ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
17978
|
Tue Nov 14 18:30:45 2023 |
Radhika | Update | General | Beam spot position measurements after in-chamber alignment | [Murtaza, Paco, Radhika]
After the input beam path alignment
was complete (arm flashing recovered), we |
 |
17979
|
Wed Nov 15 15:49:34 2023 |
JC | Update | Daily Progress | Input Chamber Door Removed | [Koji, Paco, JC]
The door of the Input |
|
17980
|
Wed Nov 15 17:37:17 2023 |
Koji | Update | SUS | PRM SUS UL PD not responding | Radhika reported that the PRM UL OSEM PD
is not responding. This PD has been identified
to have a shorting problem, but the short |
|
17981
|
Wed Nov 15 18:50:23 2023 |
Radhika | Update | General | REFL path bug hunting | [Paco, Vittoria, Radhika]
Yesterday and today I noticed that REFLDC/REFL |
 |
17982
|
Thu Nov 16 14:39:34 2023 |
JC | Update | BHD | Update on BHD Parts and Cleanroom Accomodations | Task Completed Today :
D2200122 Spacer Rings have
been machined and ready for C&B
The |
|
17983
|
Thu Nov 16 18:29:52 2023 |
Radhika | Update | General | REFL path bug hunting | Today Yuta and I opened the BS chamber
and found that the REFL beam was misaligned
in pitch and yaw [Attachment 1]. We steered |
   |
17984
|
Thu Nov 16 18:46:30 2023 |
Koji | Update | General | REFL path bug hunting | I took over the IFO after Radhika left.
She found the REFL beam earlier and the PRM
alignment offset for the refl beam on the |
|
17985
|
Fri Nov 17 13:06:27 2023 |
Koji | Update | BHD | BHD Platform Inventory | I went through the inventory list and the
parts in hand to figure out what
was still missing |
|
17986
|
Fri Nov 17 17:27:19 2023 |
Vittoria | Update | General | PRMI Flashing Recovered; PRM OPLEV Centered | [Yuta, Vittoria, Radhika]
PRMI flashing recovered; |
|
17987
|
Tue Nov 21 19:02:00 2023 |
Radhika | Update | General | All beam spot measurements after in-vacuum alignment work | [Yuta, Radhika]
PRY locked and PRM/PR2/PR3 |
    |
17988
|
Wed Nov 22 19:55:21 2023 |
Koji | Update | BHD | BHD Platform Inventory |
PDR1V rotation stage was found
2"
pedestal post x Qty 1 / top and bottom vent
holes machined -> to be C&Bed
2.5" |
|
17989
|
Sat Nov 25 19:41:27 2023 |
Koji | Update | General | Lab Temp | Vertex is extremely hot. I'm reluctant
to go into the HEPA with clean garbings....
It seems that it started about |
|
17990
|
Sun Nov 26 16:06:22 2023 |
Koji | Update | BHD | BHD/OMC table work | - Setup the fiber
protection and stray beam shields
- Replaced brand new wedged Y1-45P |
 |
17991
|
Tue Nov 28 02:01:38 2023 |
Koji | Update | BHD | OMC locked | The OMC was locked with Moku Pro.
Attachment 1: Electrical
setup. The RF part of the REFL PD signal |
9x |
17992
|
Tue Nov 28 11:56:06 2023 |
Radhika | Update | General | Vertex optics alignment OK | Horizontal beam centering
along XARM
I tried to improve |
  |
17993
|
Tue Nov 28 14:37:00 2023 |
Koji | Update | General | Lab Temp | Lab temperature trend for 20 and
400 days:
- The lab temp significantly raised |
 |
17994
|
Tue Nov 28 17:24:44 2023 |
Radhika | Update | General | LO/POP beams aligned | [Paco, Vittoria, Murtaza, Radhika]
LO/POP alignment
We |
7x |
17995
|
Tue Nov 28 18:28:10 2023 |
Koji | Update | BHD | BHD Optics Prep | Continued on the BHD Optics Prep:
The following mounts were prepared
(they are not 100% tightened yet) |
   |
17996
|
Tue Nov 28 19:47:22 2023 |
Radhika | Update | BHD | BHD Optics moved to BHD cleanroom | AS2/AS3/BHD BS/LO3/LO4
moved to BHD cleanroom
Attachment |
    |
17997
|
Wed Nov 29 12:53:25 2023 |
JC | Update | Frequency noise measurement | Spectrogram Using GWpy | I started using this new code that Rana
and I got from a random Git. It is for a
Live Specgram. I was finally able to get |
|
17998
|
Wed Nov 29 18:45:54 2023 |
Koji | Update | General | 40m BHD current status / plan | In-vac
alignment / clipping
[Done] SUSs aligned: TTs |
|
17999
|
Thu Nov 30 09:55:12 2023 |
JC | Update | General | Lab Temp | I made modifications to the thermostats
this morning in the lab:
X Arm |
|
18000
|
Thu Nov 30 13:22:43 2023 |
Koji | Update | General | Lab Temp | The attached was the 2 days trend
Maybe I said X and Y moxed up in
the meeting? The Yend A/C is the good one. |
|
18001
|
Thu Nov 30 14:25:42 2023 |
Radhika | Update | General | Lab Temp | YEND thermostat was restored from 67
°F ---> 69 °F. |
|
18002
|
Thu Nov 30 15:08:23 2023 |
Radhika | Summary | Electronics | PRM UL sensor counts normal | [Murtaza, Radhika]
PRM UL counts normal
We |
 |
18003
|
Thu Nov 30 17:35:37 2023 |
Koji | Update | General | Missing PEM signals -> fixed | I
saw FB1 was pushed into the rack
(Attachment 1). Thank you very much for the |
  |
18004
|
Fri Dec 1 02:16:39 2023 |
Koji | Update | BHD | BHD Optics moved to BHD cleanroom / More OMC locking |
AS3/LO3 were assembled (Attachment
1)
The BHD Platform extension
plate was attached to the platform. This |
8x |
18005
|
Fri Dec 1 08:38:32 2023 |
JC | Update | BHD | BHD Platform Parts | Productive
Day for C&B
Beam Dump
Bases (D1102371), PEEK Shims D1102372, Two |
 |
18006
|
Fri Dec 1 22:30:42 2023 |
Koji | Update | BHD | BHD Optics moved to BHD cleanroom / More OMC locking | I've finished more BHD optic mounts:
- Downstream HWP
- BHDBS |
|
18007
|
Mon Dec 4 14:56:01 2023 |
JC | Update | VAC | Vac Maintenance Work. | TP1
has been reinstalled and TP2 investigation
has begun
This morning, |
|
18008
|
Mon Dec 4 21:02:20 2023 |
Koji | Update | General | Lab Temp | Looks like the last setting change didn't
make any effect. |
|
18009
|
Tue Dec 5 00:58:25 2023 |
Koji | Update | BHD | Most of the BHD Optics populated / OMC mode matching / OMC servo actuator range | Populating
the BHD Optics
Mounted Thorlabs NB1-K14 |
7x |