40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 106 of 170  Not logged in ELOG logo
Entry  Fri Apr 8 01:05:45 2011, Suresh, Update, RF System, RF Source Harmonics RF_Source_Harmonics_Sheet1.pdf
 
 The measured power levels of the RF source harmonics are given below:
 
    Reply  Fri Apr 22 09:05:53 2011, Suresh, Update, RF System, RF Source Harmonics 

As seen in the previous measurement the first harmonic of both the 11 MHz and 55 MHz outputs are about 30dB
higher than desired.  In an attempt to attenuate these and higher harmonics I introduced SBP-10.7 filters into
       Reply  Fri Apr 22 10:28:22 2011, rana, Update, RF System, RF Source Harmonics 
You should be able to resolve the other harmonics by [B][COLOR=blue]decreasing the IF BW or RBW[/COLOR][/B] on the analyzer. Even though
they're OK, its useful to have the final measurement of all of them in some kinds of physical units (like dBm, but
not dBm/Hz or dB or dBcubits).
          Reply  Wed May 4 15:39:32 2011, Suresh, Update, RF System, RF Source Harmonics RF_Harmonics_Sheet1.pdf


I have measured the RF source harmonics in dBm using the HP 8591E spectrum analyser.  There is a small discrepancy (< 1 dBm) in the value of RF power shown
Entry  Wed May 4 13:51:51 2011, valera, Configuration, , Intermittent MC3 UL PD signal mc3ulpdmon.pdf
The attached plot shows the 30 day trend of the MC3 UL PD signal. The signal dropped to zero at some point but now it is close to the level it was a
few weeks ago. There still could be a problem with the cable.
The rest of the MC1,2,3 PD signals looked ok.
    Reply  Wed May 4 15:22:39 2011, kiwamu, Update, , Re: Intermittent MC3 UL PD signal 
I went push all the possible connectors for the MC3 shadow sensors including the SCSIs, flat cables and satellite
box.
 Also I put screws on them so that they won't become loose any more.
Entry  Tue May 3 13:22:13 2011, Leo, Update, SUS, Re: DRMI prep : suspension diagnostic 10x
Here are the free-swinging spectra for the BS, ETMX, ETMY, ITMX, ITMY, MC1, MC2, MC3, and PRM chambers.  Kiwamu left the suspensions free for 5
hours this weekend, starting at Sat Apr 30 00:15:26 2011.
This is GPS time 988 182 941.  Quick tip: you can do local to GPS time conversions using lalapps_tconvert, which is a lot like tconvert but
    Reply  Tue May 3 15:04:20 2011, kiwamu, Update, SUS, Re: DRMI prep : suspension diagnostic 
Jenne went through all the suspension racks and pushed all the connectors.
After pushing them, we had a quick look at those spectra and found no funny noise spectrum except for C1:PRM-SENSOR_UL.
    Reply  Wed May 4 13:57:04 2011, kiwamu, Update, SUS, mechanical resonances updated 
[Leo  w/ a little help from Kiwamu]
Leo summarized the mechanical resonances of all the suspensions, based on the free-swinging spectra taken
on Sat Apr 30.
Entry  Wed May 4 13:45:56 2011, kiwamu, Update, LSC, locking last night 
Last night I was trying to calibrate the MICH error signal and the actuators on BS and ITMs.
However I gave up taking the data because the MC locking was unstable. MC3 drifted a lot.
Entry  Wed May 4 12:07:48 2011, Suresh, Update, RF System, REFL55 installed on the AP table 
REFL55 has been installed on the AP table.  REFL11 has been moved to make space for a 50% beam splitter. The reflected
beam from this splitter is about 30% of the transmitted beam power.  The reflected beam goes to REFL11 in the current configuration.  The DC
levels are 1.2V on REFL 11 and 3.5V on the REFL55.
Entry  Tue May 3 18:46:06 2011, rana, Update, IOO, MC Locking not working Untitled.pngUntitled.png
I found that the MC autolocker was OFF. Kiwamu says he turned it off because its slow. Suresh says that he has some feelings that maybe something is
wrong. I'll let them describe what they know about the MC in an elog.
I checked the trend of the MC and PMC transmissions for the past 30 days:
    Reply  Wed May 4 11:48:01 2011, Suresh, Update, IOO, MC Locking not working 
[Valera, Suresh]
The first time I noticed that the MC was not locking was after I had finished switching the RF source installation. 
Before this change the RF modulation frequency (for MC) was 29.485 MHz as read from the Marconi RF Source.  We replaced this with a Wenzel crystal
Entry  Tue May 3 18:25:38 2011, kiwamu, Summary, LSC, PRMI locking : plan 
[Rana/Jamie/Kiwamu]
 Since we've got the PRMI locked we now should be able to do more qualitative measurements.
Here is a task list that we will measure/develop in the PRMI condition.
Entry  Mon May 2 21:14:55 2011, kiwamu, Update, Electronics, too loose Heliax connectors on 1Y2 rack DSC_2982_ss.jpgDSC_2984_ss.jpg
I found that all the Heliax cables landing on the bottom of 1Y2 were too loose.
Due to this loose connection the RF power at 55 MHz varies from -34 dBm
    Reply  Mon May 2 23:29:57 2011, Suresh, Update, Electronics, too loose Heliax connectors on 1Y2 rack 
The countersink gives rise to another problem when we mount the N-type-to-SMA bulkhead adaptor.  As we are making
a circular hole in the plastic strip (instead of a hole with two flat sections)  the adaptor is free to turn when we tighten it with a wrench. 
We currently hold the smooth circular part on the other side with a gripping pliers and while tightening.  If that part disappears into the countersink
    Reply  Tue May 3 17:19:25 2011, kiwamu, Update, Electronics, Heliax connectors on 1Y2 rack : tightened 
My observation wasn't accurate enough.
The looseness came from the fact that the N-SMA bulk heads were slipping on the black plate.
This is actually what Suresh pointed out (see here). So the thickness of the black plate
Entry  Mon May 2 12:51:52 2011, kiwamu, Update, LSC, PRMI locking : plan 
Today we will try to lock the PRMI.  Here is a plan for it.
(to be done in the daytime)
    Reply  Mon May 2 13:30:13 2011, kiwamu, Update, SUS, PRMI locking prep: PRM oplev 
I had a quick look at PRM optical lever.
The He-Ne beam is still successfully coming out from the chamber and I could guide it to the QPD by using steering mirrors.
But the beam size looks too big for the QPD. We should slide the lens which is standing before
    Reply  Mon May 2 18:16:24 2011, kiwamu, Update, LSC, PRMI locking : status update 
(done)
- AS55 RFPD
  With a help from Jamie the AS55 RFPD was installed.
    Reply  Tue May 3 03:53:20 2011, kiwamu, Update, LSC, PRMI locking : done PRMI_locking.png
The PRMI has been successfully locked 
       Reply  Tue May 3 16:47:55 2011, kiwamu, Update, LSC, PRMI locking : details APtable.png
Here are some details about the PRMI locking done last night.
 
(REFL11 installation)
Entry  Mon May 2 17:10:55 2011, steve, Update, SUS, PRM oplev 
The returning spot diameter on the qpd ~10 mm. In order to reduce the spot size I moved the f 1145 mm lens toward the PRM ~ 25 cm. The spot size was
reduced to ~8 mm, 3200 counts.
I'll try to find an other lens tomorrow.
    Reply  Tue May 3 16:20:13 2011, steve, Update, SUS, PRM & BS oplevs are ready P1070630.JPGP1070632.JPG


    
        
            Quote:
        
        
            

           The returning spot diameter on the qpd ~10 mm. In order to reduce the spot size I moved the f 1145 mm lens toward the PRM ~ 25 cm. The spot
Entry  Tue May 3 15:59:22 2011, steve, Frogs, Photos, X-mas comes early P1070634.JPG
The little red all terrain cargo wagon 40" x 18"  has just arrived on pneumatic wheels.
Model #29, 200 lbs max load at 26 PSI,  minimum age requirement 1.5 years
Entry  Tue May 3 15:48:26 2011, Larisa Thorne, Update, Electronics, laser temperature control LPF, final version! LPF100k.2.jpg
This is a continuation of this
 The low pass filter is finally acceptable, and its Bode graph is below (on a ~3Hz frequency span that shows the cutoff frequency is at 0.1Hz)
Entry  Tue May 3 14:35:44 2011, Larisa Thorne, Configuration, Electronics, Jenne-Seismometer LPF project SeisLPFdiagram.jpgseisLPF.Bose.jpg
 I was charge with making a Non-Inverting Op Amp Low Pass Feedback circuit for Jenne, which may somehow be integrated into a seismometer project
she's working on.
 
Entry  Tue May 3 05:32:04 2011, kiwamu, Update, LSC, daytime tasks 
Daytime tasks : 
 - PRM & BS oplev (Steve)
 - LSC binary outputs (Joe/Jamie)
    Reply  Tue May 3 10:21:25 2011, Koji, Update, LSC, daytime tasks 
I think the installation of the PD DC signals are quite important. What to do
1) Connect the DC signals to the right top whitening board (be aware that there may be the modification of the whitening circuit). 
2) Reconfigure the LSC model such that the DC signal is passed to the right channels (modify the left top part of the model)
    Reply  Tue May 3 11:49:03 2011, Koji, Update, LSC, daytime tasks 
Done. C1:PSL-PMC_PMCTRANSPD was improved from ~0.75 to 0.87.


    
        
            Quote:
        
        
            
Entry  Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered 
I temporarily turned off the power to the 1Y2 rack this morning while wiring in the binary output adapter board power (+/- 15V) into the cross connects.
The board is now powered and we can proceed to testing if can actually control the LSC whitening filters.
Entry  Tue May 3 10:41:35 2011, josephb, Update, CDS, Morning maintenance 
1) Filled in the C1SUS_BS_OLMATRIX properly so as to make the BS oplev work for Steve.
2) Turned on the ITMX damping.  Apparently it had tripped this morning, possibly due to work in the lab area.
3) The ETMX FE controller (c1scx) had ADC timed out and died sometime around 8:30 am.  The c1x01 (the IOP on the ETMX computer) was also indicating
Entry  Tue May 3 00:44:02 2011, Koji, Configuration, Computers, Martian WIreless Bridge 
The Martian wireless bridge has the ethernet cable inserted in the wrong connector.
It should be inserted to one of the four port. Not in the "INTERNET" connector.
Once the connector has been changed, the martian net as well as the internet became accessible from the laptops.
Entry  Wed Apr 27 18:14:48 2011, kiwamu, Update, LSC, preparation for DRMI locking : RF status RF_Work_Status.png

POX11 (see this entry) is now listed as REFL11 (on the very top row).
    Reply  Wed Apr 27 21:08:08 2011, rana, Update, LSC, AS11 AS11.png
I worked on AS_11 today. Its ready for its noise / optical gain calibrations.
I have left it on Suresh's desk.
    Reply  Mon May 2 15:53:27 2011, kiwamu, Update, LSC, PRMI locking prep : demodulation boards RF_Work_Status.png
I swapped the name of two demodulation boards (AS55 and REFL55).
Now the REFL11 and AS55 demodulation boards are ready to go for the PRMI locking. 
Entry  Mon May 2 13:43:05 2011, steve, Frogs, Photos, birthday boys P1070622.JPG
.....Happy.... Birthday.... to.... Joseph... and... Jamie...Happy....Birthday..... to.... You............sing with us........Happy Birthday.....to you
Entry  Sat Apr 30 00:15:26 2011, kiwamu, Update, SUS, DRMI prep : suspension diagnostic 
As a part of the DRMI preparation,
I leave all the suspensions free from the watchdogs for 5 hours from
now.
    Reply  Mon May 2 11:14:27 2011, kiwamu, Update, SUS, script : opticshutdown 
Just FYI.
There is a useful script for this particular job : shutting down all the suspensions and bringing it back to operation after 5 hrs.
It is called opticshudown, which resides in 
Entry  Thu Apr 28 22:38:38 2011, Aidan, Update, Green Locking, Electronics schematic for vertex beatbox Canvas_1.pngCanvas_2.png
 With some assistance from Kiwamu and Koji, I've drawn up the electronics design for the Beat Box for the vertex green locking. The Omingraffle
schematic is posted
on the Green Locking Wiki page. It's also attached below. Some final touches are necessary before we can Altium this up.
    Reply  Sat Apr 30 05:14:33 2011, Koji, Update, Green Locking, Electronics schematic for vertex beatbox freq_divider.png
- AC coupling for the comparator circuit of the green locking
In order to relieve the power consumption of the RF buffer, ac coupling circuits have been added.
The ac coupling before the buffer amp helps to relieve the power consumption in the chip. 
Entry  Fri Apr 29 18:24:05 2011, Suresh, Update, RF System, RF system: 1X2 Rack cabling P4290070.JPG
[Joe, Jamie, Suresh]
We have installed the IDE to SCSI adaptor module into the 1X2 rack and have connected the AA filter outputs to it.
Entry  Fri Apr 22 12:07:38 2011, josephb, steve, Update, CDS, Removed hanging D-sub to SCSI in 1X2 
Problem:
Way back, Jay had D-sub to SCSI adapters made to adapt our existing Sander box AA filters to the new SCSI based IO chassis. 
However, these did not fit inside the box.
At the time, we simply left the cards outside hanging, which was a hack and needed to be replaced.
    Reply  Fri Apr 29 14:36:36 2011, josephb, steve, Update, CDS, Removed hanging D-sub to SCSI in 1X5 P1070621.JPG


    
        
            Quote:
        
        
            

           Problem:
            Way back, Jay had D-sub to SCSI adapters made to adapt our existing Sander box AA filters to the new SCSI
Entry  Fri Apr 29 05:48:52 2011, kiwamu, Update, LSC, Y arm locked DSC_2978_ss.jpg
The Y arm has been locked with the IR beam. The purpose is to use the arm as an alignment reference for the input
PZTs.
Detail will be posted later. Here is a picture of ITMY suspension. You can see there is a beam spot in the middle of the test mass.
    Reply  Fri Apr 29 12:18:48 2011, kiwamu, Update, LSC, Y arm locked : details 
First of all, the conclusions / results from the exercise of the Y arm locking yesterday are:

   The
       Reply  Fri Apr 29 13:15:04 2011, kiwamu, Update, LSC, Y arm locked : details 
As far as I know, this button works only once after the launch of MEDM...


    
        
            Quote:
        
        
            
       Reply  Fri Apr 29 13:58:36 2011, rana, Update, LSC, Y arm locked : details 


    
        
            Quote:
        
        
            
             * Farfalla, a lab laptop, seems out of network.
Entry  Fri Apr 29 03:39:49 2011, Koji, Summary, LSC, Cavity lengths 
I tried the idea that the PRC can resonate f1 and f2 at the same time if the arm gives the reflection phase to f1 and f2 with the ratio of 1 vs 5.
The details are described on wiki. The point is this removes
all of the PRC/SRC/asymmetry mumbo jumbo.
Entry  Thu Apr 28 16:12:19 2011, josephb, jamie, Update, CDS, New CDS model SVN 
New SVN
We are now using the LIGO CDS SVN for storing our control models.
The SVN is at:
https://redoubt.ligo-wa.caltech.edu/websvn/
Entry  Thu Apr 28 06:46:30 2011, Suresh, Update, RF System, RF Source installed P4280064.JPG
RF Source box has been mounted in the 1X2 rack.  
    Reply  Thu Apr 28 15:31:36 2011, kiwamu, Update, IOO, MC PDH lock : readjustment of demodulation phase DSC_2975_ss.jpg
Since Suresh has installed the RF source box and changed the cable configuration somewhat,
 the demodulation phase for the MC locking became off by about 10 degree.
I changed the length of some cables and obtained a good demodulation phase by the same technique as Suresh
Entry  Thu Apr 28 12:25:11 2011, josephb, Update, CDS, Further adventures in Hyper-threading 
First, I disabled front end starts on boot up, and brought c1sus up.  I rebuilt the models for the c1sus computer so they had a new specific_cpu
numbers, making the assumption that 0-1 were one real core, 2-3 were another, etc.
Then I ran the startc1SYS scripts one by one to bring up the models.  Upon just loading the c1x02 on "core 2" (the IOP), I saw it
Entry  Thu Apr 28 10:53:50 2011, josephb, Update, CDS, Adventures in Hyper-threading 
What was done:
1) Turn off MC1, MC2, MC3, BS, ITMX, ITMY, PRM, SRM watchdogs.
2) Turn c1sus computer off (sudo shutdown now)
3) Go connect monitor and keyboard to c1sus.  Turn c1sus on.
Entry  Thu Apr 28 07:14:34 2011, Suresh, Update, RF System, RF Distribution box installed P4280066.JPG
RF Distribution box has been mounted in the 1Y2 rack and is ready for use.
 
Entry  Tue Apr 26 22:56:01 2011, kiwamu, Update, LSC, c1iscaux2 and c1iscaux restrated 
While checking whitening filters on the LSC rack, I found some epics controls for the whitening looked not working.
So I powered two crates off : the top one and the bottom one on 1Y3 rack.
These crates contain c1iscaux and c1iscaux2. Then powered them on. But it didn't solve the issue.
    Reply  Wed Apr 27 21:19:25 2011, kiwamu, Update, LSC, LSC whitening for PD1-4 Screenshot-1.png
On the back side of 1Y2 rack I found a cable, CAB-1X2-LSC_7, which is supposed to be connected to the whitening
filter was disconnected.
I plugged it back and confirmed that the whitening filter is under control of EPICS. 
Entry  Wed Apr 27 20:14:16 2011, Aidan, Summary, elog, Restarted with script ... 
 
Entry  Wed Apr 27 15:34:38 2011, kiwamu, Update, Electronics, AS55 demod board with new 90 deg splitter : healthy 

A new 90 deg splitter, PSCQ-2-51W, has been installed on another demod board called AS55.
It shows a reasonably close 90 degree separation between the I and Q signals at 55 MHz with various LO
    Reply  Wed Apr 27 17:38:01 2011, kiwamu, Update, Electronics, Re : AS55 demod board with new 90 deg splitter : healthy relativephase.pngIQamplitude.png

Figure.1  I-Q relative phase measurement as a function of LO power.
Entry  Tue Apr 26 22:56:35 2011, Zach, Update, elog, restarted 
 with script
Entry  Tue Apr 26 01:20:02 2011, rana, Update, Electronics, POX_11 debugging 
The performance plots for POX_11 in the
wiki are horrendous and the schematic is missing.
I opened up the box and found all
    Reply  Tue Apr 26 22:03:49 2011, rana, Update, Electronics, POX_11 debugging MM7.png
I used the Jenne AM laser to tune up the PD (used to be POX_11 but now is called REFL_11). In addition to the notch at 22 MHz, I have also put in a LC
notch at 5*f = 55.3 MHz. The transfer function below shows the RF OUT of the PD v. the drive to the laser. I didn't divide out by the 1811 because its
not on the EE bench.
Entry  Mon Apr 25 22:38:49 2011, kiwamu, Update, LSC, prepration for DRMI : Y arm flashing 
This week is going to be a recycled Michelson week.
As
a preparation I did several things today :
 1. Alignment of the Y arm
 2. Alignment of PRM
 3. Checking
of all the pick-off ports
 
Entry  Mon Apr 25 11:23:41 2011, Alastair, Bureaucracy, Computers, wiki? 119427.strip.gif
40m wiki seems to have been down for quite a while now but I can't see any info in the elog about it.  Is there some ongoing problem?
    Reply  Mon Apr 25 11:58:37 2011, Jamie, Bureaucracy, Computers, wiki? 


    
        
            Quote:
        
        
            
            40m wiki seems to have been down for quite a while now but I can't see any info in the elog about it.  Is there
       Reply  Mon Apr 25 12:55:19 2011, Jenne, Bureaucracy, Computers, wiki? 


    
        
            Quote:
        
        
            
            
            
    
       Reply  Mon Apr 25 12:55:35 2011, Alastair, Bureaucracy, Computers, wiki? 


    
        
            Quote:
        
        
            
            
            
    
Entry  Sun Apr 24 21:37:40 2011, kiwamu, Update, IOO, review of triple resonant EOM : model looks fine Input_impedance.pngEOMcircuitmodel.png
To design a new resonant EOM box I started reviewing the prototype that I've built.
 As a part of reviewing I checked an important thing that I haven't carefully done so far :
I compared the measured input impedance with that of predicted from a circuit model.
Entry  Fri Apr 15 12:17:39 2011, kiwamu, Update, LSC, 11MHz demod board : funny I-Q phase relativephase.png
During checking the 11MHz demod boards I found that the I-Q relative phase showed
funny LO power dependence.
It is now under investigation.
    Reply  Fri Apr 15 15:15:08 2011, kiwamu, Update, LSC, 11MHz demod board : 90 degree splitter 
[Rana, Koji, Kiwamu]
 Moreover the amplitude of the I and Q signals are highly unbalanced, depending on the LO power again.
This implies the coil for a 90 degree splitting won't work at 11 MHz since the coil is home made and used
       Reply  Sat Apr 16 02:00:14 2011, rana, Update, LSC, 11MHz demod board : 90 degree splitter 
One way to avoid some of the bad stuff in there is to take the 1 dBm input and amplify it to ~21 dBm before splitting and sending in to the Level 17
mixers.
One way to do this is by using the A3CP6025 from Teledyne-Cougar. Its
          Reply  Mon Apr 18 13:05:57 2011, kiwamu, Summary, LSC, demod board modification demod_board.png
Here is the idea how we upgrade the demodulation boards. 
Basically we go ahead with two steps as depicted in the cartoon diagram
below. 
             Reply  Mon Apr 18 14:11:44 2011, kiwamu, Update, LSC, RF status RF_Work_Status.png
 We will make them all green !!

 
             Reply  Thu Apr 21 21:24:41 2011, kiwamu, Update, LSC, demod board : new 90 deg splitter DSC_2949_ss.jpgDSC_2951.JPGDSC_2952_ss.jpg
A new 90 degree splitter, PSCQ-2-51W, has arrived today and I installed it on a demod board called AS11.
Results of the I-Q phase measurement with the new splitter will be reported soon.
 
                Reply  Thu Apr 21 21:46:22 2011, kiwamu, Update, LSC, demod board : new 90 deg splitter relativephase.png
A less LO power dependence on the relative phase was found. The new 90 deg splitter
works better.
                   Reply  Fri Apr 22 11:08:50 2011, kiwamu, Update, LSC, demod board AS11 : amplitude imbalance IQamplitude.png
Amplitude imbalance between I and Q in a demod board, AS11, with the new 90
deg splitter was measured.
It shows roughly 10% amplitude imbalance when the LO power is in a range
Entry  Fri Apr 22 09:25:43 2011, Suresh, Update, RF System, RF Source: Temperature sensor relocated P4220056.JPG
RF Amp operating temperature
Earlier measurement reported by Alberto in LIGO-T10004-61-v1 based on the LM34 temperature sensor were lower than that shown by placing a calibrated
thermocouple sensor directly on the heat sink by about 5deg C. The difference probably arose because the LM34 was located on a separate free-hanging copper
Entry  Fri Apr 22 02:10:53 2011, Zach, Update, elog, restarted 
Restarted the elog with the script.
Entry  Thu Apr 21 08:26:42 2011, steve, Update, PEM, PSL enclosure work today 
The east side window guides  will be replaced by one long U-channel. There will be drilling into 2x2 steel frame. It should be done by 2pm today
This should remove the jerking motion of windows hitting the individual guides.
    Reply  Thu Apr 21 15:20:46 2011, steve, Update, PEM, PSL enclosure work today P1070558.JPGP1070560.JPG


    
        
            Quote:
        
        
            

           The east side window guides  will be replaced by one long U-channel. There will be drilling into 2x2 steel frame. It should be done
Entry  Thu Apr 21 15:03:29 2011, steve, Update, Computers, juction board finds home P1070570.JPGP1070568.JPG
The anti aliasing box was opened up at the back to accommodate the junction board and the SCSI cable towards the ADC. Aluminum plate was attached to
the bottom to hold the strain relief clamp.
Three more hanging junction cards will be replaced in this manner.
Entry  Thu Apr 21 14:39:43 2011, steve, Update, RF System, new strain relieved N connectors at AP P1070562.JPGP1070564.JPG
New right angle PVC, 2 x 2 x  1/4" installed at the AP table to strain relief the 1/4" spiral corrugated RF coaxes.
Entry  Wed Apr 20 23:20:49 2011, jamie, Summary, Computers, installation of CDS tools on pianosa 
This is an overview of how I got (almost) all the CDS tools running on pianosa, the new Ubuntu 10.04 control room work station.
This is machine is experiment in minimizing the amount of custom configuration and source code compiling.  I am attempting to install as many tools
as possible from existing packages in
Entry  Wed Apr 20 22:29:07 2011, suresh, Update, RF System, Plan for LSC rack 1Y2_Rack_Layout.png
The suggested layout of the 1Y2 Rack is shown below.
To simplify the wiring, I have largely kept demod boards with the same same LO frequency close to each other. 
The Heliax cables land on the top and bottom of the of subracks.  These are currently flexible plastic sheets.  Steve has agreed to replace
Entry  Wed Mar 30 02:55:02 2011, Suresh, Configuration, Electronics, RF System : Status and Plans 
I have prepared several diagrams outlining the current state of the RF System.
These are uploaded into the svn40m here  and will be kept
uptodate as we complete various parts of the task.  These plans have taken into account
    Reply  Wed Apr 20 21:53:01 2011, Suresh, Configuration, RF System, RF system: Stray heliax cable rogue_cable_1.png
We found a stray unused heliax cable running from the LSC rack 1Y2  to a point between the cabinets 1X3 and 1X4.  This cable will need to be redirected
to the AS table in the new scheme.  
Entry  Wed Apr 20 20:42:55 2011, kiwamu, Update, VIDEO, today's video session DSC_2931_ss.jpgDSC_2938_ss.jpg
[Steve / Suresh / Kiwamu]
90 % of unused video cables have been removed.
Still a couple of video cables are floating around the video MUX. They will be removed in the next week's session.
Entry  Tue Apr 19 15:48:43 2011, josephb, Update, CDS, MEDM screens and Front Ends updated to new Matrices 
Problem:
The original matrix naming conventions for the front ends
was broken.  It used _11, _12,...,_1e, _1f, _110, _111 and so forth.  The code was changes to use _1_1, _1_2,...,_1_16,_1_17, and so on.
In addition the matrix of filter banks was modified to use the same naming convetion (instead of starting at zero,
    Reply  Tue Apr 19 17:34:02 2011, Koji, Update, CDS, MEDM screens and Front Ends updated to new Matrices 
Just a curiosity:
I just wonder how you have distingushed the difference between _111 and _111.
       Reply  Wed Apr 20 11:02:18 2011, josephb, Update, CDS, MEDM screens and Front Ends updated to new Matrices 
We simply didn't any matrices larger than 16x16.  If we had, than that matrix would not have worked properly since the beginning.




    
        
            Quote:
        
        
            
Entry  Mon Apr 18 21:09:45 2011, Jamie, Configuration, Computers, new control room machine: pianosa 
I've just installed the new control room machine: "pianosa".   It is a replacement for the old sun machine "op440m" [0].
Hardware:

    dual dual-core Intel Core i7-2600 CPU @ 3.40GH, hyperthreaded to provide 8 effective cores
    16G memory (4x 4G dimms)
    Reply  Mon Apr 18 21:14:53 2011, Jamie, Configuration, Computers, new control room machine: pianosa 
Also, op440m's Sun monitor did not work well with pianosa, so I'm lending pianosa my HP monitor until we can get a suitable replacement.
ELOG V3.1.3-