexan viewport cover; this means the focus cannot be adjusted without misaligning the camera.
* There's no strain relief of the camera cables at the can. Needs a rubber cable grommet too.
* There's a BNC "T" in the cable line.
Probably similar issues with some of the other setups; they've had aluminum foil covers for too long. We'll have a camera committee meeting tomorrow to see how to proceed. |
5351
|
Wed Sep 7 00:01:23 2011 |
Suresh | Update | IOO | ITMY chamber ready for heavy doors |
[Jenne, Suresh]
We did the following things in the ITMY chamber today:
1) We tried to get the ITMY stuck again by adjusting the coil gains so that it goes into the orientation where it used to get stuck. We (reassuringly) failed to get it stuck again. This, as we came to know later, is because kiwamu had rotated the side OSEM such that the optic does not get stuck . However the OSEM beam is at about 30 deg to the vertical and the SD is sensitive to POS motion now resulting in the poorer separation of modes as noted by Jenne earlier (5439)
2) We checked the earthquake stops and repositioned two at the bottom (towards the AR side of the optic) which we had backed out earlier.
3) We took pics of all the OSEMS.
4) Checked to see if there are any stray beams with an IR card. There were none.
5) I obtained the max values of the OSEMS by misaligning the optic with the coil offsets. These values are in good agreement with those on the wiki
OSEM UL UR LR LL SD
Max 1.80 1.53 1.68 1.96 2.10
Current 0.97 0.79 0.83 0.97 1.02
We can close the heavy doors tomorrow morning. |
5352
|
Wed Sep 7 00:39:34 2011 |
rana | Update | SUS | ITMX adjustments |
(What we did)
* Moved SUS to edge of table for OSEM adjustment.
* Leveled the table in this temporary tower position.
* Rotated all OSEMs to give some seperation between magnets and LED/PD packages.
* Moved the upper OSEM bracket a little bit upward.
* All the OSEM holding set screws were short with flat heads; this is annoying since we would like to use them more like thumbscrews. Steve took the long set-screws out of the old ITMX cage and we swapped them. Need to order ~100 silver-plated socket head spare/replacements.
* Took pictures of OSEMs.
* Moved tower back to old position.
* Releveled the table (added one rectangular weight in the NW corner of the table).
* Find that ITMX OSEMs were a couple 100 micron out of position; we adjusted them in-situ in the final position of the tower, trying not to rotate them. All mean voltages now are within 100 mV of ideal half-light.
* Back/front EQ positions adjusted by the screw method. bottom/top stops adjusted earlier.
* OSEM cables tied down with copper wire.
* Increased the incident power up to 91 mW going into MC to temporarily make the POX beam more visible.
* The POX beam was checked. It was exiting from the chamber and going through about the center of the viewport. |
5353
|
Wed Sep 7 00:44:51 2011 |
Jenne | Update | SUS | Freeswing all |
I just started a freeswing all, as a final check before we pump:
Wed Sep 7 00:43:21 PDT 2011
999416616
Wed Sep 7 00:43:32 PDT 2011
WATCHDOGS WILL BE RESET 5 HOURS AFTER THIS TIME
sleeping for 5 hours...
Jamie: Please do a quickie analysis (at least for the ITMs) before helping Steve with the heavy doors.
I closed the PSL shutter.
Both ITM chambers were checked for tools, so there should be nothing left to do but put the heavy doors on, and begin pumping. |
5354
|
Wed Sep 7 00:47:51 2011 |
Jenne | Update | VAC | PUMP is a GO! |
Steve and Jamie: After Jamie checks the ITM free swingings, please put on the ITM heavy doors and start the pump! For real this time!!! Yeah! |
5355
|
Wed Sep 7 08:14:01 2011 |
steve | Update | SUS | final OSEM check |
All fine, except ITMX_sensor_UL's 60 counts deep hoop for an hour. |
5356
|
Wed Sep 7 09:21:57 2011 |
jamie | Update | SUS | SUS spectra before close up |
Here are all suspension diagonalization spectra before close up. Notes:
- TMX looks the worst, but I think we can live with it. The large glitch in the UL sensor at around 999423150 (#5355) is worrying. However, it seemed to recover. The spectra below were taken from data before the glitch.
- ITMY has a lot of imaginary components. We previously found that this was due to a problem with one of it's whitening filters (#5288). I assume we're seeing the same issue here.
- SRM needs a little more data to be able to distinguish the POS and SIDE peaks, but otherwise it looks ok.
ITMX |
 |
pit yaw pos side butt
UL 0.355 0.539 0.976 -0.500 0.182
UR 0.833 -1.406 -0.307 -0.118 0.537
LR -1.167 0.055 0.717 -0.445 0.286
LL -1.645 2.000 2.000 -0.828 -2.995
SD -0.747 0.828 2.483 1.000 -1.637 |
8.01148 |
ITMY |
 |
pit yaw pos side butt
UL 1.003 0.577 1.142 -0.038 0.954
UR 0.582 -1.423 0.931 -0.013 -1.031
LR -1.418 -0.545 0.858 0.008 1.081
LL -0.997 1.455 1.069 -0.017 -0.934
SD -0.638 0.797 1.246 1.000 0.264 |
4.46659 |
BS |
 |
pit yaw pos side butt
UL 1.612 0.656 0.406 0.277 1.031
UR 0.176 -1.344 1.683 -0.058 -0.931
LR -1.824 -0.187 1.594 -0.086 0.951
LL -0.388 1.813 0.317 0.249 -1.087
SD 0.740 0.301 -3.354 1.000 0.035 |
5.49597 |
PRM |
 |
pit yaw pos side butt
UL 0.546 1.436 1.862 -0.345 0.866
UR 1.350 -0.564 0.551 -0.055 -0.878
LR -0.650 -0.977 0.138 0.023 0.858
LL -1.454 1.023 1.449 -0.268 -1.398
SD 0.634 -0.620 -0.729 1.000 0.611 |
5.78216 |
SRM |
|
|
|
ETMX |
 |
pit yaw pos side butt
UL 0.863 1.559 1.572 0.004 1.029
UR 0.127 -0.441 1.869 0.480 -1.162
LR -1.873 -0.440 0.428 0.493 0.939
LL -1.137 1.560 0.131 0.017 -0.871
SD 1.838 3.447 -0.864 1.000 -0.135 |
5.5259 |
ETMY |
 |
pit yaw pos side butt
UL -0.337 1.275 1.464 -0.024 0.929
UR 1.014 -0.725 1.414 -0.055 -1.102
LR -0.649 -1.363 0.536 -0.039 0.750
LL -2.000 0.637 0.586 -0.007 -1.220
SD 0.057 -0.016 1.202 1.000 0.142 |
4.22572 |
MC1 |
 |
pit yaw pos side butt
UL 0.858 0.974 0.128 0.053 -0.000
UR 0.184 -0.763 0.911 0.018 0.001
LR -1.816 -2.000 1.872 0.002 3.999
LL -1.142 -0.263 1.089 0.037 0.001
SD 0.040 0.036 -0.216 1.000 -0.002 |
5.36332 |
MC2 |
 |
pit yaw pos side butt
UL 1.047 0.764 1.028 0.124 0.948
UR 0.644 -1.236 1.092 -0.088 -0.949
LR -1.356 -0.680 0.972 -0.096 1.007
LL -0.953 1.320 0.908 0.117 -1.095
SD -0.092 -0.145 -0.787 1.000 -0.065 |
4.029 |
MC3 |
 |
pit yaw pos side butt
UL 1.599 0.343 1.148 0.168 1.101
UR 0.031 -1.647 1.139 0.202 -1.010
LR -1.969 0.010 0.852 0.111 0.893
LL -0.401 2.000 0.861 0.077 -0.995
SD -0.414 0.392 -1.677 1.000 0.018 |
3.61734 |
|
5357
|
Wed Sep 7 12:03:49 2011 |
steve | Update | VAC | Pump down has started |
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
1, turned off AC power to PZT Jena HV ps
2, checked jam nut positions
3, cheched single o-ring shims
4, closed psl out shutter |
5358
|
Wed Sep 7 13:28:25 2011 |
steve | Summary | Cameras | All Camera setups a need upgrading |
Quote: |
I just tried to adjust the ETMY camera and its not very user friendly = NEEDS FIXING.
* Camera view is upside down.
* Camera lens is contacting the lexan viewport cover; this means the focus cannot be adjusted without misaligning the camera.
* There's no strain relief of the camera cables at the can. Needs a rubber cable grommet too.
* There's a BNC "T" in the cable line.
Probably similar issues with some of the other setups; they've had aluminum foil covers for too long. We'll have a camera committee meeting tomorrow to see how to proceed.
|
ITMY has been upgraded here I have the new lenses on hand to do the others when it fit into the schedule. |
5359
|
Wed Sep 7 16:21:35 2011 |
kiwamu | Update | LSC | arm loss measurement : resluts |
Here are the results of the arm loss measurements, which I have done before the vent.
I ran the existing matlab script, called 'armLoss.m', to estimate the loss. The script resides in /scripts/LSC.
(Y arm)
Round trip loss = 154.668624 +/- 11.343204 ppm

The figure above is a time series of the measurement.
In the lower plot the power in the ASDC_PD are plotted. The green dotted-curve is the power when the Y arm is unlocked.
The blue dotted-curve is the one when the Y arm is locked.
In the upper plot the estimated loss from each combination of locked/unlocked power are plotted.
(X arm)
Round trip loss = ????? 50 ppm ?????
The obtained time series looked wired because difference in the ASDC power when the arm was locked/unlocked were small.
This small difference results in such a small loss.
To see what was going on I will look at the trend data.

Quote from #5077 |
I did the measurement of the arm loss on both X and Y arm by running the armLoss script.
The results will be posted later.
|
|
5360
|
Wed Sep 7 17:28:41 2011 |
kiwamu | Update | LSC | X arm loss measurement : not good |
The measurement itself wasn't good.
I looked at the full 2 kHz data which was taken during the time when I was running the arm loss script on the X arm.
The plot below shows the raw data. The X arm was locked and unlocked sequentially several times.
The ASDC power didn't show a significant difference between the state where it is locked and unlocked.
I am not sure why, but It could be because of a misalginment or some kind of mode-mismatching, which can decrease the coupling efficiency of light going into the cavity.

(some notes)
The raw data were analyzed.
I split the ASDC data into two data, (1) low power state, when the cavity is locked (2) high power state, when the cavity is unlocked.
Then each state was averaged to estimate the averaged ASDC power in each case.
The number I obtained are :
ASDC when X arm was locked = 54.77755 cnts
ASDC when X arm was unlocked = 55.45830 cnts
Those numbers correspond to a round trip loss of 78.780778 ppm, which sounds too small for me.
Quote from #5359 |
To see what was going on I will look at the trend data.
|
|
5361
|
Wed Sep 7 18:19:37 2011 |
steve | HowTo | VAC | stop pump down for overnight |
Quote: |
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
1, turned off AC power to PZT Jena HV ps
2, checked jam nut positions
3, cheched single o-ring shims
4, closed psl out shutter
|
We are at 30 Torr of 7 hours of pumping with 2 roughing pumps.
Kiwamu will take over the rest of the roughing today. He will keep an eye on the pumping speed to be ~1-2 Torr/min and open up the manual RV1 valve if needed.
The present status is #3023 of "chamber open to vacuum open" mode and waiting the P1 pressure to drop to 500 mTorr
He will do the following to stop pumping at P1 = 500 mTorr
1, close V3
2, close RV1 with torque wheel
3, turn off PR1 & 3
4, disconnect metal hose between RV1 and PR3
I will start the Maglev tomorrow morning. |
5362
|
Wed Sep 7 20:44:11 2011 |
Suresh | Update | elog | restarted |
Elog crashed / dormant for long time. A look at the log file indicated that it was busy generating png thumbnails for pdf files.
Restarted at Wed Sep 7 20:41:13 PDT 2011
|
5363
|
Wed Sep 7 21:45:16 2011 |
kiwamu | Update | VAC | pump stopped. Pressure is at 450 mtorr |
I stopped puming at 9:30 PM and the pressure in P1 is at 450 mtorr.
I followed exactly he procedure that Steve noted on his elog entry.
Here is a plot of the histroy of our pumping today.

Quote from #5361 |
1, close V3
2, close RV1 with torque wheel
3, turn off PR1 & 3
4, disconnect metal hose between RV1 and PR3
I will start the Maglev tomorrow morning.
|
|
5364
|
Wed Sep 7 22:17:04 2011 |
rana | Update | IOO | RF Amp for EOM on PSL Table |
After Steve pointed out the 'deep hoop' issue, we decided to examine putting an RF Amp on the PSL table, between the RF combiner and the triple resonant box.
This will reduce the chances of standing waves in the cables and reduce the radiation induced pick-up in the RF PD and Demod electronics.
We would like to send ~10 dBm from the distribution box to the combiner. We also want to able to get as much as ~33 dBm of drive at 11 and 55 MHz. So the amp should have a gain of ~20-30 dB and an operating range of 10-100 MHz.
Also desirable are low distortion (high IP3) and good reverse isolation ( > 40 dB).
Some possibilities so far (please add your RF Google Results here):
1) Mini-Circuits ZHL-1-2W-S: G = +32 dB, Max Out = +33 dBm, NF = 6 dB, Directivity = 25 dB
2) Mini-Circuits TIA-1000-1R8: G=+40 dB, Max Out = +36 dBm, NF = 15 dB (AC Powered, Inst. Amp), Directivity = 58 dB.
3) Mini-Circuits ZHL-2-8: G = +27dB, Max out = +29 dBm, NF = 6dB, Directivity = 32 dB
4) RFbay MPA-10-40: G = +40dB, Max Out = + 30 dBm, NF = 3.3 dB, Rev Iso = 23 dB
5) No proper stuff from Teledyne Couger
|
5365
|
Thu Sep 8 10:50:44 2011 |
steve | Update | VAC | pumpdown #71 comleted |
Vacuum status: " vacuum normal" CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve took 11 hours at 1-2 Torr/min speed. We had a leak at the metal hose connecting o-ring that became visible at 200 Torr.
The vacuum envelope pressure rose to 500 mTorr from 450 mTorr This is 50 mTorr leak plus outgassing over 11 hrs over night stop = 5 mTorr / hr
Atm2, Maglev pumpdown details. P2 and P3 are in the foreline of the Maglev. The pressure peaks at 4 Torr beacause the 3 drypumps have little pumpimg speed at this range.
External fan is turned on during this one hour period to prevent Maglev turbo from overheating.
Same things are happenning with the two small TP2 and TP3 pumps under load. Their foreline pressure peak at 1 Torr. They slow down to 45 K RPM from 50K RPM and warm up to 36-39 C
Precondition: 36 days at atm |
5366
|
Thu Sep 8 13:20:07 2011 |
steve | Update | PEM | vac envelope at atm for 36 days |
We tried not to open chambers above 10,000 particles of 0.5 micron cf/min
New items going in: 2 rasor beam traps, 5 badly oxidized old silver plated setscrew with spring loaded tips......to be replaced in the future, viton tips for eq screws....some are lose, gold plated allen wrench installed at ITMX bottom, reglued magnet on ITMX
Bad hardware things found: nylon ball "locking elements" on OSEM locking set screws with screwdriver slot, lose 1064 nm filter on OSEM pd |
5367
|
Thu Sep 8 20:13:24 2011 |
kiwamu | Update | IOO | MC is back to full power |
[Suresh / Kiwamu]
The attenuator was removed and now the MC is happily locked with the full power of 1.2 W.
(what we did)
+ replaced the perfect reflector, which was before the MCREFL_PD, by a 10% beam splitter like it used to be.
+ removed the attenuator (combination of HWP and PBS).
+ realigned the beam path on the AP table, including the MCREFL path and WFS path.
+ made the aperture of the MC2F camera narrower in order to avoid a saturation.
+ aligned the MC suspensions so that it resonates with the TEM00 mode.
+ put a ND filter on the AS camera
(notes)
C1:IOO-MC_RFPD_DCMON = 0.98 (locked)
C1:IOO-MC_TRANS_SUM = 17500 (locekd)
(next things to do)
+ measurement of the spot positions on each MC mirror.
+ centering of the beam spot by steering the input mirrors on the PSL table |
5368
|
Fri Sep 9 11:59:58 2011 |
kiwamu | Update | IOO | PZT1 doesn't work |
Last night I noticed that PZT1 didn't work properly
I am not sure what is going on. Today I will try localizing the cause of the problem.
As far as I remember it was perfectly working at the time just after we readjusted the OSEMs on MC1 and MC3 (Aug 23th)
The symptoms are :
+ No response to both pitch and yaw control from EPICS (i.e. C1:LSC-PZT1_X and C1:LSC-PZT1_Y)
+ When a big value (-3 or so) from EPICS was applied, the PZT1 mirror suddenly jumped.
However it turned out it just corresponded to a state where OOR (Out Of Range) LED lights up.
I did some brief checks :
+ checked the voltage going into the HV amplifiers' "MOD" input. Those are the voltage coming out from DACs and controlled from EPICS.
--> looked healthy. They went from -10 to 10 V as expected (although the HV amp takes up to only +/-5V).
+ swapped the ''MOD" input cables such that C1:LSC-PZT1 controls the PZT2 HV and vice versa.
--> The PZT2 mirror was still controlable, but the PZT1 mirror still didn't move. So the DAC and EPICS are innocent.
+ swapped the D-dub cables, which are directly going into the feedthroughs, such that the PZT1 HV drives the PZT2 mirrors and vice versa.
--> the PZT2 mirror became unable to be controlled. For the PZT1 mirror, only PITCH worked smoothly.
|
5369
|
Fri Sep 9 13:29:09 2011 |
kiwamu | Update | IOO | a history of PZT mirror |
Something happened about 8 years ago.
Old iLog entry by AJW (2003/Sep/8)
Old iLog entry by AJW (2003/Sep/9)
Quote: |
Last night I noticed that PZT1 didn't work properly
|
|
5370
|
Fri Sep 9 14:55:03 2011 |
kiwamu | Update | SUS | OSEM pictures on ITMs |
The OSEM pictures taken in Sep/6 have been uploaded to Picasa.
https://picasaweb.google.com/foteee |
5371
|
Fri Sep 9 16:16:59 2011 |
kiwamu | Update | IOO | spot positions on MC mirrors (in-vac) |
The spot positions on the MC mirrors were measured in the vacuum condition.
The obtained spot positions are quite bad and roughly at 2-3 mm level. We have to realign the beam axis and the MC mirrors.
|
Feb 26 2011 |
May 08 2011 |
Aug 2 2011 |
Aug 10 2011 (in air) |
Aug 14 2011 (in air) |
Aug 23 2011 (in air)
|
[NEW] Sep 9 2011 |
MC1 pit [mm] |
1.6 |
1.9 |
1.93 |
-0.858 |
-0.2 |
0.1354 |
-1.55 |
MC2 pit [mm] |
6.4 |
9.0 |
9.03 |
-0.844 |
-0.8 |
-0.2522 |
-2.28 |
MC3 pit [mm] |
1.4 |
2.0 |
2.01 |
-1.03 |
-0.1 |
-0.1383 |
-1.8 |
MC1 yaw [mm] |
-1.5 |
-1.7 |
-1.72 |
-0.847 |
-1.1 |
-1.0893 |
-0.02 |
MC2 yaw [mm] |
1.0 |
0.2 |
0.178 |
0.582 |
0.6 |
0.7122 |
3.52 |
MC3 yaw [mm] |
-1.3 |
-1.9 |
-1.87 |
-1.06 |
-1.1 |
-1.5587 |
-2.145 |
|
5372
|
Fri Sep 9 19:15:17 2011 |
rana | Update | IOO | RF Amp for EOM on PSL Table |
Quote: |
After Steve pointed out the 'deep hoop' issue, we decided to examine putting an RF Amp on the PSL table, between the RF combiner and the triple resonant box.
5) No proper stuff from Teledyne Couger
|
By looking at what Daniel used in the low noise EOM Driver for aLIGO, we found the A2CP2596 from Cougar.
G = +24 dB, NF = 5 dB, Max Out = +37 dBm. It comes in a 2-stage SMA connector package. I've asked Steve to order 2 of them with the appropriate heatsinks. |
5373
|
Fri Sep 9 20:52:59 2011 |
kiwamu | Update | IOO | spot positions on MC mirrors (in-vac) |
The spot positions on the MC mirrors were readjusted.
All the amount of the off-center became smaller than 2 mm, which meet requirements of the beam clearance on the Faraday.
|
Feb 26 2011 |
May 08 2011 |
Aug 2 2011 |
Aug 10 2011 (in air) |
Aug 14 2011 (in air) |
Aug 23 2011 (in air)
|
Sep 9 2011 |
[NEW] Sep 9 2011 |
MC1 pit [mm] |
1.6 |
1.9 |
1.93 |
-0.858 |
-0.2 |
0.1354 |
-1.55 |
0.22 |
MC2 pit [mm] |
6.4 |
9.0 |
9.03 |
-0.844 |
-0.8 |
-0.2522 |
-2.28 |
-0.34 |
MC3 pit [mm] |
1.4 |
2.0 |
2.01 |
-1.03 |
-0.1 |
-0.1383 |
-1.8 |
-0.21 |
MC1 yaw [mm] |
-1.5 |
-1.7 |
-1.72 |
-0.847 |
-1.1 |
-1.0893 |
-0.02 |
-1.15 |
MC2 yaw [mm] |
1.0 |
0.2 |
0.178 |
0.582 |
0.6 |
0.7122 |
3.52 |
0.07 |
MC3 yaw [mm] |
-1.3 |
-1.9 |
-1.87 |
-1.06 |
-1.1 |
-1.5587 |
-2.145 |
-1.07 |
In order to improve the MC1-YAW and MC3-YAW spot positions, the angle of the incident beam has to be shifted by approximately 1/100 rad.
However it turned out to be very difficult to introduce such amount of angle only with the steering mirrors on the PSL table since we have to keep the same translation while changing the angle.
Quote from #5371 |
The obtained spot positions are quite bad and roughly at 2-3 mm level. We have to realign the beam axis and the MC mirrors.
|
|
5374
|
Sat Sep 10 01:36:15 2011 |
kiwamu | Update | ASC | interferometer coarsely aligned |
The interferometer was coarsely aligned.
Now spatially overwrapped DRMI and FP arm fringes are visible on the AS camera although the incident beam alignment was done only with PZT2.
All the DC biases were saved so that we can go back to this condition any time.
/***** some health checks *******/
[FINE] IPPOS : it looks okay but the spot on the QPD is a little bit too low by a few mm.
[NOT GOOD] IPANG : maybe hitting a post or something because the spot is vertically split into two. The spot is too low.
[FINE] POX/POY/POP : they all are coming out. POP is visible with an IR viewer.
[FINE] REFL : no clipping but the beam looks a little bit too low relative to the CCD camera.
[FINE] AS : no clipping and the spot position on the AS camera looks fine.
[FINE] Green beams : both X and Y beams are successfully landing onto the PST table without no clipping.
[FINE] Suspensions : all of them are reasonably quiet without the oplevs, which is good. |
5375
|
Sat Sep 10 02:28:45 2011 |
kiwamu | Update | SUS | free swinging test in vacuum condition |
All the optcs were excited
Sat Sep 10 02:14:11 PDT 2011
999681266
|
5376
|
Sat Sep 10 11:07:37 2011 |
rana | HowTo | SUS | Optical Lever Servo Tuning thoughts |
Now that we are in a moderately stable condition, its time to design the optical lever feedback transfer functions. We should think carefully about how to do this optimally.
In the past, the feedback shape was velocity damping from 0-10 Hz, with some additional resonant gain around the pendulum and stack modes. There were some low pass filters above ~30 Hz. These were all hand tuned.
I propose that we should look into designing optimal feedback loops for the oplevs. In principle, we can do this by defining some optimal feedback cost function and then calculate the poles/zeros in matlab.
How to define the cost function (? please add more notes to this entry):
1) The ERROR signal should be reduced. We need to define a weight function for the ERROR signal: C_1(f) = W_1(f) * (ERR(f)^2)
2) The OL QPDs have a finite sensing noise, so there is no sense in suppressing the signal below this level. Need to determine what the sensing noise is.
3) The feedback signal at high frequencies (30 Hz < f < 300 Hz) should be low passed to prevent adding noise to the interferometer via the A2L coupling. It also doesn't help to reduce this below the level of the seismic noise. The cost function on the feedback should be weighted apprpriately given knowledge about the sensing noise of the OL, the seismic noise (including stack), and the interferometer noise (PRC, SRC, MICH, DARM).
4) The servo should be stable: even if there is a negligible effect on the ERROR signal, we would not want to have more than 10 dB of gain peaking around the UGFs.
5) The OL QPDs are dominated by drift of the stack, laser, etc. at some low frequencies. We should make sure the low frequency feedback is high passed appropriately.
6) Minimize transmitted power rms in single arm lock etc. |
5377
|
Sat Sep 10 14:55:28 2011 |
Keiko | Update | LSC | 3f demodulation board check |
To check the demodulation boards for REFL33 and REFL165, a long cable from ETMY (SUS-ETMY-SDCOIL-EXT monitor) is pulled to the rack on Y side.
(1) A filter just after the RF input and (2) transfer function from the RF input to the demodulated signal will be checked for the two 3f demod boards to confirm that they are appropriate for 33 and 165 MHz. |
5378
|
Sat Sep 10 16:10:42 2011 |
Keiko | Update | LSC | 3f demodulation board check |
There is a LP filter just after the RF input of an demodulation board (its schematic can be found as D990511-00-C on DCC). I have checked if the 3f freq, 33MHz, can pass this filter. The filter TF from the RF input to RF monitor (the filter is between the input and monitor) on REFL33 demo-board was measured as shown in Fig. 1. At 33MHz, the magnitude is still flat and OK, but the phase is quite steep. I am going to consider if it is ok for the PDH method or not.

Fig. 1 Transfer function from the RF input to RF monitor on the REFL33 demodulation board. At 33MHz, a very steep phase is applied on the input signal.
Quote: |
To check the demodulation boards for REFL33 and REFL165, a long cable from ETMY (SUS-ETMY-SDCOIL-EXT monitor) is pulled to the rack on Y side.
(1) A filter just after the RF input and (2) transfer function from the RF input to the demodulated signal will be checked for the two 3f demod boards to confirm that they are appropriate for 33 and 165 MHz.
|
|
5379
|
Sat Sep 10 18:52:45 2011 |
rana | Update | Computers | conlog getting filled up |
One of the reasons that conlog seems so slow lately is that its been writing 100's of MB of .log files every day since early summer. It looks like the people who have been working on the mdl builds have not been properly adjusting the conlog channel lists. When this is not done conlog just gets filled up with non-control channels like OUT, OUTPUT, OUTMON, etc.
Peter Shawhan has supplied us with many scripts in the conlog directory to clean up these bloated files and fix the channel list. |
5380
|
Sat Sep 10 18:57:52 2011 |
Keiko | Update | LSC | 3f demodulation board check |
The phase delay due to the RF input filter on the demodulation board will not bother the resulting PDH signals.
I quickly calculated the below question (see the blue sentence in the quote below). I applied an arbitrary phase delay (theta) due to the filter I measured, on the detected RF signal by the photo detector. Then the filtered RF signal is multiplied by cos(omega_m) then filter the higher (2 omega_m) freqency as the usual mixing operation for the PDH signal. As a result, the I signal is delayed by cos(theta) and the Q signal is delayed by sin(theta). Therefore the resulting signals and its orthogonalitity is kept ok. From the sideband point of view, theta is applied on both upper and lower and seems to make the unbalance, however, as it is like a fixed phase offset on both SBs at the modulation frequency, the resulting signals is just multiplied by cos or sin theta for I and Q, respectively. It won't make any strange effect (it is difficult to explain by sentence not using equations!).
Quote: |
There is a LP filter just after the RF input of an demodulation board (its schematic can be found as D990511-00-C on DCC). I have checked if the 3f freq, 33MHz, can pass this filter. The filter TF from the RF input to RF monitor (the filter is between the input and monitor) on REFL33 demo-board was measured as shown in Fig. 1. At 33MHz, the magnitude is still flat and OK, but the phase is quite steep. I am going to consider if it is ok for the PDH method or not.
Fig. 1 Transfer function from the RF input to RF monitor on the REFL33 demodulation board. At 33MHz, a very steep phase is applied on the input signal.
Quote: |
To check the demodulation boards for REFL33 and REFL165, a long cable from ETMY (SUS-ETMY-SDCOIL-EXT monitor) is pulled to the rack on Y side.
(1) A filter just after the RF input and (2) transfer function from the RF input to the demodulated signal will be checked for the two 3f demod boards to confirm that they are appropriate for 33 and 165 MHz.
|
|
|
5381
|
Sat Sep 10 19:03:57 2011 |
rana | Update | LSC | Y Arm work |
I lined up the Y Arm for locking and then centered the oplevs for ETMY and ITMY.
* The ITMY OL has still got the old style laser. Steve, pleaes swap this one for a HeNe. Also the optical layout seems strange: there are two copies of the laser beam going into the chamber (??). Also, the QPD transimpedance needs to be increase by a factor of ~10. We're only getting ~500 counts per quadrant. Its worth it for someone to re-examine the whole ITMY OL beam layout.
* The ETMY OL beam was coming out but clipping on the mount for the ETMY OL HeNe. This indicates a failure on our part to do the ETMY closeout alignment properly. In fact, I get the feeling from looking around that we overlooked aligning the OL and IPPOS/ANG beams this time. If we're unlucky this could cause us to vent again. I undid part of the laser mount and changed the height on the receiving mirror to get the beam back onto the QPD.
I noticed that there is significant green light now getting into some of the IR PDs; beacuse of this there are weird offsets in the TRY QPD and perhaps elsewhere. We had better purchase some filters to tape over the front of the sensitive IR sensors to prevent the couplling from the green laser.
* There is a beam on IPPOS, but its too big for the detector (this has always been the case). We need to put a 2" lens with a weak focusing power on this path so as to halve the beam size on the detector. Right now its clipping and misleading. There is also a 0.9V offset on the SUM signal. I'm not sure if this readout is working at all.
* I couldn't find any beam on IPANG at all. Not sure what's changed since Kiwamu saw it. |
5382
|
Sat Sep 10 19:45:29 2011 |
Jenne | Update | LSC | Y Arm work |
Quote: |
* ITMY OL: Also the optical layout seems strange: there are two copies of the laser beam going into the chamber (??).
* The ETMY OL beam was coming out but clipping on the mount for the ETMY OL HeNe. This indicates a failure on our part to do the ETMY closeout alignment properly.
|
The 2nd beam from this laser is for the SRM's OpLev, so that shouldn't be changed.
For better or worse, we didn't do anything to the ETM OpLevs, because they don't have any in-vac steering optics. We did however go through and check on all the corner OpLevs. |
5383
|
Sat Sep 10 20:30:01 2011 |
rana | Update | IOO | MC trans re-aligned / MC2 shifted mysteriously / MC2 re-aligned |

I re-aligned the beam onto the MC TRANS QPD since Kiwamu had centered the spots on the mirrors. However, I then inspected the MC2F camera. After coming back into the control room I noticed that the MC transmission had gone down by 50% and that the MC2 OSEMs showed a large step. My guess is that somehow the opening and closing of the can shifted the suspension. So I adjusted the MC2 alignment biases to recover the transmitted power (its now ~50000 instead of the ~33000 from Friday). |
5384
|
Sun Sep 11 15:19:39 2011 |
kiwamu | Update | LSC | phase delay in RF signals |
A comment :
Since the LSC RFPD have a long cable of more than 6 m, which rotates a 33 MHz signal by more than 360 deg, so the delay has always existed in everywhere.
The circuit you measured is a part of the delay existing in the LSC system, but of course it's not a problem as you said.
In principle a delay changes only the demodulation phase. That's how we treat them.
RA: Actually, the issue is not the delay, but instead the dispersion. Is there a problem if we have too much dispersion from the RF filter?
|
5385
|
Sun Sep 11 22:36:32 2011 |
Keiko | Update | LSC | 3f demodulation board check |
Filters at the RF inputs of REFL33 and REFL165 demodulation boards were measured again. The filters will be totally fine for 33MHz and 165MHz.
Last time I forgot to calibrate the cable lengths, therefore the phase delay of the measurement included the cable lengths. This time the measurements were done for REFL33 and REFL165 demod board with calibration. As the cable lengths were calibrated, the shown plots (Fig.1 and Fig.2) do not include the phase delay dues to measurement cables. Please note that the x-axis is in linear. The phase delays of both boards seems to be not too steep (it will not affect anyway, as Kiwamu pointed out in his comment on the previous post). You can see that the two filters do not filter 33MHz and 165MHz component out.

Fig.1 A response of a filter which is placed just after the RF input of the demodulation board for REFL33. X-axis is shown in linear (~50MHz).

Fig.2 A response of a filter which is placed just after the RF input of the demodulation board for REFL165.
Quote: |
There is a LP filter just after the RF input of an demodulation board (its schematic can be found as D990511-00-C on DCC). I have checked if the 3f freq, 33MHz, can pass this filter. The filter TF from the RF input to RF monitor (the filter is between the input and monitor) on REFL33 demo-board was measured as shown in Fig. 1. At 33MHz, the magnitude is still flat and OK, but the phase is quite steep. I am going to consider if it is ok for the PDH method or not.

Fig. 1 Transfer function from the RF input to RF monitor on the REFL33 demodulation board. At 33MHz, a very steep phase is applied on the input signal.
Quote: |
To check the demodulation boards for REFL33 and REFL165, a long cable from ETMY (SUS-ETMY-SDCOIL-EXT monitor) is pulled to the rack on Y side.
(1) A filter just after the RF input and (2) transfer function from the RF input to the demodulated signal will be checked for the two 3f demod boards to confirm that they are appropriate for 33 and 165 MHz.
|
|
|
5386
|
Mon Sep 12 13:24:07 2011 |
Keiko | Update | LSC | 3f demodulation board check |
I also quickly checked the orthogonality of the demodulation board for REFL33 and REFL165 using function generators and oscilloscope. I checked the frequencies at 1,10,100,1K,10KHz of the demodulated signals. They are fine and ready for 3f signal extraction. |