  40m Log, Page 1 of 168  Not logged in ELOG logo
Entry  Wed May 25 16:56:44 2022, Paco, Configuration, BHD, IFO recovery - IMC alignment 
    Reply  Wed May 25 17:34:47 2022, yuta, Configuration, BHD, IFO recovery - IFO alignment Screenshot_2022-05-25_17-47-57.png
       Reply  Thu May 26 19:55:43 2022, yuta, Configuration, BHD, Oplevs centered, BHD DCPDs are now online elog_1Y2.JPGelog_BHD.JPGelog_box.JPGScreenshot_2022-05-26_17-37-27_IFOaligned_OplevCentered.pngScreenshot_2022-05-26_20-35-02.png
Entry  Thu May 26 15:55:10 2022, Tommy, Update, Electronics, RFSoC Power Spectrum 
Entry  Tue May 24 11:04:53 2022, JC, Update, VAC, Beginning Pumpdown PUMPDOWN-2022-05-24_16-57-59.pngC1VAC_Screenshot_2022-05-24_16-59-27.png
    Reply  Wed May 25 16:38:27 2022, yuta, Update, SUS, Suspensions quick health check Screenshot_2022-05-25_16-46-13.pngOSEMcheck.JPG
Entry  Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
    Reply  Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking 
       Reply  Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing IFO_XY_ARMS_Flashing.png
          Reply  Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber snnp_pr2_pr3_itmy_aligment.png
             Reply  Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised 
                Reply  Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment IFO_aligment_Y_locking_on.png
                Reply  Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected 
                   Reply  Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table IMG_20220509_184439943.jpgIMG_20220509_184154722.jpg
                      Reply  Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table IMG_0741.jpegIMG_0753.jpeg
                         Reply  Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path 
                   Reply  Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD 
       Reply  Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed 
    Reply  Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment AS.JPGOMCchamber.JPG
       Reply  Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table signal-2022-05-12-201844.jpeg
          Reply  Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation POY.JPG
       Reply  Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table REFLPOP.JPGPOPAS.JPG
          Reply  Mon May 16 19:14:17 2022, Anchal, Update, BHD, Camera set on AS path and BHDBS output path 
             Reply  Tue May 17 18:43:38 2022, Anchal, Update, BHD, Placed SRM in ITMY Chamber 
                Reply  Wed May 18 08:30:29 2022, Paco, Update, BHD, SRM OpLev 
                   Reply  Thu May 19 08:51:40 2022, Paco, Update, BHD, SRM OpLev 
                Reply  Wed May 18 09:02:52 2022, Anchal, Update, BHD, WFS1 PD centered 
                Reply  Wed May 18 17:23:15 2022, Anchal, Update, BHD, Placed PRM in BS Chamber 
                   Reply  Thu May 19 18:56:08 2022, yuta, Update, BHD, Current OSEM sensor values with all the suspensions aligned OSEMS.txt
                   Reply  Thu May 19 19:05:59 2022, Anchal, Update, BHD, BS Chamber all work finished, BHD path setup 
                      Reply  Fri May 20 20:03:48 2022, Paco, Update, BHD, ITMY chamber work finished - LO and AS overlapped Screenshot_2022-05-20_20-38-25.pngOSEMs.txt
                         Reply  Mon May 23 13:16:59 2022, Paco, Update, BHD, End of vent - checks OSEMs20220523.txtScreenshot_2022-05-23_13-24-06_IFOaligned_GTRY_still_clipping_but_less.pngPR3position.JPG
                            Reply  Tue May 24 15:21:13 2022, Anchal, Update, BHD, Freeswing tests of new SOS started 
Entry  Tue Apr 12 09:05:21 2022, Jordan, Update, VAC, New Pressure Gauge Install/Pump Spool Vent 6x
    Reply  Wed Apr 13 12:50:07 2022, Tega, Update, VAC, New Pressure Gauge Install/Pump Spool Vent VAC_FRG_UPGRADE.png
       Reply  Thu Apr 21 16:36:56 2022, Tega, Update, VAC, cleanup work for vacuum git repo 
          Reply  Tue May 24 10:37:09 2022, Tega, Update, VAC, added FRG channels to slow channel ini file 
Entry  Fri May 20 12:42:23 2022, Tega, Update, VAC, Door installation on the end stations 
Entry  Thu Apr 7 11:47:22 2022, Yehonathan, Update, BHD, Initial BHD modeling: AS - LO mode matching 
    Reply  Thu Apr 7 21:15:04 2022, Yehonathan, Update, BHD, Initial BHD modeling: AS - LO mode matching 
       Reply  Mon May 16 16:13:01 2022, Yehonathan, Update, BHD, Initial BHD modeling: Damped suspension model Damped_SUS.pngETMY_SUSPOS_GOL.pdfSUS_Response.png
Entry  Mon May 16 14:46:35 2022, Tommy, Update, Electronics, RFSoC MTS Work 
Entry  Sat May 14 08:36:03 2022, Chris, Update, DAQ, DAQ troubleshooting 
    Reply  Mon May 16 10:49:01 2022, Anchal, Update, DAQ, DAQ troubleshooting 
       Reply  Mon May 16 12:59:27 2022, Chris, Update, DAQ, DAQ troubleshooting timeseries.pngerr.png
Entry  Fri May 13 14:26:00 2022, JC, Update, Alignment, LO2 Beam 
    Reply  Fri May 13 18:42:13 2022, Paco, Update, Alignment, ITMX and ITMY sat amp failures 
Entry  Thu May 12 13:46:59 2022, Jc, Update, Alignment, POP Beam IMG_0777.jpeg
    Reply  Thu May 12 17:20:08 2022, Paco, Update, Alignment, POP Beam on CCD PXL_20220513_002047233.jpg
Entry  Wed May 11 15:49:42 2022, JC, Update, OPLEV Tables, Green Beam OPLEV Alignment IMG_0770.jpeg
Entry  Mon May 9 22:19:06 2022, Koji, Update, BHD, BHD Platform Progress status Screenshot_2022-05-09_220220.pngScreenshot_2022-05-09_222405.png
    Reply  Mon May 9 23:18:44 2022, Koji, Update, BHD, BHD Platform Progress status 6x
Entry  Mon Sep 20 15:42:44 2021, Ian MacMillan, Summary, Computers, Quantization Code Summary 472px-Typical_State_Space_model.svg.pngBiquad_filter_DF-IIx.svg.pngSS-IIR-TF.pdf
    Reply  Wed Sep 22 14:22:35 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary IIR64-bitnoisespectrum.pdf
       Reply  Mon Sep 27 12:12:15 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary 
          Reply  Mon Sep 27 16:03:15 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary DeltaNoiseSpectrum.pdf
             Reply  Mon Sep 27 17:04:43 2021, rana, Summary, Computers, Quantization Noise Calculation Summary 
                Reply  Thu Sep 30 11:46:33 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary SS-IIR-Bode.pdfPSD_32bit.pdfPSD_64bit.pdf
                   Reply  Wed Nov 24 11:02:23 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary PSD_IIR_all.pdf
                      Reply  Wed Nov 24 13:44:19 2021, rana, Summary, Computers, Quantization Noise Calculation Summary 
                         Reply  Tue Dec 7 10:55:25 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary DF2_TS.pdfBIQ_TS.pdfScreen_Shot_2021-12-07_at_11.47.57_AM.pngPSD_COMP_BIQ_DF2.pdfPSD_COMP_SS_DF2.pdf
                            Reply  Fri Dec 10 13:02:47 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary G0900928-v1_(dragged).pdfPSD_COMP_BIQ_DF2.pdfInput_PSD.pdfInput_Filter.pdfQuantizationN.zip
                               Reply  Mon May 9 15:32:14 2022, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary SUS-ETMX_SUSYAW3_0.0.pdfLowNoiseBiquad2.pdfquant_noise_floor.pdf
Entry  Mon Apr 18 16:09:07 2022, Yehonathan, Update, BHD, BHD Readout simulation BHD_Simulink_Sketch.drawio.pdf
    Reply  Tue May 3 21:07:17 2022, Yehonathan, Update, BHD, BHD Readout simulation 
       Reply  Thu May 5 17:50:48 2022, Yehonathan, Update, BHD, BHD Readout simulation BHD_controls_40m_MICH.pdf
Entry  Tue Feb 1 15:33:28 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics Invac_opto_mechanics_v2.pdf
    Reply  Wed Feb 2 18:55:58 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics Screen_Shot_2022-02-02_at_6.46.46_PM.png
       Reply  Wed Feb 2 21:16:23 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics PXL_20220203_050156031.jpg
       Reply  Thu Apr 28 11:53:10 2022, Anchal, Summary, BHD, POP_SM4 and POP_SM5 Assembly 
          Reply  Tue May 3 14:02:09 2022, Anchal, Summary, BHD, Installed POP path in ITMX Chamber 
    Reply  Thu Apr 14 10:18:35 2022, Paco, Summary, BHD, 2 in oplev mirrors incompatible with LMR2V 
       Reply  Thu Apr 14 18:34:51 2022, Paco, Summary, BHD, ITMY Oplev reinstalled (Re: 2 in oplev mirrors incompatible with LMR2V) 
Entry  Fri Apr 29 08:34:40 2022, JC, Update, VAC, RGA Pump Down Screen_Shot_2022-04-29_at_8.46.53_AM.png
    Reply  Tue May 3 13:18:47 2022, JC, Update, VAC, RGA Pump Down 
Entry  Thu Apr 21 18:18:42 2022, yehonathan, Update, BHD, POX Alignment POX11_alignment.png
    Reply  Thu Apr 28 17:45:53 2022, Anchal, Update, BHD, POX Beam issues PXL_20220429_002703686.jpg
       Reply  Sat Apr 30 13:29:33 2022, Paco, Update, BHD, POX Beam issues --- fixed, ASL alignment on vertex chamber 
          Reply  Mon May 2 17:51:30 2022, Anchal, Update, BHD, POX Beam aligned on RFPD, YARM locked 
Entry  Wed Apr 27 10:05:55 2022, JC, Update, Coil Drivers, Coil Drivers Update 
    Reply  Mon May 2 13:30:52 2022, JC, Update, Coil Drivers, Coil Drivers Update 
Entry  Fri Apr 22 14:14:33 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement IMG_0572.jpegIMG_0573.jpeg
    Reply  Mon May 2 10:00:34 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement 
Entry  Wed Apr 27 16:28:57 2022, Anchal, Summary, BHD, BHD Upgrade - Retreiving arm cavity alignment 
    Reply  Thu Apr 28 09:12:18 2022, Anchal, Update, BHD, Restoring arm alignment 
       Reply  Thu Apr 28 18:07:04 2022, Anchal, Update, BHD, Restoring arm alignment at EOD 
Entry  Tue Apr 26 16:23:22 2022, Tommy, Update, Electronics, RFSoC2x2 MTS 
Entry  Mon Apr 25 18:00:03 2022, Ian MacMillan, Update, Upgrade, Cable supports update Chamber_Leg_Ribbon_Cable_Attachments.pdf
Entry  Thu Apr 21 10:35:23 2022, Koji, Update, CDS, DAQ seemed down 
    Reply  Mon Apr 25 17:24:06 2022, Anchal, Update, CDS, DAQ still down 
Entry  Tue Apr 19 18:10:10 2022, Paco, Update, BHD, Part V of BHR upgrade - POX11 path, LO path, and ITMX Oplev DJI_0167.JPGDJI_0169.JPGDJI_0168.JPG
    Reply  Wed Apr 20 08:20:22 2022, Paco, Update, BHD, Part V of BHR upgrade - PR2 weirdness 
       Reply  Wed Apr 20 18:50:03 2022, Koji, Update, BHD, Part V of BHR upgrade - PR2 weirdness Screenshot_2022-04-20_18-46-11.png
    Reply  Thu Apr 21 16:49:01 2022, Paco, Update, BHD, Part V of BHR upgrade - BS Oplev + LO1 offset 
       Reply  Thu Apr 21 18:42:47 2022, Tega, Update, BHD, Part V of BHR upgrade - Align LO and AS beams to BHD BS 
          Reply  Thu Apr 21 20:33:31 2022, Koji, Update, BHD, AS1 UR OSEM problem localized in the chamber Screenshot_from_2022-04-21_20-13-13.png
             Reply  Fri Apr 22 12:03:09 2022, Tega, Update, BHD, AS1 UR OSEM problem localized in the chamber 
                Reply  Fri Apr 22 12:15:08 2022, Anchal, Update, BHD, Cable post installation 
                   Reply  Mon Apr 25 16:57:57 2022, Anchal, Update, BHD, Cable post installation 
Entry  Mon Apr 25 14:19:51 2022, JC, Update, General, Nitrogen Tank 
    Reply  Mon Apr 25 14:49:02 2022, Koji, Update, General, Nitrogen Tank 
Entry  Sun Apr 24 13:17:08 2022, Tommy, Update, Electronics, New RFSoC2x2 Overlay 
Entry  Fri Apr 22 07:01:58 2022, Jc, Update, Coil Drivers, Adding Resistors and Reinstalling 8x
    Reply  Fri Apr 22 12:09:51 2022, Anchal, Update, Coil Drivers, Please update DCC pages 
Entry  Mon Apr 18 14:52:47 2022, Ian MacMillan, Summary, SEI, Seismic Study of Buildings and Caltech Campus 7x
    Reply  Thu Apr 21 17:32:35 2022, Ian MacMillan, Summary, SEI, Seismic Study of Buildings and Caltech Campus IMG_1820.jpgScreen_Shot_2022-04-21_at_5.52.51_PM.png
Entry  Wed Apr 20 16:11:08 2022, Koji, Update, SUS, Outpur resistors updated for LO1 coil drivers / for SR2, LO2, AS1, and AS4 in progress 6x
    Reply  Thu Apr 21 15:22:44 2022, Koji, Update, SUS, Outpur resistors updates for SR2, LO2, AS1, and AS4 done 
Entry  Thu Apr 21 11:31:35 2022, JC, Update, VAC, Gauges P3/P4 IMG_0560.jpegIMG_0561.jpeg
Entry  Tue Mar 1 16:01:14 2022, Paco, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga balun_adc1.pngPXL_20220302_001734121.jpg
    Reply  Thu Apr 7 20:33:42 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work 
    Reply  Fri Apr 8 16:03:58 2022, rana, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
       Reply  Wed Apr 20 14:56:06 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
Entry  Mon Apr 18 15:17:31 2022, Jancarlo, Update, General, Tool box and Work Station Organization 
    Reply  Mon Apr 18 23:22:39 2022, Koji, Update, General, Tool box and Work Station Organization PXL_20220419_062101907.jpg
Entry  Mon Oct 25 13:23:45 2021, Anchal, Summary, BHD, Before photos of BSC 
    Reply  Mon Oct 25 17:37:42 2021, Anchal, Summary, BHD, Part I of BHR upgrade - Removed optics from BSC rn_image_picker_lib_temp_44cb790a-c3b4-42aa-8907-2f9787a02acd.jpgrn_image_picker_lib_temp_0fd8f4fd-64ae-4ccd-8422-cfe929d4eeee.jpg
       Reply  Tue Oct 26 16:56:22 2021, Paco, Summary, BHD, Part I of BHR upgrade - Locked PMC and IMC 
          Reply  Wed Oct 27 16:27:16 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Prep OMCNorthBefore.jpegOMCNorthAfter.jpeg
             Reply  Wed Oct 27 16:31:35 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Removal of PR2 Small Suspension 
                Reply  Thu Oct 28 16:32:32 2021, Paco, Summary, BHD, Part IV of BHR upgrade - Removal of BSC eastern optics 
                   Reply  Fri Nov 5 12:21:16 2021, Anchal, Summary, BHD, Part VI of BHR upgrade - Removal of ITMYC optics XendFlowBenchLeftEnd.jpgXendFlowBenchMiddle.jpgXendFlowBenchRightEnd.jpg
                      Reply  Wed Dec 15 16:11:38 2021, Anchal, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 signal-2021-12-15-161437.jpeg
                         Reply  Wed Dec 15 17:44:18 2021, Koji, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 
                            Reply  Thu Jan 6 21:04:41 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO1 OSEMs inserted 
                               Reply  Mon Jan 10 14:52:51 2022, Anchal, Summary, BHD, LO1 OSEMs roughly calibrated and noise measured LO1_vs_ETMX_OSEM_Spectrum_LF_x30_Gain.pdfLO1_vs_ETMX_OSEM_Spectrum_HF_x30_Gain.pdf
                                  Reply  Mon Jan 10 18:36:41 2022, Anchal, Summary, BHD, LO1 free swinging test set to trigger 
                                     Reply  Tue Jan 11 12:19:12 2022, Anchal, Summary, BHD, LO1 Input Matrix Diagonalization performed. LO1_SUS_InpMat_Diagnolization.pdfLO1_FreeSwingData_PeakFitting.pdf
                               Reply  Mon Jan 24 18:53:09 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 placed and OSEMs tuned 
                                  Reply  Tue Jan 25 10:55:02 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 input matrix diagonalization performed. 
                                     Reply  Tue Jan 25 16:42:03 2022, Anchal, Summary, BHD, Reduced filter gains in all damped new SOS 
                         Reply  Thu Jan 6 11:54:20 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 
                            Reply  Fri Jan 7 16:17:42 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 filters 
                               Reply  Sat Jan 8 16:01:42 2022, Paco, Summary, BHD, Part IX of BHR upgrade - Placed LO2 filters 
                                  Reply  Tue Jan 18 14:26:09 2022, Paco, Summary, BHD, Part IX of BHR upgrade - Placed remaining filters SR2, PR3, PR2 
                               Reply  Tue Jan 11 18:18:29 2022, Anchal, Summary, BHD, Attempted OSEM installation on AS1 
                                  Reply  Tue Jan 11 18:40:25 2022, Anchal, Summary, BHD, AS1 Sat Amp has a PCB issue signal-2022-01-11-184917.jpeg
                                     Reply  Thu Jan 13 09:48:41 2022, Anchal, Summary, BHD, AS1 Sat Amp fixed signal-2022-01-13-094823_001.jpegsignal-2022-01-13-094823_002.jpeg
                                  Reply  Thu Jan 13 12:24:08 2022, Anchal, Summary, BHD, AS1 SD and LR magnets broke 
                                     Reply  Mon Jan 24 21:18:40 2022, Paco, Summary, BHD, Part IX of BHR upgrade - AS1 placed and OSEM tuned 
                                        Reply  Tue Jan 25 11:02:54 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test failed AS1_freeSwingTestFailed.pdf
                                           Reply  Thu Jan 27 08:27:34 2022, Paco, Summary, BHD, Part IX of BHR upgrade - AS1 inspection and correction 
                                              Reply  Wed Feb 2 16:32:02 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test still not good AS1_FreeSwingData_PeakFitting_20220125.pdfAS1_SUS_InpMat_Diagnolization_20220202.pdf
                                                 Reply  Tue Mar 15 18:42:37 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 resuspended and OSEMs tuned 
                                                    Reply  Tue Mar 15 18:45:12 2022, Anchal, Summary, BHD, Part X of BHR upgrade - BHDBS Path setup 
                            Reply  Thu Jan 13 12:29:27 2022, Anchal, Summary, BHD, AS4 LR magnet broke 
                               Reply  Fri Jan 14 18:12:47 2022, Anchal, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected 
                                  Reply  Tue Jan 18 18:19:22 2022, Koji, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected Screen_Shot_2022-01-18_at_17.48.16.pngcable_swap.png
                                     Reply  Wed Jan 19 12:56:52 2022, Paco, Summary, BHD, AS4 OSEMs installation 
                                        Reply  Thu Jan 20 16:42:55 2022, Paco, Update, BHD, AS4 OSEMs installation - part 2 
                                           Reply  Thu Jan 20 18:16:29 2022, Anchal, Update, BHD, AS4 set to trigger free swing test 
                                              Reply  Fri Jan 21 16:40:10 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  AS4_SUS_InpMat_Diagnolization_20220121.pdfAS4_FreeSwingData_PeakFitting_20220121.pdf
                                                 Reply  Mon Jan 24 17:12:27 2022, rana, Update, BHD, AS4 Input Matrix Diagonalization performed.  
                                                    Reply  Mon Jan 24 20:48:48 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  
                   Reply  Tue Jan 18 15:19:49 2022, Paco, Summary, BHD, Part IV of BHR upgrade - Replaced old SR3 with SOS SR2. OSEM tuning attemtped. PXL_20220119_012954365.jpgPXL_20220119_013003522.jpg
                      Reply  Tue Jan 18 18:16:28 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 Sat Amp Box inspection 
                         Reply  Wed Jan 19 12:50:10 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 OSEM tuning progress. 
                            Reply  Thu Jan 20 17:03:36 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 OSEM tuned. DJI_0144.JPG
                               Reply  Thu Jan 20 18:41:55 2022, Anchal, Summary, BHD, SR2 set to trigger free swing test 
                                  Reply  Fri Jan 21 11:24:42 2022, Anchal, Summary, BHD, SR2 Input Matrix Diagonalization performed.  SR2_SUS_InpMat_Diagnolization_20220121.pdfSR2_FreeSwingData_PeakFitting_20220121.pdf
                Reply  Thu Oct 28 17:01:54 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Adding temp fixed flat mirror for PR2 
                Reply  Thu Jan 27 17:57:35 2022, Anchal, Summary, BHD, Part III of BHR upgrade - Replaced small suspended PR3 with new SOS PR3 and OSEM tuning 
                   Reply  Thu Jan 27 18:03:36 2022, Paco, Summary, BHD, Part III of BHR upgrade - Install PR2, balance, and attempt OSEM tuning 
                      Reply  Thu Jan 27 20:46:38 2022, Koji, Summary, BHD, Part III of BHR upgrade - Install PR2, balance, and attempt OSEM tuning Screen_Shot_2022-01-27_at_20.33.56.pngScreen_Shot_2022-01-27_at_21.30.16.png
                         Reply  Fri Jan 28 10:37:59 2022, Paco, Summary, BHD, Part III of BHR upgrade - PR2 OSEM finalized, reinsall LO1 OSEMs 
                            Reply  Fri Jan 28 11:30:52 2022, Koji, Summary, BHD, Part III of BHR upgrade - PR2 OSEM finalized, reinsall LO1 OSEMs 
                               Reply  Fri Jan 28 16:35:18 2022, Anchal, Summary, BHD, AS1, PR2 and PR3 set to trigger free swing test 
                            Reply  Wed Feb 2 16:22:00 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR2 inpute matrix diagonalized PR2_FreeSwingData_PeakFitting_20220125.pdfPR2_SUS_InpMat_Diagnolization_20220202.pdf
                   Reply  Wed Feb 2 16:27:57 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR3 inpute matrix diagonalized PR3_FreeSwingData_PeakFitting_20220125.pdfPR3_SUS_InpMat_Diagnolization_20220202.pdf
             Reply  Wed Oct 27 16:38:02 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
                Reply  Wed Oct 27 18:11:37 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
                Reply  Wed Oct 27 18:16:45 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
             Reply  Thu Mar 17 17:23:22 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment 
                Reply  Mon Mar 21 18:24:07 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                   Reply  Thu Mar 24 19:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                      Reply  Fri Mar 25 18:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                         Reply  Sat Mar 26 13:04:38 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
                            Reply  Thu Mar 31 18:58:16 2022, Ian MacMillan, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
                               Reply  Tue Apr 5 18:15:06 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
                                  Reply  Wed Apr 6 01:20:48 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm PXL_20220406_060846581.jpgPXL_20220406_014205726.jpgPXL_20220406_060324812.jpgPXL_20220406_015259326.jpg
                                     Reply  Wed Apr 6 22:51:47 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm PXL_20220406_213356237.MP.jpgPXL_20220406_212936502.MP.jpg
                                  Reply  Wed Apr 6 12:03:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
                                     Reply  Thu Apr 7 17:59:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
                                        Reply  Fri Apr 8 17:21:31 2022, Ian MacMillan, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
                                           Reply  Mon Apr 11 21:13:21 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
                                              Reply  Mon Apr 11 21:44:14 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging D990543A1.PDFPXL_20220412_023941730.jpgPXL_20220412_023950567.jpg
                                                 Reply  Thu Apr 14 11:52:57 2022, yehonathan, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging Screenshot_2022-04-14_15-53-39.pngPXL_20220414_220616875.jpg
                                                    Reply  Thu Apr 14 18:39:13 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
                                                       Reply  Mon Apr 18 17:53:45 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
Entry  Fri Apr 15 11:59:16 2022, Yehonathan, Update, IOO, IMC completely misaligned 
Entry  Thu Apr 14 09:04:30 2022, Jordan, Update, VAC, RGA Volume RGA Scans 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG
Entry  Wed Apr 13 15:57:25 2022, Ian MacMillan, Update, Cameras, Camera Battery Test 
    Reply  Wed Apr 13 18:55:54 2022, Koji, Update, Cameras, Camera Battery Test 
Entry  Wed Apr 13 16:23:54 2022, Ian MacMillan, Update, General, Smell in 40m 
Entry  Mon Apr 11 11:00:30 2022, Jancarlo, Update, VAC, C1VAC Reboot and Nitrogen tanks 
Entry  Thu Apr 7 20:41:15 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Gain Plotter Screen_Shot_2022-04-07_at_8.40.23_PM.pngUnknown-3.pngUnknown-4.png
Entry  Thu Apr 7 20:37:06 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Simple Tone Generator 
Entry  Wed Sep 29 17:10:09 2021, Anchal, Summary, CDS, c1teststand problems summary c1teststand_issues_summary.pdf
    Reply  Thu Sep 30 14:09:37 2021, Anchal, Summary, CDS, New way to ssh into c1teststand 
       Reply  Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured 
    Reply  Mon Oct 4 11:05:44 2021, Anchal, Summary, CDS, c1teststand problems summary 
       Reply  Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary 
          Reply  Tue Oct 5 17:58:52 2021, Anchal, Summary, CDS, c1teststand problems summary 
       Reply  Tue Oct 5 18:00:53 2021, Anchal, Summary, CDS, c1teststand time synchronization working now 
          Reply  Mon Oct 11 17:31:25 2021, Anchal, Summary, CDS, Fixed mounting of mx devices in fb. daqd_dc is running now. 
             Reply  Mon Oct 11 18:29:35 2021, Anchal, Summary, CDS, Moving forward? 
                Reply  Tue Oct 12 17:20:12 2021, Anchal, Summary, CDS, Connected c1sus2 to martian network 
                   Reply  Tue Oct 12 23:42:56 2021, Koji, Summary, CDS, Connected c1sus2 to martian network 
                      Reply  Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good! CDS_screens_running.png
                         Reply  Tue Oct 19 18:20:33 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test data3_Plots.pdfdata2_Plots.pdf
                            Reply  Tue Oct 19 23:43:09 2021, Koji, Summary, CDS, c1sus2 DAC to ADC test P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg
                               Reply  Wed Oct 20 11:48:27 2021, Anchal, Summary, CDS, Power supple configured correctly. 
                               Reply  Tue Oct 26 18:24:00 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test data2_Plots.pdfdata3_Plots.pdf
                         Reply  Wed Dec 22 17:40:22 2021, Anchal, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs 
                            Reply  Wed Dec 29 20:09:40 2021, rana, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs 
                            Reply  Fri Mar 4 11:04:34 2022, Anchal, Summary, CDS, c1susaux2 system setup and running 40mBHD_C1SUSAUX2_Acromag_Chassis.pdf
                               Reply  Mon Mar 7 19:38:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls issues 
                               Reply  Mon Mar 14 12:20:05 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis installed BHD_WatchDogs.png40mBHD_C1SUSAUX2_Acromag_Chassis.pdf
                                  Reply  Thu Mar 17 19:12:44 2022, Anchal, Summary, CDS, c1auxey1 slow controls acromag chassis installed, not powered 
                                     Reply  Fri Mar 18 18:39:13 2022, Yehonathan, Summary, CDS, c1auxey1 slow controls acromag chassis installed, powered 
                                        Reply  Fri Mar 18 19:10:51 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues 
                                           Reply  Mon Mar 21 18:42:06 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues 
                                  Reply  Mon Apr 4 17:03:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis fixed and installed Screenshot_2022-04-04_17-03-26.png
                            Reply  Tue Mar 15 11:52:34 2022, Anchal, Summary, CDS, c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card c1su2.pdf
                               Reply  Tue Mar 15 14:10:41 2022, Anchal, Summary, CDS, c1su2 model remade, reinstalled, restarted after the update 
             Reply  Tue Oct 12 17:10:56 2021, Anchal, Summary, CDS, Some more information 
Entry  Wed Mar 9 11:52:18 2022, Yehonathan, Update, BHD, Simplified BHD readout sketch on ITMY table ITMY_Table_Sketch.drawio.pdf
    Reply  Wed Mar 9 12:57:52 2022, Koji, Update, BHD, Simplified BHD readout sketch on ITMY table 
    Reply  Fri Apr 1 14:26:50 2022, Tega, Update, Optical Levers, Simplified sketch on MC table MC_Table.drawio.pdf
       Reply  Fri Apr 1 17:02:02 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
          Reply  Fri Apr 1 22:22:29 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
             Reply  Mon Apr 4 15:49:06 2022, Tega, Update, Optical Levers, Simplified sketch on BS table BS_Table.drawio.pdf
Entry  Wed Oct 20 11:16:21 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber PXL_20211020_183728734.jpg
    Reply  Thu Oct 21 11:41:31 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber ParticleCountData20211021.pdf
       Reply  Thu Oct 21 15:22:35 2021, rana, Summary, PEM, Particle counter setup near BS Chamber 
    Reply  Thu Oct 21 15:24:35 2021, rana, Summary, PEM, Particle counter setup near BS Chamber 
       Reply  Fri Oct 22 17:35:08 2021, Ian MacMillan, Summary, PEM, Particle counter setup near BS Chamber 
          Reply  Fri Apr 1 14:26:19 2022, Ian MacMillan, Summary, PEM, Particle counter setup near BS Chamber IMG_1407.jpg
             Reply  Sat Apr 2 15:46:13 2022, rana, Summary, PEM, Particle counter setup near BS Chamber 
Entry  Tue Mar 29 17:35:54 2022, Paco, Update, SUS, Damping fix on BS, AS4, PR2, and PR3 
Entry  Tue Mar 29 15:07:11 2022, Tega, Summary, VAC, Opening of MC and ETM chambers 
Entry  Tue Feb 22 18:47:51 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement ALL_TF_Graph.pdf20220222_SUSElectronicsReplacement.7z
    Reply  Fri Feb 25 14:00:08 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement IMG_0853.jpgIMG_0852.jpg
       Reply  Fri Feb 25 14:48:53 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement Before.jpgAfter.jpg
          Reply  Sat Feb 26 23:48:14 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement PXL_20220226_023111179_2.jpg
             Reply  Mon Feb 28 15:51:07 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement IMG_0865.jpgIMG_0867.jpgIMG_0868.jpgIMG_0866.jpg
                Reply  Thu Mar 3 04:11:36 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement PXL_20220303_082726693.jpgPXL_20220303_082752494.jpgPXL_20220303_082744464.jpg
                   Reply  Thu Mar 3 04:24:23 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement PXL_20220303_094421604.jpgPXL_20220303_094435127.jpg
                      Reply  Thu Mar 3 17:21:11 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement 
                         Reply  Sat Mar 5 02:03:46 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement 6x
                            Reply  Mon Mar 21 14:22:52 2022, Anchal, Update, SUS, ETMY Alignmnet offsets needed to be changed 
       Reply  Tue Mar 1 19:26:24 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement PXL_20220302_025723651.jpgPXL_20220302_030102033.MP.jpg
    Reply  Mon Mar 7 16:44:15 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 6x
       Reply  Fri Mar 11 16:43:03 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 
          Reply  Fri Mar 25 11:39:14 2022, Anchal, Update, SUS, ETMY SUS Electronics Replacement - Questions 
             Reply  Mon Mar 28 16:25:34 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement - Questions 
    Reply  Thu Mar 17 11:40:41 2022, Paco, Update, SUS, ETMY green PZT HV supply 
Entry  Thu Mar 17 16:50:53 2022, Paco, Update, BHD, XARM AUX alignment 
    Reply  Fri Mar 18 17:15:19 2022, Paco, Update, BHD, XARM AUX alignment cont. Screen_Shot_2022-03-18_at_4.09.38_PM.png
       Reply  Mon Mar 21 18:00:05 2022, Ian MacMillan, Update, BHD, XARM AUX alignment cont. PXL_20220322_015247138.jpg
Entry  Tue Mar 15 13:49:44 2022, Ian MacMillan, Bureaucracy, Treasure, New Screwdriver Bits 
Entry  Tue Mar 15 10:45:31 2022, Paco, Update, General, Assembled small in-vac optics 