40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 357 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Dateup Author Type Category Subject Text Attachments
  17978   Tue Nov 14 18:30:45 2023 RadhikaUpdateGeneralBeam spot position measurements after in-chamber alignment[Murtaza, Paco, Radhika]

After the input beam path alignment
was complete (arm flashing recovered), we
 vertical_miscentering_TMs_BS.pdfhorizontal_miscentering_TMs_BS.pdf 
  17979   Wed Nov 15 15:49:34 2023 JCUpdateDaily ProgressInput Chamber Door Removed[Koji, Paco, JC]

The door of the Input
  
  17980   Wed Nov 15 17:37:17 2023 KojiUpdateSUSPRM SUS UL PD not respondingRadhika reported that the PRM UL OSEM PD
is not responding. This PD has been identified
to have a shorting problem, but the short
 PRM_ULSEN.png 
  17981   Wed Nov 15 18:50:23 2023 RadhikaUpdateGeneralREFL path bug hunting[Paco, Vittoria, Radhika]

Yesterday and today I noticed that REFLDC/REFL
 REFL_no_light.pngREFLDC_history.png 
  17982   Thu Nov 16 14:39:34 2023 JCUpdateBHDUpdate on BHD Parts and Cleanroom AccomodationsTask Completed Today :


D2200122 Spacer Rings have
been machined and ready for C&B
The
 IMG_0710.jpeg 
  17983   Thu Nov 16 18:29:52 2023 RadhikaUpdateGeneralREFL path bug huntingToday Yuta and I opened the BS chamber
and found that the REFL beam was misaligned
in pitch and yaw [Attachment 1]. We steered
 IMG_6084.JPGIMG_6099.JPGIMG_6089.JPGIMG_6093.JPG 
  17984   Thu Nov 16 18:46:30 2023 KojiUpdateGeneralREFL path bug huntingI took over the IFO after Radhika left.
She found the REFL beam earlier and the PRM
alignment offset for the refl beam on the
  
  17985   Fri Nov 17 13:06:27 2023 KojiUpdateBHDBHD Platform InventoryI went through the inventory list and the
parts in hand to figure out what
was still missing
 E2200464_Parts_Required_for_the_40m_BHD_Platform_(D2100085)_-_Optical_Mounts_Inventory_11_14_2023-2.pdf 
  17986   Fri Nov 17 17:27:19 2023 VittoriaUpdateGeneralPRMI Flashing Recovered; PRM OPLEV Centered[Yuta, Vittoria, Radhika]

PRMI flashing recovered;
  
  17987   Tue Nov 21 19:02:00 2023 RadhikaUpdateGeneralAll beam spot measurements after in-vacuum alignment work[Yuta, Radhika]

PRY locked and PRM/PR2/PR3
 2023-11-21_PRY_lock.pngvertical_miscentering_PRs.pdfhorizontal_miscentering_PRs.pdfvertical_miscentering_TMs_BS.pdfhorizontal_miscentering_TMs_BS.pdf 
  17988   Wed Nov 22 19:55:21 2023 KojiUpdateBHDBHD Platform Inventory
PDR1V rotation stage was found
2"
pedestal post x Qty 1 / top and bottom vent
holes machined -> to be C&Bed
2.5"
 PXL_20231123_033041972.jpg 
  17989   Sat Nov 25 19:41:27 2023 KojiUpdateGeneralLab TempVertex is extremely hot. I'm reluctant
to go into the HEPA with clean garbings....

It seems that it started about
 Screen_Shot_2023-11-25_at_7.40.34_PM.png 
  17990   Sun Nov 26 16:06:22 2023 KojiUpdateBHDBHD/OMC table work- Setup the fiber
protection and stray beam shields
- Replaced brand new wedged Y1-45P
 Optical_setup.jpgOverall_setup.jpg 
  17991   Tue Nov 28 02:01:38 2023 KojiUpdateBHDOMC lockedThe OMC was locked with Moku Pro.

Attachment 1: Electrical
setup. The RF part of the REFL PD signal
 9x 
  17992   Tue Nov 28 11:56:06 2023 RadhikaUpdateGeneralVertex optics alignment OKHorizontal beam centering
along XARM

I tried to improve
 IMC_alignment_2023-11-28.pngarm_alignment_2023-11-28.pngarm_alignment_final_2023-11-28.png 
  17993   Tue Nov 28 14:37:00 2023 KojiUpdateGeneralLab TempLab temperature trend for 20 and
400 days:

- The lab temp significantly raised
 Temp_trend_20days.pngTemp_trend_400days.png 
  17994   Tue Nov 28 17:24:44 2023 RadhikaUpdateGeneralLO/POP beams aligned[Paco, Vittoria, Murtaza, Radhika]

LO/POP alignment

We
 7x 
  17995   Tue Nov 28 18:28:10 2023 KojiUpdateBHDBHD Optics PrepContinued on the BHD Optics Prep:

The following mounts were prepared
(they are not 100% tightened yet)
 PXL_20231129_014120262.jpgPXL_20231129_012724025.jpgPXL_20231129_012936108.jpgPXL_20231129_015555304_2.jpg 
  17996   Tue Nov 28 19:47:22 2023 RadhikaUpdateBHDBHD Optics moved to BHD cleanroomAS2/AS3/BHD BS/LO3/LO4
moved to BHD cleanroom

Attachment
 ITMY_labeled.pngIMG_6183.JPGIMG_6180.JPGIMG_6181.JPGIMG_6179.JPG 
  17997   Wed Nov 29 12:53:25 2023 JCUpdateFrequency noise measurementSpectrogram Using GWpyI started using this new code that Rana
and I got from a random Git. It is for a
Live Specgram. I was finally able to get
 Screenshot_2023-11-29_at_3.45.04_PM.png 
  17998   Wed Nov 29 18:45:54 2023 KojiUpdateGeneral40m BHD current status / plan In-vac
alignment / clipping


[Done] SUSs aligned: TTs
  
  17999   Thu Nov 30 09:55:12 2023 JCUpdateGeneralLab TempI made modifications to the thermostats
this morning in the lab:

X Arm
  
  18000   Thu Nov 30 13:22:43 2023 KojiUpdateGeneralLab TempThe attached was the 2 days trend

Maybe I said X and Y moxed up in
the meeting? The Yend A/C is the good one.
 Screenshot_2023-11-30_at_13.22.25.png 
  18001   Thu Nov 30 14:25:42 2023 RadhikaUpdateGeneralLab TempYEND thermostat was restored from 67
°F ---> 69 °F.
  
  18002   Thu Nov 30 15:08:23 2023 RadhikaSummaryElectronicsPRM UL sensor counts normal[Murtaza, Radhika]

PRM UL counts normal

We
 IMG_6190.JPGIMG_6189.JPG 
  18003   Thu Nov 30 17:35:37 2023 KojiUpdateGeneralMissing PEM signals -> fixedI
saw FB1 was pushed into the rack
(Attachment 1). Thank you very much for the
 PXL_20231201_013117709.jpgPXL_20231201_013048563.jpgPXL_20231201_013557947.jpg 
  18004   Fri Dec 1 02:16:39 2023 KojiUpdateBHDBHD Optics moved to BHD cleanroom / More OMC locking
AS3/LO3 were assembled (Attachment
1)
The BHD Platform extension
plate was attached to the platform. This
 8x 
  18005   Fri Dec 1 08:38:32 2023 JCUpdateBHDBHD Platform PartsProductive
Day for C&B

Beam Dump
Bases (D1102371), PEEK Shims D1102372, Two
 IMG_7523.jpegIMG_7524.jpeg 
  18006   Fri Dec 1 22:30:42 2023 KojiUpdateBHDBHD Optics moved to BHD cleanroom / More OMC lockingI've finished more BHD optic mounts:
- Downstream HWP
- BHDBS
  
  18007   Mon Dec 4 14:56:01 2023 JCUpdateVACVac Maintenance Work.TP1
has been reinstalled and TP2 investigation
has begun

This morning,
  
  18008   Mon Dec 4 21:02:20 2023 KojiUpdateGeneralLab TempLooks like the last setting change didn't
make any effect.
 Screenshot_2023-12-05_04-55-39.png 
  18009   Tue Dec 5 00:58:25 2023 KojiUpdateBHDMost of the BHD Optics populated / OMC mode matching / OMC servo actuator rangePopulating
the BHD Optics


Mounted Thorlabs NB1-K14
 7x 
ELOG V3.1.3-