40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 106 of 341  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  2685   Fri Mar 19 18:00:14 2010 jenneUpdatePEMGuralp2 centered again[Jenne, Sanjit]
It looks like Steve used a GND-12V
supply to power the Guralp through the little
  
  2686   Fri Mar 19 21:15:33 2010 ranaUpdatePEMGuralp2 centered againThis trend of the last 200 days shows that
GUR2 has been bad forever...until now anyways.
 Untitled.png 
  2687   Fri Mar 19 23:03:41 2010 ranaUpdatePEMGuralp2 centered againI went and double-checked and aligned the
styrofoam cooler at ~5:00 UTC. It was fine,
but we really need a better huddling box.
 huddlez.png 
  2689   Sun Mar 21 19:25:29 2010 ranaUpdatePEMGuralp2 centered againFrom this morning, now in calibrated units,
and with the Güralp self noise spec
from the Güralp manual.
 huddlez.png 
  2690   Sun Mar 21 20:08:20 2010 kiwamu, ranaUpdatePSLEOM wasit sizeWe
are going to set the waist size to 0.1 mm for
 waist.pngwaist.py.zip 
  2691   Sun Mar 21 21:02:39 2010 KojiUpdatePSLEOM waist sizeYou don't need a lengthy code for this. It
is obvious that the spot size at the distance
L is minimum when L =
  
  2694   Mon Mar 22 11:37:09 2010 steveUpdatePEMjackhammeringThere was more jackhammering this morning
just about 20 ft north-west of the beamsplitter
chamber, outside.
 jackhammering2.jpg 
  2696   Mon Mar 22 22:11:26 2010 MottUpdateABSLPLL reconstructed 
 It looks like the PLL drifted
alot over the weekend, and we couldn't get
 IMG_0150.JPG 
  2697   Mon Mar 22 23:37:32 2010 MottUpdateABSLPLL reconstructed 
We have managed to lock the PLL to
reasonable stability. The RF input is attenuated
 2010-03-22_23.14.00.jpg2010-03-22_23.24.50.jpg 
  2698   Tue Mar 23 00:31:51 2010 KojiUpdateIOOMC realignedThis is the first touch to the MC mirrors
after the earthquake on 16th.

    I made an aluminum access
 IMG_2346.jpgIMG_2347.jpg 
  2699   Tue Mar 23 09:37:36 2010 steveUpdateIOOvac envelope has to be sealed as antproof for overnight


   
        
            
 pc3.JPGpc4.JPG 
  2700   Tue Mar 23 09:55:20 2010 KojiUpdateIOOvac envelope has to be sealed as antproof for overnightRoger.

  
  2701   Tue Mar 23 10:11:13 2010 steveUpdatePEM small air cond unit failed yesterdayOld control room air condition failed yesterday
around noon. It was blowing 80-85F hot air
for about 2-3 hours at racks 1Y4-7 and the
 20datm.jpg 
  2702   Tue Mar 23 15:38:26 2010 AlbertoUpdateelogelog just restarted I found the elog down and I restarted it.
Then, after few seconds it was down
again. Maybe someone else was messing with
  
  2703   Tue Mar 23 18:44:46 2010 MottUpdateABSLPLL reconstructed 
 After realigning and getting
the lock today, I tried to add in the SR785
 NPRO_PLL_freqresp.png 
  2704   Tue Mar 23 22:46:43 2010 AlbertoUpdate40m UpgradingREFL11 upgradedI modified REFL11 according to the changes
lsited in this
schematic (see wiki  / Upgrade 09
 2010-03-23_REFL11_model_to_meas_comparison.png 
  2705   Wed Mar 24 02:06:24 2010 KojiUpdateIOOvac envelope has to be sealed as antproof for overnightMatt and Koji:
We closed the light doors of the
chambers.
  
  2706   Wed Mar 24 03:58:18 2010 kiwamu, matt, kojiUpdateGreen Lockingleave PLL lockedWe are leaving the PLL as it is locked
in order to see the long term stability.
And we will check the results in early morning
 DSC_1402.JPG 
  2707   Wed Mar 24 04:22:51 2010 kiwamu, mattUpdateGreen Lockingtwo NPRO PLL Now some pedestals, mirrors and lenses
are left on the PSL table, since we are on
the middle way to construct a PLL setup which
  
  2710   Wed Mar 24 14:52:02 2010 AlbertoUpdateGreen Lockingtwo NPRO PLL


   
        
            
  
  2711   Wed Mar 24 14:57:21 2010 AlbertoUpdate40m UpgradingREFL11 upgraded 
 Hartmut suggested a possible
explanation for the way the electronics transfer
  
  2712   Wed Mar 24 15:59:59 2010 kiwamu, mattUpdateGreen Lockingleave PLL lockedMatt checked it in this morning and he
found it's been locked during the night.
 
  
  2713   Thu Mar 25 09:07:08 2010 steveUpdatePEMGuralp2 x problem is back

    
        
 grlp2xproblm.jpg 
  2714   Thu Mar 25 17:29:48 2010 kiwamu, mottUpdateGreen LockingPLL two NPROsIn this afternoon, Mott and I tried to
find a beat note between two NPROs which
are going to be set onto each end table for
  
  2715   Thu Mar 25 17:32:42 2010 AlbertoUpdate40m UpgradingREFL55 UpgradedI upgraded the old REFL199 to the new REFL55.
To do that I had to replace the old
photodiode inside, switching to a 2mm one.
 2010-03-25_REFL55_model_to_meas_comparison.png2010-03-25_REFL55_model_to_meas_comparison.png 
  2716   Fri Mar 26 10:48:35 2010 steveUpdateSAFETYsafety glasses measuredSafety
glasses 1064 nm transmission measured at
~200 mW level. They are all good.
 P1060188.JPGP1060199.JPG 
  2717   Sat Mar 27 16:23:10 2010 KojiUpdateSUSanother SRM sidemagnet gluedKiwamu and Koji
Last night we have released PRM from
the gluing fixture. All of the six magnets
  
  2718   Sun Mar 28 17:28:26 2010 matt, kiwamuUpdateGreen Lockingfrequency discriminator for green PLLLast Friday, Matt made a frequency discriminator
circuit on a bread board in order
 6x 
  2719   Sun Mar 28 20:00:17 2010 ranaUpdateCamerasGigE camera no work from screenNot that this is an urgent concern, just
a data point which shows that it doesn't
just not work at the sites.
 Untitled.png 
  2727   Mon Mar 29 10:40:59 2010 josephbUpdateCamerasGigE camera no work from screen

    
        
  
  2728   Mon Mar 29 15:19:33 2010 mevansUpdateGreen Lockingfrequency discriminator for green PLLThanks for the great entry! 
In order to make this work for higher
frequencies, I would add  Hartmut's suggestion
  
  2731   Mon Mar 29 18:50:14 2010 KojiUpdateSUSPRM sidemagnet gluedPRM was released from the fixuture without
any trouble. This was the last magnet gluing
until ETMs are delivered.
 StatusTable.png 
  2737   Wed Mar 31 02:57:48 2010 kiwamuUpdateGreen Lockingfrequency counter for green PLLRana
found that we had a frequency counter SR620
which might be helpful for lock acquisition
 FCnoise.png 
  2739   Wed Mar 31 10:34:02 2010 josephbUpdateelogElog not responding this morningWhen I went to use the elog this morning,
it wasn't responding.  I killed the
process on nodus, and then restarted, per
  
  2741   Wed Mar 31 12:30:31 2010 ranaUpdateGreen Lockingfrequency counter for green PLLIts a good measurement - you should adjust
the input range of the 620 using the front
panel 'scale' buttons to see how the noise
  
  2742   Wed Mar 31 15:31:53 2010 steveUpdatePSLReference Cavity RF PD base upgraded


   
        
            
 brspdbs.JPG 
  2743   Wed Mar 31 16:31:44 2010 steveUpdatePEMGuralp interface box turned off

    
        
 grlpntrfcbxoff.jpg 
  2744   Wed Mar 31 16:55:05 2010 josephbUpdateComputers2 computers from Alex and Rolf brought to 40mI went over to Downs today and was able
to secure two 8 core machines, along with
mounting rails.  These are very thin
  
  2745   Wed Mar 31 19:29:58 2010 HartmutUpdateElectronics(1cm-) Si PD transfer functions updateRecorded transfer functions for the 1cm
Si-PD as described on p. 2708
for different biases. I put the plots
  
  2746   Thu Apr 1 00:43:33 2010 MottUpdateGeneralPZT response for the innolightKiwamu and I measure the PZT response of
the Innolight this evening from 24 kHz to
2MHz.  
 Innolight_Bode.png 
  2747   Thu Apr 1 07:17:15 2010 KojiUpdateGeneralPZT response for the innolightThe shape of the TF looks nice but the
calibration must be wrong.
Suppose 1/f slope with 10^-4 rad/V
  
  2748   Thu Apr 1 10:21:58 2010 MottUpdateGeneralPZT response for the innolight


   
        
            
 Innolight_Response.pngLightwave_response.png 
  2749   Thu Apr 1 10:47:48 2010 KojiUpdateGeneralPZT response for the innolightInnolight: 100rad/V @ 100kHz  =>
1e7/f rad/V => 10MHz/V
LWE: 500rad/V @ 100kHz => 
  
  2750   Thu Apr 1 12:07:22 2010 ranaUpdateGeneralPZT response for the innolightThe Lightwave NPRO   
  2751   Thu Apr 1 15:21:12 2010 ranaUpdateGreen Lockingfrequency counter for green PLL 
  
  2752   Thu Apr 1 16:34:29 2010 HartmutUpdateGreen LockingSilicon PDsjust a few infos on Silicon PDs I looked
up.
If you want to go beyond the 100MHz
  
  2753   Thu Apr 1 17:35:24 2010 KojiUpdateSUSWorking on ITMX/YSteve and Koji
- We removed old ITMX/Y from the
chambers. Now they are temporarily placed
 IMG_2353.jpg 
  2754   Thu Apr 1 18:05:29 2010 MottUpdateGeneralPZT response for the innolight 
 We realized that we had measured
the wrong calibration value; we were using
 Innolight_Response_calFix.pngLightwave_response_calFix.png 
  2755   Thu Apr 1 18:44:40 2010 KojiUpdateGeneralPZT response for the innolightInnolight 10 rad/V @ 100kHz => 1e6/f
rad/V => 1MHz/V
LWE 30 rad/V @ 100kHz => 3e6/f
  
  2756   Thu Apr 1 19:59:32 2010 MottUpdateGeneralPZT response for the innolight 
 We measured the Amplitude Modulation
response of the PZTs, to find regions with
 Innolight_AM_Response.pngInnolight_AM_PM.pngInnoVsLW_PM.pngInnolight_AM_Response.pngLightwave_AM_PM.png 
ELOG V3.1.3-