40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 106 of 170  Not logged in ELOG logo
   +  Reply  Wed May 4 13:57:04 2011, kiwamu, Update, SUS, mechanical resonances updated 
Entry  Wed May 4 13:45:56 2011, kiwamu, Update, LSC, locking last night 
Entry  Wed May 4 12:07:48 2011, Suresh, Update, RF System, REFL55 installed on the AP table 
   +  Reply  Wed May 4 11:48:01 2011, Suresh, Update, IOO, MC Locking not working 
Entry  Tue May 3 18:25:38 2011, kiwamu, Summary, LSC, PRMI locking : plan 
   +  Reply  Tue May 3 17:19:25 2011, kiwamu, Update, Electronics, Heliax connectors on 1Y2 rack : tightened 
   +  Reply  Tue May 3 16:47:55 2011, kiwamu, Update, LSC, PRMI locking : details APtable.png
   +  Reply  Tue May 3 16:20:13 2011, steve, Update, SUS, PRM & BS oplevs are ready P1070630.JPGP1070632.JPG
Entry  Tue May 3 15:59:22 2011, steve, Frogs, Photos, X-mas comes early P1070634.JPG
Entry  Tue May 3 15:48:26 2011, Larisa Thorne, Update, Electronics, laser temperature control LPF, final version! LPF100k.2.jpg
Entry  Tue May 3 14:35:44 2011, Larisa Thorne, Configuration, Electronics, Jenne-Seismometer LPF project SeisLPFdiagram.jpgseisLPF.Bose.jpg
   +  Reply  Tue May 3 11:49:03 2011, Koji, Update, LSC, daytime tasks 
Entry  Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered 
Entry  Tue May 3 10:41:35 2011, josephb, Update, CDS, Morning maintenance 
Entry  Tue May 3 00:44:02 2011, Koji, Configuration, Computers, Martian WIreless Bridge 
   +  Reply  Mon May 2 15:53:27 2011, kiwamu, Update, LSC, PRMI locking prep : demodulation boards RF_Work_Status.png
Entry  Mon May 2 13:43:05 2011, steve, Frogs, Photos, birthday boys P1070622.JPG
   +  Reply  Mon May 2 11:14:27 2011, kiwamu, Update, SUS, script : opticshutdown 
   +  Reply  Sat Apr 30 05:14:33 2011, Koji, Update, Green Locking, Electronics schematic for vertex beatbox freq_divider.png
Entry  Fri Apr 29 18:24:05 2011, Suresh, Update, RF System, RF system: 1X2 Rack cabling P4290070.JPG
   +  Reply  Fri Apr 29 14:36:36 2011, josephb, steve, Update, CDS, Removed hanging D-sub to SCSI in 1X5 P1070621.JPG
   +  Reply  Fri Apr 29 13:58:36 2011, rana, Update, LSC, Y arm locked : details 
Entry  Fri Apr 29 03:39:49 2011, Koji, Summary, LSC, Cavity lengths 
Entry  Thu Apr 28 16:12:19 2011, josephb, jamie, Update, CDS, New CDS model SVN 
   +  Reply  Thu Apr 28 15:31:36 2011, kiwamu, Update, IOO, MC PDH lock : readjustment of demodulation phase DSC_2975_ss.jpg
Entry  Thu Apr 28 12:25:11 2011, josephb, Update, CDS, Further adventures in Hyper-threading 
Entry  Thu Apr 28 10:53:50 2011, josephb, Update, CDS, Adventures in Hyper-threading 
Entry  Thu Apr 28 07:14:34 2011, Suresh, Update, RF System, RF Distribution box installed P4280066.JPG
   +  Reply  Wed Apr 27 21:19:25 2011, kiwamu, Update, LSC, LSC whitening for PD1-4 Screenshot-1.png
Entry  Wed Apr 27 20:14:16 2011, Aidan, Summary, elog, Restarted with script ... 
   +  Reply  Wed Apr 27 17:38:01 2011, kiwamu, Update, Electronics, Re : AS55 demod board with new 90 deg splitter : healthy relativephase.pngIQamplitude.png
Entry  Tue Apr 26 22:56:35 2011, Zach, Update, elog, restarted 
   +  Reply  Tue Apr 26 22:03:49 2011, rana, Update, Electronics, POX_11 debugging MM7.png
Entry  Mon Apr 25 22:38:49 2011, kiwamu, Update, LSC, prepration for DRMI : Y arm flashing 
   +  Reply  Mon Apr 25 12:55:35 2011, Alastair, Bureaucracy, Computers, wiki? 
Entry  Sun Apr 24 21:37:40 2011, kiwamu, Update, IOO, review of triple resonant EOM : model looks fine Input_impedance.pngEOMcircuitmodel.png
   +  Reply  Fri Apr 22 11:08:50 2011, kiwamu, Update, LSC, demod board AS11 : amplitude imbalance IQamplitude.png
Entry  Fri Apr 22 09:25:43 2011, Suresh, Update, RF System, RF Source: Temperature sensor relocated P4220056.JPG
Entry  Fri Apr 22 02:10:53 2011, Zach, Update, elog, restarted 
   +  Reply  Thu Apr 21 15:20:46 2011, steve, Update, PEM, PSL enclosure work today P1070558.JPGP1070560.JPG
Entry  Thu Apr 21 15:03:29 2011, steve, Update, Computers, juction board finds home P1070570.JPGP1070568.JPG
Entry  Thu Apr 21 14:39:43 2011, steve, Update, RF System, new strain relieved N connectors at AP P1070562.JPGP1070564.JPG
Entry  Wed Apr 20 23:20:49 2011, jamie, Summary, Computers, installation of CDS tools on pianosa 
Entry  Wed Apr 20 22:29:07 2011, suresh, Update, RF System, Plan for LSC rack 1Y2_Rack_Layout.png
   +  Reply  Wed Apr 20 21:53:01 2011, Suresh, Configuration, RF System, RF system: Stray heliax cable rogue_cable_1.png
Entry  Wed Apr 20 20:42:55 2011, kiwamu, Update, VIDEO, today's video session DSC_2931_ss.jpgDSC_2938_ss.jpg
   +  Reply  Wed Apr 20 11:02:18 2011, josephb, Update, CDS, MEDM screens and Front Ends updated to new Matrices 
   +  Reply  Mon Apr 18 21:14:53 2011, Jamie, Configuration, Computers, new control room machine: pianosa 
Entry  Mon Apr 18 17:47:41 2011, kiwamu, Configuration, LSC, LSC rack's ADC cabling LSCrack.png
   +  Reply  Fri Apr 15 22:57:38 2011, Aidan, Jamie, Configuration, LSC, AS PD and Camera installed 
ELOG V3.1.3-