Mon May 30 23:14:27 2011, valera, Update, ASC, Y arm initial alignment
|
Fri May 27 17:52:53 2011, steve, Update, LSC, LSC rack cables strain relieved & labeled
|
Tue May 17 22:50:00 2011, Jamie, Configuration, LSC, New digital lockin added to LSC model/screen  
|
Wed May 18 22:11:31 2011, rana, Configuration, LSC, New digital lockin added to LSC model/screen
|
Wed May 25 20:12:55 2011, Jamie, Configuration, LSC, New digital lockin added to LSC model/screen
|
Thu May 26 17:10:21 2011, Jamie, Configuration, LSC, New digital lockin added to LSC model/screen
|
Wed May 25 19:19:11 2011, Jamie, Configuration, CDS, !!!CHECK IN YOUR MODELS!!!
|
Wed May 25 19:03:59 2011, Jamie, Configuration, CDS, Update rtcds checkout of cds_user_apps with new top-level directory names.
|
Mon May 23 14:28:23 2011, kiwamu, Configuration, LSC, POY55 installed
|
Mon May 23 18:16:42 2011, Koji, Configuration, LSC, POY55 installed
|
Mon May 23 18:10:41 2011, kiwamu, Update, LSC, f2p filters on PRM : not good
|
Sat May 21 06:19:46 2011, kiwamu, Update, LSC, DRMI trial : no luck
|
Mon May 23 00:36:51 2011, kiwamu, Update, LSC, DRMI trial : sucess
|
Mon May 23 12:27:26 2011, kiwamu, Update, LSC, DRMI trial : details
|
Wed May 18 07:13:00 2011, Suresh, Update, RF System, Demod board measurements 
|
Fri May 20 05:41:22 2011, Suresh, Update, RF System, Demod board measurements
|
Fri May 20 03:29:04 2011, kiwamu, Update, CDS, Binary IO box on 1X5 : LEDs off
|
Fri May 20 03:01:17 2011, kiwamu, Update, LSC, locking status
|
Fri May 20 01:02:50 2011, loose connection hunter, Update, SUS, loose connection on ETMY rack
|
Thu May 19 19:41:17 2011, Suresh, Update, RF System, DAQ channel Assignments for RF PDs
|
Thu May 19 12:09:41 2011, josephb, Update, CDS, AA filter box pulled from 1X5, optic suspensions currently off
|
Thu May 19 17:53:03 2011, steve, Update, CDS, AA filter box modified at 1X5
|
Thu May 19 16:46:20 2011, kiwamu, Update, LSC, c1lsc model : input channels rearanged
|
Thu May 19 00:15:20 2011, Jenne, Update, elog, Restarted, Italian-style
|
Thu May 19 00:22:21 2011, rana, Update, elog, Restarted, Italian-style
|
Wed May 18 18:48:46 2011, kiwamu, Update, Electronics, identification of RFPD interface cables
|
Wed May 18 18:33:46 2011, Aidan, Update, elog, restarted elog with script
|
Fri May 13 23:04:58 2011, Suresh, Update, RF System, DC power supply on RF distribution box has been replaced.
|
Sat May 14 14:12:16 2011, Koji, Update, RF System, DC power supply on RF distribution box has been replaced.
|
Wed May 18 15:54:50 2011, Koji, Update, RF System, DC power supplies for the RF generation box in place
|
Wed May 18 17:06:39 2011, Suresh, Update, RF System, DC power supplies for the RF generation box in place
|
Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed
|
Wed May 18 16:52:23 2011, Suresh, Update, RF System, Cables for AS11 PD are in place
|
Thu May 12 23:50:10 2011, Suresh, Update, RF System, POY55_Demod board Hardware change completed
|
Wed May 18 07:18:15 2011, Suresh, Update, RF System, POY55_Demod board Hardware change completed
|
Tue May 17 19:38:32 2011, kiwamu, Update, SUS, wrong connection on 1X5 
|
Tue May 17 18:09:13 2011, Jamie, Kiwamu, Configuration, CDS, c1sus and c1auxey crashed, rebooted
|
Tue May 17 17:01:22 2011, jamie, Configuration, CDS, Update LSC channels from _DAQ to _DQ
|
Tue May 17 16:53:22 2011, kiwamu, Update, SUS, oplev sign was wrong on ETMY
|
Tue May 17 11:45:20 2011, Jamie, Configuration, CDS, purged non-c1 site files from rtcds checkout of cds_user_apps
|
Tue May 17 01:05:56 2011, kiwamu, Update, LSC, Asymmetry measurement prep : recentering works
|
Mon May 16 17:11:28 2011, steve, Update, Electronics, strain relieved 1X1
|
Mon May 16 15:46:05 2011, Koji, Update, General, optical layout viewable on the online version of autocad
|
Fri May 13 00:39:53 2011, valera, Update, ASS, c1ass update
|
Mon May 16 11:47:59 2011, kiwamu, Update, ASS, c1ass update part II
|
Thu May 12 05:25:26 2011, kiwamu, Update, IOO, IP_POS disconnected
|
Thu May 12 08:54:11 2011, steve, Update, IOO, IP_POS cable found
|
Thu May 12 18:21:19 2011, kiwamu, Update, IOO, welcome back IP_POS
|
Thu May 12 22:54:20 2011, rana, Update, DAQ, Input Beam Naming change (no more IP)
|
Sun May 15 14:01:56 2011, kiwamu, Update, IOO, wiring diagram for IP-POS
|
Mon May 16 11:14:36 2011, rana, Update, IOO, wiring diagram for IP-POS
|
Sun May 15 19:55:15 2011, kiwamu, Update, Photos, ETMY optical bench
|
Sun May 15 21:27:51 2011, Jenne, Update, Photos, ETMY optical bench
|
Mon May 16 10:05:02 2011, kiwamu, Update, Photos, Re:ETMY optical bench
|
Sun May 15 19:10:12 2011, kiwamu, Update, LSC, Calibration of actuators : BS, ITMX and ITMY 
|
Sun May 15 12:42:29 2011, kiwamu, Update, SUS, f2p ratio adjutment done for all the suspensions
|
Fri May 13 22:45:37 2011, Suresh, Update, RF System, The full set of 8 Demod boards is ready for testing
|
Fri May 13 14:54:20 2011, Leo Singer, Update, Computers, Diaggui fixed on pianosa
|
Fri May 13 01:51:56 2011, Suresh, Update, RF System, RF Status update 
|
Fri May 13 01:42:35 2011, kiwamu, Update, LSC, ready for Schnupp asymmetry measurement
|
Thu May 12 23:41:47 2011, rana, Update, CDS, MEDM Snapshots not working
|
Thu May 12 23:12:40 2011, kiwamu, Update, CDS, c1lsc crashed
|
Thu May 12 02:31:07 2011, Suresh, Update, RF System, installation of RF splitters in Demod boards
|
Thu May 12 10:27:02 2011, rana, Update, RF System, installation of RF splitters in Demod boards
|
Thu May 12 16:50:22 2011, Suresh, Update, RF System, installation of RF splitters in Demod boards
|
Thu May 12 09:00:23 2011, steve, Update, General, optical table covers must be used
|
Wed May 11 23:02:52 2011, valera, Update, ASS, Dither angular stabilizitaion system update
|
Wed May 11 22:54:53 2011, Jenne, Update, Treasure, ETMY trans QPD installed
|
Wed May 11 22:52:55 2011, kiwamu, Update, LSC, status update and plan
|
Tue May 10 23:14:01 2011, kiwamu, Update, SUS, ETMX_OPLEV : He-Ne laser dead ?
|
Wed May 11 11:05:45 2011, steve, Update, SUS, ETMX_OPLEV : He-Ne replaced
|
Wed May 11 21:58:30 2011, rana, Update, SUS, ETMX_OPLEV : He-Ne replaced
|
Wed May 11 17:20:24 2011, kiwamu, Configuration, IOO, loop diabled on PZT2
|
Wed May 11 10:49:16 2011, valera, Configuration, Electronics, MC3 LL PD has no signal
|
Wed May 11 17:10:04 2011, kiwamu, Configuration, Electronics, fixed : MC3 LL PD has no signal
|
Wed May 11 16:04:36 2011, Larisa Thorne, Configuration, Electronics, Jenne-Seismometer LPF project
|
Wed May 11 13:54:32 2011, steve, Update, LSC, LSC power supplies
|
|