40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 1 of 355  Not logged in ELOG logo
IDdown Date Author Type Category Subject Text Attachments
  17882   Mon Oct 2 17:17:46 2023 PacoSummaryDAQYEND and XEND acromagI pulled out the YEND acromag chassis to
check how a connection is made. I unplugged
it and then opened it without removing any
  
  17881   Mon Oct 2 15:05:33 2023 VittoriaSummaryPSLPMC Alignment[Rana, Vittoria]

At 3 pm, we did some PMC alignment,
and the transmission value went from 665
  
  Draft   Thu Sep 28 16:45:54 2023 MurtazaUpdate IFO ALIGNED (WITH SOME ISSUES)[Rana, Radhika, Murtaza]

WFS Loop Debugging

-
  
  17879   Thu Sep 28 12:43:02 2023 RadhikaUpdate IFO ALIGNED (WITH SOME ISSUES)While aligning today I realized the cavAlign
step sizes and step factors had not been
updated after the upgrade.
  
  17878   Thu Sep 28 11:30:13 2023 yutaUpdateSUSChecking suspension damping loop polarity conventions To further homogenize the suspensions,
we did the following changes.

 - Turned on DECIMATION in
  
  17877   Thu Sep 28 11:27:24 2023 RadhikaUpdateSUSPRM/SRM damping/alignmentPRM/SRM OSEM input
calibration

- I realized
 PRM_damping_kick_2023-09-28.pngSRM_damping_kick_2023-09-28.png 
  17876   Wed Sep 27 21:11:36 2023 yutaUpdateSUSChecking suspension damping loop polarity conventions [Paco, Yuta]

We checked the polarity of suspension
 IMG_7498.JPG 
  17875   Wed Sep 27 14:01:11 2023 yutaUpdateSUSWhitening/dewhitening check at Yend[Paco, Yuta]

 We checked whitening and dewhitening
 Screenshot_2023-09-27_22-35-06_QPDs.pngc1scy_Screenshot_2023-09-27_13-53-28.pngafter_c1scy_Screenshot_2023-09-27_15-52-19.pngScreenshot_2023-09-27_22-55-42_BIO.pngIMG_7497.jpeg 
  17874   Tue Sep 26 14:07:00 2023 MurtazaUpdate IFO ALIGNED (WITH SOME ISSUES)[Paco, JC, Murtaza]

[WIP]

To fix the WFS loops, went through
  
  17873   Mon Sep 25 17:01:46 2023 MurtazaUpdate IFO ALIGNED (WITH SOME ISSUES)[JC, Paco, Radhika, Murtaza]

IFO ALIGNED

1.
  
  17872   Mon Sep 25 15:32:57 2023 JCUpdateIOOIMC Alignment After C1Sus2 Crash This Morning[Paco, Murtaza, JC]

Fixed C1SUS2 Crash from this morning

  
  17871   Fri Sep 22 19:38:06 2023 MurtazaSummaryElectronicsVertex Electronics CDS UpdatePRM
CHANNEL 1-4 (BS FEEDTHROUGH 1-3)
 IMG_9203.jpgIMG_9202.jpg 
  17870   Fri Sep 22 19:31:24 2023 KojiUpdateSUSFixed IMC/IFO alignment screensFixed IMC/IFO alignment screens  Screenshot_2023-09-23_02-28-42.pngScreenshot_2023-09-23_02-28-52.png 
  17869   Fri Sep 22 19:05:19 2023 KojiUpdateGeneralPower Outage Sept 21, 2023 ~9AMPumping configuration changed.
Now TP2 is backing TP1 and TP3 is pumping
annuli.
 Screenshot_2023-09-23_01-52-36.png 
  17868   Fri Sep 22 18:26:08 2023 RadhikaSummaryElectronicsVertex Electronics CDS Update[Koji, Radhika, Murtaza]

All upgraded suspensions
 PXL_20230923_003545536.jpgPXL_20230923_005555079.jpg 
  17867   Fri Sep 22 16:20:25 2023 RadhikaSummaryElectronicsVertex Electronics CDS UpdateToday we tried to debug the unreasonable
OSEM readings (see previous ELOG)

 IMG_9200.jpgIMG_9201.jpg 
  17866   Thu Sep 21 14:22:02 2023 RadhikaSummaryElectronicsVertex Electronics CDS UpdateI recalculated the scale factors between
OSEM sensor readings after/before the upgrade.
The expected factor is 8.64, although we
  
  17865   Thu Sep 21 12:02:25 2023 KojiUpdateGeneralPower Outage Sept 21, 2023 ~9AM[JC, Paco, Koji]

We had a power outage on Sept 21,
2023 at ~9AM. This is the third power outage
 Screenshot_2023-09-21_at_12.19.22.pngScreenshot_2023-09-21_at_12.18.25.png 
  17864   Wed Sep 20 18:18:38 2023 KojiSummaryElectronicsVertex Electronics Wed Plan[Koji, Murtaza, JC]

Regarding PRM/BS:


PRM2 cable and BS2 cable
  
  17863   Wed Sep 20 17:28:17 2023 RadhikaSummaryElectronicsre: Filter Coefficient Loading IssueI noticed the same issue today with C1RMS.txt,
when trying to update the coil actuation
gains for SRM. The filter changes were saved
  
  17862   Wed Sep 20 17:02:22 2023 RadhikaSummaryElectronicsVertex Electronics ~ change in the actuator calibration[Paco, Radhika]

IMC LOCKED

We
  
  17861   Wed Sep 20 14:04:58 2023 RadhikaSummaryElectronicsVertex Electronics ~ change in the actuator calibrationMC1/MC2/MC3 damping
restored

I tweaked
 MC1_damping_kick_2023-09-20.pngMC2_damping_kick_2023-09-20.pngMC3_damping_kick_2023-09-20.png 
  17860   Wed Sep 20 00:20:09 2023 KojiSummaryElectronicsVertex Electronics ~ change in the actuator calibrationI found the actuator calibration is more
complicated. The numbers I reported in the
previous elog was not correct.
  
  17859   Wed Sep 20 00:03:22 2023 KojiSummaryElectronicsre: Filter Coefficient Loading IssueI asked CDS mattermost for help. Chris
(Wipf) checked it and reported it is working
fine as usual (without fixing anything).
  
  17858   Tue Sep 19 23:40:33 2023 KojiSummaryElectronicsVertex Electronics Wed PlanPlan
for Sept 20, 2023

For morning people:
  
  17857   Tue Sep 19 20:49:08 2023 KojiSummaryElectronicsVertex Electronics Trouble shooting[Murtaza, Koji]

ITMX / BS / PRM sat amps were removed
from the rack and checked on the workbench.
 PXL_20230920_031834833.jpgPXL_20230920_033913077.jpgPXL_20230920_034246461.jpgPXL_20230920_035930889.jpgPXL_20230920_035933871.MP.jpg 
  17856   Tue Sep 19 19:48:20 2023 KojiSummaryElectronicsVertex Electronics Trouble shooting[Paco, Murtaza, JC, Koji, Radhika]

MC1/MC2 was working fine.

At
  
  17855   Tue Sep 19 19:21:10 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ DAY 5[Koji, Radhika]

Update to the Foton/Load
  
  17854   Tue Sep 19 17:25:38 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ DAY 5MCs
OSEM input / coil output gain tuning

Seeing
that MC1, MC2, MC3 OSEM readings looked reasonable
 MC1_OSEM_input_gains.pngMC1_damping_kick.png 
  17853   Mon Sep 18 23:09:40 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 4MC1 is ready for the damping test

Trouble shooting plan


Is the LED on? => Check
  
  17852   Mon Sep 18 20:16:03 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 4- Here is the thought how does the factor
of 9 come from:


We are driving OSEM LEDs
  
  17849   Mon Sep 18 18:38:02 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ DAY 4[Koji, Paco, Radhika]

We recorded the 5 OSEM sensor readings
for each of the 8 upgraded optics.
  
  17848   Mon Sep 18 10:26:12 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 4[JC, Paco, Radhika, Koji]

Morning/Afternoon work:


Long DB cable installation
 PXL_20230918_233642072.MP.jpgPXL_20230918_233659231.jpg 
  17847   Fri Sep 15 22:57:15 2023 KojiSummaryElectronicsc1sus ADC1 AA chassis fixc1sus ADC1 AA chassis fix.


Brought the chassis on
the workbench.
Opened the chassis
 PXL_20230916_025737289.jpg 
  17846   Fri Sep 15 18:50:34 2023 KojiUpdateCDSDolphin Fencing Investigation / Full CDS crash / nodus reboot / recovered allDolphin
Fencing technique

I believe that the dolphin emits
  
  17845   Fri Sep 15 12:51:29 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 3[Radhika, Paco, Murtaza, Koji]

We made great
 PXL_20230915_194539031~2.jpgPXL_20230916_005624158.MP.jpgPXL_20230916_005531262.MP.jpg 
  17844   Thu Sep 14 11:46:28 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 2[Radhika, Paco, Murtaza, Koji]

Morning work:


Power Strip assembly
Power
 PXL_20230915_023755839.jpgPXL_20230915_012131487.jpg 
  17843   Wed Sep 13 17:26:26 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 1[Radhika, Paco, Murtaza, Koji]

- Removed all the units
that will not be used in the new setup.
 rn_image_picker_lib_temp_d1ceae3a-04ba-4bdb-8fdc-1f9d8d3000e6.jpgrn_image_picker_lib_temp_7757df3b-1daf-4a12-a93c-14fd54b6355b.jpgrn_image_picker_lib_temp_c8e55ebb-eb8e-4eb2-bcb2-e12083f3aadc.jpg 
  17842   Wed Sep 13 14:02:29 2023 KojiSummaryElectronicsVertex Electronics Transition ~ final prep- 4x 1064nm NPROs
are OFF. The lab hall is laser safe, although
  
  17841   Wed Sep 13 13:50:48 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ final prepOSEM values for 8 vertex optics ~before~
electronics upgrade (averaged over 60 s):

['C1:SUS-BS_ULSEN_IN1',
  
  17840   Wed Sep 13 12:46:03 2023 KojiSummaryElectronicsVertex Electronics Transition ~ final prep
[OK] Reflected the sorensen
setup (minimal change from the conventional
config. (See the attachment)

Before
 rack_plan_1X345.pdf 
  17839   Tue Sep 12 23:10:06 2023 KojiSummaryElectronicsVertex Electronics TransitionNote on Sorensen:

- Eurocard crate requires
+-15V. We can place two 15V Sorensens on
  
  17838   Tue Sep 12 18:55:55 2023 KojiSummaryElectronicsVertex Electronics TransitionWe are ready to do the transition
from Wed 1PM.

The items for the upgrade was collected
 PXL_20230913_013735728.jpg 
  17837   Tue Sep 12 18:49:51 2023 KojiUpdateGeneralTransformed 3x 18bit AI chassis into 16bitFor the preparation of the electronics
upgrade, three 18bit DAC AI chassis were
transformed to 16bit version.
 PXL_20230913_000718873.jpgPXL_20230913_011622783.MP.jpgPXL_20230913_011644441.MP.jpgPXL_20230913_011631099.jpg 
  17836   Mon Sep 11 19:35:27 2023 RadhikaUpdateASSReducing XARM-ASS Errors[Radhika, Murtaza, Paco]

Today we decided to take a closer
look at the demod phases of the T and L error
  
  17835   Sat Sep 9 16:25:07 2023 RadhikaUpdateASSReducing XARM-ASS Errors[Radhika, Murtaza]

This post summarizes XARM ASS efforts
from Friday 9/8 and Saturday 9/9.
 XASS_transmission_mat_only.pngXASS_transmission_err_only.png 
  17834   Fri Sep 8 17:11:53 2023 KojiUpdateCDSFSSSlow restorationI came to the lab to see the recovery work
from the power glitch this morning 8:15AM.
All CDS seems up. The suspensions are somewhat
  
  17833   Thu Sep 7 21:09:17 2023 PacoUpdate eCARM and eDARM to ALS CARM and ALS DARMTonight
I managed to lock CARM and DARM under ALS
control only
 ALSCARMDARMlock_oolnoise_Screenshot_2023-09-07_21-32-31.pngALSerrortuning_Screenshot_2023-09-07_21-33-10.pngALSCARMDARM_oltfs_Screenshot_2023-09-07_21-36-34.png 
  17832   Thu Sep 7 18:42:02 2023 Paco, Radhika, MurtazaUpdateASSReducing XARM-ASS Errors[Radhika, Murtaza]

We recalculated the sensing matrix
for XARM ASS by collecting each sensor's
 XASS_sensing_mat_2023-09-07.pngXASS_centering_only.pngX_ASS_L_Loop_only.png 
  17831   Thu Sep 7 16:25:01 2023 MurtazaUpdateSUSETMX TestingCOIL
BALANCING FOR ETMX
 ETMX_BUT_POS_COUPLING.pngETMX_POS_PIT_COUPLING.pngETMX_POS_YAW_COUPLING.pngETMX_PIT_YAW_COUPLING.png 
ELOG V3.1.3-