ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
13050
|
Wed Jun 7 15:41:51 2017 |
Steve | Update | Computers | window laptop scanned | Randy Trudeau scanned our Window laptop
Dell 13" Vostro and Steve's memory
stick for virus. Nothing was found. The search |
|
6209
|
Wed Jan 18 12:36:26 2012 |
kiwamu | Update | LSC | wiped a steering mirror on the REFL path | I
wiped both surfaces of the REFL second steering
mirror. |
 |
3111
|
Wed Jun 23 23:55:03 2010 |
Katharine, Sharmila, Rana, Steve and Kiwamu | Update | VAC | wiped the BS | Some unused
optics in the BS chamber were removed. |
|
12355
|
Fri Jul 29 15:17:23 2016 |
Steve | Update | SUS | wire and clamping test | Unbaked steel music wire from "Ca
Fine Wire Co" from 24" od spool,
od 0.0017" used. Identical to the one |
|
16472
|
Wed Nov 17 07:32:48 2021 |
Chub | Update | General | wire clamp plate mod | This will be difficult to modify with the
magnets and dumbells in place. Even
if someone CAN clamp this piece into an endmill |
|
16473
|
Wed Nov 17 11:53:27 2021 |
Koji | Update | General | wire clamp plate mod | Of course, we remove the magnet-dumbbell
for machining. After that the part will be
cleaned/baked again. And Yehonathan is going |
|
12421
|
Thu Aug 18 08:17:16 2016 |
Steve | Update | SUS | wire clamping preparation | The wire inprints were removed by 800P
grain paper [Norton 73568] The SS bridge
block now has an undesireble vally in the |
|
12036
|
Wed Mar 16 15:36:03 2016 |
Steve | Update | SUS | wire standoff test cut | Ruby wire standoff 1 mm od. with
V-groove test cut. SOS sus wire 0.0017"
od. is in the background. |
|
12037
|
Wed Mar 16 16:02:40 2016 |
Koji | Update | SUS | wire standoff test cut | It looks almost OK, but we need a bit sharper
picture for both the groove and thw wire. |
|
11642
|
Fri Sep 25 11:08:33 2015 |
Steve | Update | SUS | wire standoffs | Our last effort to change the existing
Al-6061 wire standoffs was at April 2012
We requested sapphire and/or ruby |
|
1722
|
Wed Jul 8 11:13:36 2009 |
Alberto | Omnistructure | Computers | wireless router disconnected | Once again, this morning I found the wireless
router disconnected from the LAN cable. No
martian WiFi was available. |
|
13471
|
Wed Dec 13 09:49:23 2017 |
johannes | Update | ASS | wiring diagram | I attached a wiring schematic from the
slow DAQ to the eurocrate modules. Of these,
pins 1-32 (or 1A-16C) and pins 33-64 (17A-32C) |
|
4720
|
Sun May 15 14:01:56 2011 |
kiwamu | Update | IOO | wiring diagram for IP-POS | Here is a wiring diagram which shows how
IP-POS (new official name is IB_POS)
is connected. |
|
4725
|
Mon May 16 11:14:36 2011 |
rana | Update | IOO | wiring diagram for IP-POS | Just FYI, the 3113 is a 12-bit ADC, so
we won't get very good resolution out of
these. We should get one of those purple |
|
9425
|
Mon Nov 25 10:57:14 2013 |
Koji | Update | CDS | woes on the X-end hosts | This morning I came in the 40m then found
1) c1auxex was throwing out the same |
|
12764
|
Fri Jan 27 19:40:03 2017 |
rana | Metaphysics | elog | word wrapping & large images | "Why does the word wrapping not work
in our browsers with ELOG?" I sometimes
wonder. Some of the elogs are fine, but often |
|
4862
|
Thu Jun 23 02:12:12 2011 |
Sonali | Update | Green Locking | work schedule. | June 22-June 24:
1.Coupling
light into fibre at the ETMY. |
|
11324
|
Tue May 26 11:05:10 2015 |
Steve | Update | PEM | worked around ETMY seism. | The cable tray holder cross beam is removed
and cut short for good access to seismometer. |
 |
12391
|
Wed Aug 10 10:32:44 2016 |
Steve | Update | SEI | working Guralps as they are | The saga has started
here We have to give credit to
the Boss who fixed it. The seismometers themself |
6x |
2163
|
Fri Oct 30 04:41:37 2009 |
rob | Update | Locking | working again | I never actually figured out exactly what
was wrong in entry 2162,
but I managed to circumvent by changing the |
|
11627
|
Mon Sep 21 15:22:19 2015 |
jamie | Update | DAQ | working on new fb replacement | I've been putting together a new machine
that Rolf got for us as a replacement for
fb. |
|
2321
|
Tue Nov 24 14:33:22 2009 |
Alberto | Update | ABSL | working on the AP table | I'm working on the AP table. I also opened
the auxiliary NPRO shutter. The auxiliary
beam is on its path on the AP table and PSL |
|
2324
|
Tue Nov 24 19:16:02 2009 |
Alberto | Update | ABSL | working on the AP table |
|
|
12404
|
Fri Aug 12 14:37:34 2016 |
Steve | Update | SEI | working seismometers as they are | 2.1 mag earth quake in Norhten Ca
Our seimometers need professorial
centering. Related electronics must be checked |
  |
8529
|
Sat May 4 00:21:00 2013 |
rana | Configuration | Computers | workstation updates | Koji and I went into "Update
Manager" on several of the Ubuntu workstations
and unselected the "check for updates" |
|
17293
|
Mon Nov 21 15:16:12 2022 |
Tega | Update | CDS | workstation upgrade | We are currently working on donatella workstation
upgrade, which we are calling donatellaclone
for now. After installing Debian 11, we install |
|
5574
|
Thu Sep 29 03:43:20 2011 |
kiwamu | Update | ASC | wrong channel assignment on IPPOS | The
channels for IPPOS had been assigned in a
wrong way. |
|
4734
|
Tue May 17 19:38:32 2011 |
kiwamu | Update | SUS | wrong connection on 1X5 | Today Steve was working around the 1X5
rack to strain relief the cable jungles and
the |
 |
1251
|
Fri Jan 23 16:33:27 2009 |
pete | Update | oplevs | x-arm oplev calibrations | ITMXpit 71 microrad/ct
ITMXyaw 77 microrad/ct
ETMXpit 430 microrad/ct
|
|
17014
|
Mon Jul 18 17:07:12 2022 |
yuta | Update | LSC | x4.12 added to ETMX coil outputs to balance with ETMY | To balance the actuation on ETMX and ETMY,
x4.12
was aded to C1:SUS-ETMX_(UL|UR|LR|LL|SD)COIL |
|
7718
|
Fri Nov 16 03:12:39 2012 |
Ayaka, Den | Update | Green Locking | xarm locked | We aligned and locked xarm for green.
|
|
7719
|
Fri Nov 16 09:57:57 2012 |
Jenne | Update | Green Locking | xarm locked |
|
|
9971
|
Mon May 19 22:44:21 2014 |
den | Update | PEM | xend sei isolation kit is set |
|
|
7716
|
Thu Nov 15 21:52:48 2012 |
Den, Ayaka | Update | Green Locking | yarm locked | We aligned and locked Y arm for green:
installed camera on PSL
to monitor green transmission
aligned |
 |
9485
|
Wed Dec 18 03:29:48 2013 |
Den | Update | LSC | yarm locked on mc | As a CM slow path test I locked free swinging
yarm by actuating on MC length with bandwidth
of 200 Hz. Crossover with AO is not stable |
|
9967
|
Sat May 17 14:48:06 2014 |
den | Update | PEM | yend sei isolation kit is set | Yend seismometer isolation kit (elog
8461) hosts Guralp seismometer. I made
a cable for inside connection, assembled |
 |
10131
|
Mon Jul 7 08:13:41 2014 |
steve | Update | General | yes,there was firework | |
|
2808
|
Mon Apr 19 13:23:03 2010 |
josephb | Configuration | Computers | yum update fixed on control room machines | I went to Ottavia, and tried running yum
update. It was having dependancy issues
with mjpegtools, which was a rpmforge provided |
|
1360
|
Thu Mar 5 02:24:19 2009 |
rana | Configuration | Computers | yum.repos.d | I added the following repos which
I found on allegra to megatron and then did
a 'yum install sshfs' on both machines: |
|
1546
|
Tue May 5 09:22:46 2009 |
caryn | Update | PEM | zeros | For several of the channels on the PEM
ADCU, zeros are occuring at the same time.
Does anyone know why that might happen or |
 |
6784
|
Thu Jun 7 12:49:50 2012 |
Jamie | Update | Computers | zita network configured | Added zita to the martian host table, and
configured his network accordingly:
zita A 192.168.113.217
|
|
9368
|
Tue Nov 12 21:50:01 2013 |
rana | Update | | zita network configured |
I installed 'nfs-client' on
zita (the StripTool terminal). It now has |
|
6774
|
Wed Jun 6 22:25:05 2012 |
Jamie | Update | Computers | zita now running ubuntu 10.04 | I'll finish the rest of the config to turn
it into a full-fledged workstation tomorrow. |
|
15016
|
Wed Nov 6 17:45:34 2019 |
gautam | Update | LSC | ~ | Here is a comparison of the response of
various DoFs in our various RFPD sensors
for two different CARM offsets. Even in the |
|