Thu Aug 18 22:24:08 2011, jamie, Omnistructure, VIDEO, Updated 'videoswitch' script
|
Thu Aug 18 15:54:35 2011, steve, Update, SUS, damped and undamped OSEMs 
|
Thu Aug 18 00:58:40 2011, jamie, Update, SUS, optics kicked and left free swinging
|
Thu Aug 18 12:22:37 2011, jamie, Update, SUS, suspension update 6x
|
Wed Aug 17 17:51:54 2011, Jenne, Update, Treasure, Prepared for drag wiping
|
Thu Aug 18 10:59:04 2011, steve, Update, Treasure, Prepared for drag wiping
|
Thu Aug 18 10:17:04 2011, kiwamu, steve, Update, SUS, oplevs reestablished at Vertex
|
Thu Aug 18 00:53:48 2011, jamie, kiwamu, suresh, jenne, Update, General, PUMP PLAN ABORTED; need to work more on IFO alignment
|
Wed Aug 17 20:14:49 2011, jamie, kiwamu, suresh, jenne, keiko, anamaria, Update, General, in-vacuum work status, prep for pump
|
Wed Aug 17 06:42:38 2011, kiwamu, Update, General, in-vac work : the end is near
|
Wed Aug 17 15:55:01 2011, Jenne, Update, General, in-vac work : the end is near
|
Tue Aug 9 01:35:45 2011, Suresh, Update, SUS, ETMX Side Sensor slow channel down for a long time 
|
Wed Aug 17 15:47:18 2011, Anamaria, Update, SUS, ETMX Side Sensor slow channel down for a long time
|
Wed Aug 17 12:14:27 2011, Josh Smith, Omnistructure, Computer Scripts / Programs, 40m summary page plans
|
Wed Aug 17 03:10:06 2011, kiwamu, Update, General, current status of in-vac work
|
Tue Aug 16 16:59:20 2011, Anamaria, Update, RF System, AM in the PM
|
Wed Aug 17 02:48:56 2011, kiwamu, Update, RF System, Re: AM in the PM
|
Tue Aug 16 04:28:09 2011, kiwamu, Update, General, today's work to do
|
Tue Aug 16 11:49:17 2011, jamie, jenne, Update, General, today's work to do
|
Tue Aug 16 17:09:55 2011, Jenne, Update, General, today's work to do
|
Tue Aug 16 10:59:06 2011, jamie, Update, SUS, SUS update 6x
|
Tue Aug 16 04:50:17 2011, kiwamu, Update, SUS, free swinging again
|
Tue Aug 16 04:25:34 2011, Suresh, Kiwamu, Update, SUS, alignment of MC output to Y-arm using PZTs
|
Mon Aug 15 21:43:29 2011, Anamaria and Keiko, Summary, Locking, central part ifo locking project
|
Mon Aug 15 17:38:07 2011, jamie, Update, General, Foil aperture placed in front of ETMY
|
Mon Aug 15 17:23:55 2011, jamie, Update, SUS, freeswing script updated
|
Mon Aug 15 10:58:52 2011, kiwamu, Update, IOO, MC misaligned a lot
|
Mon Aug 15 14:07:39 2011, kiwamu, Update, IOO, Re: MC misaligned a lot
|
Fri Aug 12 17:37:11 2011, Jenne, Update, SUS, ETMY hopefully good again
|
Fri Aug 12 20:28:13 2011, Jenne, Update, SUS, ETMY hopefully good again
|
Sat Aug 13 02:31:42 2011, kiwamu, Update, SUS, Re: ETMY hopefully good again
|
Mon Aug 15 13:16:50 2011, Jenne, Update, SUS, Re: ETMY hopefully good again
|
Mon Aug 15 10:02:27 2011, kiwamu, Update, SUS, BS OSEM adjustment done
|
Sun Aug 14 22:48:37 2011, kiwamu, Update, SUS, free swinging again
|
Sun Aug 14 20:04:40 2011, Keiko, Anamaria, Jenne, and Kiwamu, Summary, Locking, central part ifo locking plan
|
Sun Aug 14 19:06:50 2011, Jenne, Update, elog, elog dead. Brought back to life
|
Sat Aug 13 15:40:38 2011, Nicole, Summary, SUS, TT Shaking Today and Hopefully More?
|
Sun Aug 14 17:47:39 2011, Nicole, Summary, SUS, TT Shaking Today and Hopefully More?
|
Sun Aug 14 04:12:37 2011, Jenny, Update, PSL, Temperature steps and slow actuator railing 
|
Sun Aug 14 15:37:39 2011, Jenny, Update, PSL, Temperature steps and slow actuator railing
|
Sat Aug 13 15:47:47 2011, Nicole, Summary, SUS, TT Optimization Curves  
|
Sat Aug 13 19:08:01 2011, Koji, Summary, SUS, TT Optimization Curves
|
Sat Aug 13 21:15:47 2011, Nicole, Summary, SUS, TT Optimization Curves
|
Sat Aug 13 21:48:17 2011, Koji, Summary, SUS, TT Optimization Curves
|
Sun Aug 14 00:26:51 2011, Nicole, Summary, SUS, TT Optimization Curves
|
Sun Aug 14 13:57:52 2011, Nicole, Summary, SUS, TT Optimization Curves
|
Sat Aug 13 02:11:33 2011, kiwamu, Update, SUS, free swinging again
|
Fri Aug 12 03:52:51 2011, kiwamu, Update, SUS, PRM OSEM adjustment
|
Sat Aug 13 01:54:18 2011, kiwamu, Update, SUS, PRM OSEM adjustment part II 
|
Sat Aug 13 01:52:07 2011, Yoichi, Update, LSC, Feed forward delay 
|
Fri Aug 12 03:49:45 2011, Jenny, Summary, PSL, NPRO PDH-Locked to Ref Cav   
|
Fri Aug 12 20:33:57 2011, Dmass, Summary, PSL, NPRO PDH-Locked to Ref Cav
|
Fri Aug 12 17:27:49 2011, Yoichi, Summary, CDS, Toggle button for RCG
|
Fri Aug 12 17:05:22 2011, Manuel, Ishwita, Configuration, PEM, STS2 Cable configuration
|
Fri Aug 12 16:50:37 2011, Yoichi, Configuration, CDS, FE Status screen rearranged
|
Fri Aug 12 16:42:51 2011, Yoichi, Configuration, LSC, LSC Feed Forward Compensator 
|
Fri Aug 12 15:46:51 2011, Jenne, Update, SUS, Earthquake stop procedure
|
Thu Aug 11 16:09:05 2011, Nicole, Summary, SUS, Bode Plot for TT Suspension 6x
|
Fri Aug 12 14:15:07 2011, Nicole, Summary, SUS, Bode Plot for TT Suspension
|
Fri Aug 12 15:34:16 2011, Nicole, Summary, SUS, Bode Plot for TT Suspension 
|
Fri Aug 12 15:16:56 2011, jamie, Update, SUS, today's SUS overview  
|
Fri Aug 12 11:07:50 2011, Nicole, Summary, SUS, More TT Shaking Completed This Morning
|
Fri Aug 12 04:11:13 2011, kiwamu, Update, SUS, free swinging
|
Thu Aug 11 13:41:36 2011, Ishwita, Manuel, Update, PEM, Coherence of Guralp1 and STS2(Bacardi, Serial NR 100151) 
|
Fri Aug 12 00:18:30 2011, Ishwita, Manuel, Update, PEM, Coherence of Guralp1 and STS2(Bacardi, Serial NR 100151) 
|
Thu Aug 11 19:14:22 2011, Ishwita , Manuel, Update, PEM, Seismometer STS2(Bacardi, Serial NR 100151) moved near ETMX 
|
Thu Aug 11 19:01:45 2011, Suresh, Update, SUS, ITMX given a kick to start it freeswing' but to no avail.
|
Thu Aug 11 18:30:40 2011, Koji, Update, SUS, ITMY OSEM adjustment
|
Tue Aug 9 02:27:54 2011, Ishwita , Manuel, Update, PEM, Power spectra and Coherence of Guralps and STS2    
|
Thu Aug 11 16:21:16 2011, Ishwita , Manuel, Update, PEM, Power spectra and Coherence of Guralps and STS2
|
Wed Aug 10 14:27:39 2011, Ishwita , Manuel, Update, PEM, Calibration of Guralp and STS2
|
Wed Aug 10 14:35:39 2011, rana, Update, PEM, Calibration of Guralp and STS2
|
Wed Aug 10 15:17:39 2011, Ishwita, Manuel, Update, PEM, Calibration of Guralp and STS2
|
Thu Aug 11 09:39:25 2011, Ishwita, Manuel, Update, PEM, Calibration of Guralp and STS2
|
Thu Aug 11 11:50:56 2011, Manuel , Ishwita, Update, PEM, Calibration of Guralp and STS2
|
Thu Aug 11 16:15:59 2011, Ishwita, Manuel, Update, PEM, Calibration of Guralp and STS2
|
Thu Aug 11 16:07:37 2011, steve, Update, SUS, ETMY rack cables strain releived 
|
Thu Aug 11 12:31:39 2011, Nicole, Summary, SUS, Photosensor Head Calibration Curve for TT Frame
|
Thu Aug 11 14:22:00 2011, Nicole, Summary, SUS, Photosensor Head Calibration Curve for TT Frame
|
Thu Aug 11 14:32:12 2011, Koji, Summary, SUS, Photosensor Head Calibration Curve for TT Frame
|
Thu Aug 11 04:45:07 2011, Suresh, Update, IOO, Aligning the 1064nm beam with the in-vacuum pzt's
|
Thu Aug 11 12:54:06 2011, kiwamu, Update, IOO, MC spot positions
|
|