Mon Mar 8 12:01:02 2021, Paco, Anchal, Summary, training, Investigate how-to XARM locking
|
[Paco, Anchal]
- Started zoom stream; thanks to whoever installed it!
- Spent some time trying to understand how anything we did last thursday lead to the sensing matrix change, but still cannot figure it out. |
Mon Mar 8 12:40:35 2021, gautam, Summary, training, Investigate how-to XARM locking
|
For the arm locking, the "Restore Xarm (XARM POX)" script from the "IFO_CONFIGURE" MEDM screen should get you there (I just checked
it and it works fine). It is worth getting a hang of the PDH signal chain (read what the script is doing and map it to the signal chain) so you get a feel
for where there may be offsets, saturations, what the trigger logic is etc. The LSC overview screen is supposed to be pretty intuitive (if you think it |
Fri Mar 12 11:44:53 2021, Paco, Anchal, Update, training, IMC SUS diagonalization in progress
|
[Paco, Anchal]
- Today we spent the morning shift debugging SUS input matrix diagonalization. MC stayed locked for most of the 4 hours we were here, and we
didn't really touch any controls. |
Mon Mar 15 08:55:45 2021, Paco, Anchal, Summary, training,   
|
[Paco, Anchal]
Found IMC locked upon arrival.
Since "allegra" was set up as an additional workstation, we tried using it but discovered
the monitor ist kaput. For the sake of debugging, we tested VGA and DVI inputs and even the monitor lying around (also labeled "allegra") |
Thu May 18 15:20:29 2017, jigyasa, Summary, telescope design, Telescope Design for the Gig-E cameras 6x
|
With the objective of designing a telescope system for the Gig-E, a system of two lenses is implemented. A rough schematic of the telescope system
is attached. Variables in the system include the focal lengths of the two spherical lenses(f1, f2), distance between the lenses(t), distance between the
test mass and the lens combination(u), distance between the other lens and the sensor(v). Also the size of the object to be desired ranges from 3’’ |
Mon May 22 10:15:14 2017, jigyasa, Summary, telescope design, Lens tubes and object distances
|
Since the f numbers of the lenses in the proposed design with biconvex lenses are a little less than 5 and the conjugate
ratio(that is the ratio of object to image distance) is greater than 5, I explored the use of plano convex lenses, but with the same focal lengths, the
accessible u-v range is restricted with the planoconvex rather than biconvex lenses. |
Mon May 22 15:01:41 2017, jigyasa, Update, telescope design, Updated Telescope design with 1'' eye piece
|
I examined the use of a single lens system for the available range of focal lengths, for the required magnification and
found that a focal length of at most 100 mm would be required to sufficiently cover the object distance range. This would greatly compromise with the f-number
and hence lead to a lot more spherical aberrations. |
Fri May 31 10:25:17 2013, steve, Update, safety, first aid kits refilled
|
Quote:
|
Tue Jun 4 10:47:57 2013, Steve, Update, safety, safety training
|
Our early bird surf student Gautem has received 40m specific basic safety training today. |
Thu Jun 6 16:33:19 2013, steve, Update, safety, updated laser inventory
|
Updated laser inventory and operator list. They are posted in the 40m wiki and entry doors of the 40m IFO room.
Let me know if this list needs correction.
Lightwave M126N-1064-700 NPRO sn 337 in the PSL enclosure got connected to local emergency shut off switch. This is a LIGO operational safety |
Tue Jun 25 10:23:20 2013, Steve, Update, safety, surf safety training
|
Alex Cole and Craig Cahillane received 40m specific, basic safety training last week.
|
Thu Jun 27 17:04:49 2013, Jenne, Update, safety, Nitrogen bottle too hot - overpressured
|
All of us in the control room / desk area heard a sudden whoosh of air a few minutes ago. It kind of sounded like a pressure washer or something.
We determined that the northmost nitrogen bottle outside the front door was letting out all its gas.
It's a gazillion degrees outside (okay, only 91F, according to a google of "Caltech Weather"), and those bottles are in direct sun all |
Wed Jul 31 09:51:43 2013, Steve, Update, safety, Sujan receives safety training
|
Sujan got 40m specific basic safety training this morning. |
Mon Aug 19 09:54:13 2013, Steve, Update, safety, Masayuki receives safety training
|
Masayuki Nakano, a student of Seiji's from ICRR / U Tokyo, is visiting us here at the 40m lab for the next couple months.
He received 40m specific basic safety training this morning. |
Fri Aug 30 08:08:29 2013, steve, Update, safety, fire horns-flashers tested OK
|
We had fire alarm tests and evacuation drills at 1:30pm yesterday. All flashers and horns are functioning unbearably loud and bright
including clean assembly room. |
Thu Oct 10 08:25:07 2013, Steve, Update, safety, Chris received safety training
|
Chris Couste, our new undergrad help received 40m specific, basic safety training yesterday. |
Fri Feb 14 12:39:02 2014, Jenne, Update, safety, Smoke detector cleaned
|
Facilities just came by and cleaned the smoke detector that is above Steve's desk. It's next to an air vent, so I guess it collects dust more than
a "typical" smoke detector. |
Wed Feb 19 08:07:01 2014, steve, Update, safety, annual laser safety glasses check 
|
All 40m laser safety glasses are cleaned and measured this morning. Bring
your own safety glasses if you have to enter the 40m IFO room. |
Tue Feb 25 16:54:57 2014, steve, Update, safety, safety audit 2014
|
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed
correction will be posted tomorrow. |
Thu Feb 27 13:11:13 2014, steve, Update, safety, safety audit correction 
|
Quote:
|
Thu Mar 13 16:05:48 2014, steve, Update, safety, safety audit 2014
|
Quote:
|
Mon Mar 17 10:50:58 2014, steve, Update, safety, 2014 annual crane certification
|
Quote:
|
Mon Apr 28 17:27:29 2014, steve, Update, safety, safety audit 2014
|
Quote:
|
Tue Apr 29 00:11:03 2014, steve, Update, safety, safety audit 2014
|
Be aware that this may affect POP QPD and POP RF Thorlabs PD
Quote:
|
Fri May 2 08:15:54 2014, steve, Update, safety, safety audit 2014
|
Late adition: CHECK all viewport covers.
A, transparent Lexan sheet is protecting glass windows in a horizontal position |
Wed May 21 13:51:19 2014, Steve, Update, safety, scope battery recall
|
Tektronix RECALL on TDS3000 or TDS300B oscilloscope BATTERIES
TDS3BATB
This Lithium-Ion battery can be a fire hazard ! Remove battery pack and recycle it through Safety Office |
Mon Jun 9 09:41:06 2014, steve, Update, safety, safety training
|
2014 surf students Nichin and Akhil received 40m specific basic safety training last week. |
Thu Jun 19 10:39:22 2014, steve, Update, safety, surf safety training
|
Andres Medina and Andrew "Harry" Hall received 40m specific safety training. They did general safety already and their laser safety
training will be this after noon. |
Thu Jun 19 14:12:45 2014, steve, Update, safety, optical table scans
|
PSL, AP, ETMY and ETMX optical tables were scanned for stay beam. |
Mon Jul 7 14:38:55 2014, Steve, Update, safety, safety training
|
TaraV - geology major undergrad - of Jenne's summer help
received 40m specific basic safety training. |
Tue Jul 15 11:04:05 2014, Steve, Update, safety, safety glasses must be worn all times!
|
This is the third safety glasses that I found laying around in the IFO lab lately. Safety glasses must be worn ALL
times in the IFO room!
This rule is essential for your protection! Please do not enter if you can not put up with this regulation! |
Tue Sep 9 09:19:21 2014, Steve, Update, safety, response to fried Sorensen  
|
Quote:
|
Fri Nov 14 15:26:45 2014, Steve, Update, safety, Diego gets safety traning
|
Diego Bersanetti received 40m specific safety training today. |
Thu Dec 11 15:40:04 2014, Steve, Update, safety, safety training
|
Katherine Dooley has received 40m specific basic safety training in the 40m lab |
Wed Feb 25 14:35:32 2015, Steve, Update, safety, safety audit 2015
|
Safety audit went soothly. We thank all participients.
Correction list:
1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type. |
Fri Feb 27 14:17:51 2015, Steve, Update, safety, safety audit 2015
|
Safety glasses were measured and they are all good. I'd like to measure your personal glass if it is not on this picture.
Quote:
Safety audit went soothly. |
Tue Mar 3 11:38:11 2015, Steve, Update, safety, professional crane inspection
|
Quote:
Safety glasses were measured |
Thu Jun 25 15:07:50 2015, Steve, Update, safety, Surfs Safety 2015
|
Jessica Pena, Megan Kelly, Eve Chase and Ignacio Magana received 40m specific basic safety traning today. |
Fri Jul 24 13:49:09 2015, Steve, Update, safety, Lock doors please !
|
Thursday morning I found the control room emergency exit not locked.
Please check the doors when leaving the lab , specially when you are the last one out. |
Tue Jul 28 15:05:09 2015, Steve, Update, safety, fire alarm test ? no
|
We just had fire alarm trigged avacuation of the 40m lab.
It turned out that the CES building second floor sensor caused this action. |
Tue Aug 25 16:39:06 2015, Steve, Update, safety, safety training
|
Alessandra Marrocchesi received 40m specific basic safety training yesteday. |
Fri Oct 2 15:33:09 2015, Steve, Update, safety, safety training
|
Gautom has received 40m specific basic safety training today. |
Wed Nov 4 08:04:53 2015, Steve, Update, safety, safety training
|
Yutaro Enamoto, visiting graduate student of Seiji received 40m specific basic safety training.
|
Tue Jan 5 15:48:16 2016, Steve, Update, safety, Rat trap locations    
|
Please look around when working close to these five locations. Use flashlights or leave lights on.
These mechanial traps are HAZARDOUS !
No visitors or tours till Monday, Jan 11 2016 |
Tue Jan 5 17:19:57 2016, rana, Update, safety, Rat trap locations
|
In the modern times, people use glue traps to catch rats instead of springs. They are less hazardous to people and don't spread rat fluid on the
floor. |
Thu Feb 4 10:19:05 2016, Steve, Update, safety, fire marshal inspection
|
Pasadena fire marshal inspected the lab today. No violation was found. |
Wed Feb 24 10:27:23 2016, Steve, Update, safety, safety audit 2016
|
Safety audit went smothly.
Crane inspection is scheduled for March 4
Safety glasses will be measured before April 1 |
Wed Mar 2 10:09:28 2016, Steve, Update, safety, professional crane inspection
|
The crane inspection is scheduled for this coming Friday from 8-12
|
Thu Mar 3 10:19:20 2016, Steve, Update, safety, safety audit 2016
|
Bob cleaned the safety glasses. They were sonicated in warm 2% Liquinox water for 10 minutes. Steve checked them by transmission measurement
of 1064 nm at 150 mW
|
Fri Mar 4 11:07:10 2016, Steve, Update, safety, crane inspection completes 2016 safey audit
|
All 3 cranes inspected by professional and load tested with 450 lbs at max reach.
|