  17171   Mon Oct 3 15:19:05 2022 PacoUpdateBHDLO phase noise and control after violin mode filters

[Anchal, Paco]

We started the day by taking a spectrum of C1:HPC-LO_PHASE_IN1, the BHD error point, and confirming the absence of 268 Hz peaks believed to be violin modes on LO1. We then locked the LO phase by actuating on LO2, and AS1. We couldn't get a stable loop with AS4 this morning. In all of these trials, we looked to see if the noise increased at 268 Hz or its harmonics but luckily it didn't. We then decided to add the necessary output filters to avoid exciting these violin modes. The added filters are in the C1:SUS-LO1_LSC bank, slots FM1-3 and comprise bandstop filters at first, second and third harmonics observed previously (268, 536, and 1072 Hz); bode plots for the foton transfer functions are shown in Attachment #1. We made sure we weren't adding too much phase lag near the UGF (~ 1 degree @ 30 Hz).

We repeated the LO phase noise measurement by actuating on LO1, LO2 and AS1, and observe no noise peaks related to 268 Hz this time. The calibrated spectra are in Attachment #2. Now the spectra look very similar to one another, which is nice. The rms is still better when actuating with AS1.


[Paco]

After the above work ended, I tried enabling FM1-3 on the C1:HPC_LO_PHASE control filters. These filters boost the gain to suppress noise at low frequencies. I carefully enabled them when actuating on LO1, and managed to suppress the noise by another factor of 20 below the UGF of ~ 30 Hz. Attachment #3 shows the screenshot of the uncalibrated noise spectra for (1) unsupressed (black, dashed), (2) suppressed with FM4-5 (blue, solid), and (3) boosted FM1-5 suppression (red).


Next steps:

  • Compare LO-ITMY and LO-ITMX single bounce noise spectra and MICH.
  • Compare DC locking scheme versus BH55 once it's working.
Attachment 1: filters_c1sus_lo1_lsc.png
filters_c1sus_lo1_lsc.png
Attachment 2: BHDC_asd_act.png
BHDC_asd_act.png
Attachment 3: boosted_lo_phase_control.png
boosted_lo_phase_control.png
  17170   Mon Oct 3 13:11:22 2022 YehonathanUpdateBHDSome comparison of LO phase lock schemes

I pushed a notebook and a Finesse model for comparing different LO phase locking schemes. Notebook is on https://git.ligo.org/40m/bhd/-/blob/master/controls/compare_LO_phase_locking_schemes.ipynb,

Here's a description of the Finesse modeling:

I use a 40m kat model https://git.ligo.org/40m/bhd/-/blob/master/finesse/C1_w_initial_BHD_with_BHD55.kat derived from the usual 40m kat file. There I added and EOMs (in the spaces between the BS and ITMs and in front of LO2) to simulate audio dithering. A PD was added at a 5% pickoff from one of the BHD ports to simulate the RFPD recently installed on the ITMY table.

First I find the nominal LO phase by shaking MICH and maximizing the BHD response as a function of the LO phase (attachment 1).

Then, I run another simulation where I shake the LO phase at some arbitrary frequency and measure the response at different demodulation schemes at the RFPD and at the BHD readout.

The optimal responses are found by using the 'max' keyword instead of specifying the demodulation phase. This uses the demodulation phase that maximizes the signal. For example to extract the signal in the 2 RF sideband scheme I use:

pd3 BHD55_2RF_SB $f1 max $f2 max $fs max nPickoffPDs

I plot these responses as a function of LO phase relative to the nominal phase divided by 90 degrees (attachment 2). The schemes are:

1. 2 RF sidebands where 11MHz and 55MHz on the LO and AS ports are used.

2. Single RF sideband (11/55 MHz) together with the LO carrier. As expected, this scheme is useful only when trying to detect the amplitude quadrature.

3. Audio dithering MICH and using it together with one of the LO RF sidebands. The actuation strength is chosen by taking the BS actuation TF 1e-11 m/cts*(50/f)**2 and using 10000 cts giving an amplitude of 3nm for the ITMs.

For LO actuation I can use 13 times more actuation strentgh becasue its coild drivers' output current is 13 more then the old ones.

4. Double audio dithering of LO2+MICH detecting it directly at the BHD readout (attachment 3).

Without noise considerations, it seems like double audio dithering is by far the best option and audio+RF is the next best thing.

The next thing to do is to make some noise models in order to make the comparison more concrete.

This noise model will include Input noises, residual MICH motion, and laser noise. Displacement noise will not be included since it is the thing we want to be detected.

Attachment 1: MICH_sens_vs_LO_phase.pdf
MICH_sens_vs_LO_phase.pdf
Attachment 2: LO_phase_sens_vs_LO_phase_RF.pdf
LO_phase_sens_vs_LO_phase_RF.pdf
Attachment 3: LO_phase_sens_vs_LO_phase_double_audio.pdf
LO_phase_sens_vs_LO_phase_double_audio.pdf
  17169   Mon Oct 3 08:35:59 2022 TegaUpdateIMCAdding IMC channels to frames for NN test

[Rana]

For the upcoming NN test on the IMC, we need to add some more channels to the frames. Can someone please add the MC2 TRANS SUM, PIT, YAW at 256 Hz? and then make sure they're in frames.

and even though its not working correctly, it would be good if someone can turn the MC WFS on for a little while. I'd just like to get some data to test some code. If its easy to roughly close the loops, that would be helpful too.


[Anchal]

Currently, none of these channels are being written on frames. From simulink model, it seems the channels:

  • C1:IOO-MC_TRANS_SUMFILT_OUT_DQ

  • C1:IOO-MC_TRANS_PIT_OUT_DQ

  • C1:IOO-MC_TRANS_YAW_OUT_DQ

are supposed to be DQed but are not present in the /opt/rtcds/caltech/c1/chans/daq/C1MCS.ini file. I tried simply adding these channels to the file and rerunning the daqd_ services but that caused 0x2000 error on c1mcs model. In my attempt, I did not know what chnnum to give for these channels so I omitted that and maybe that is the issue.

The only way I know to fix this is to make and install c1mcs model again which would bring these channels into C1MCS.ini file. But We'll have to run activateDQ.py if we do that which I am not totally sure if it is in running condition right now. @Christopher Wipf do you have any suggestions?


[Rana]

aren't they all filtered? If so, perhaps we can choose whatever is the equivalent naming at the LIGO sites rather than roll our own again.

@Tega Edo can we run activateDQ.py or will that break everything now?


[Tega]

@Rana Adhikari Looking into this now.

@Anchal Gupta The only problem I see with activateDQ.py is the use of the deprecated print function, i.e. print var instead of print(var). After fixing that, it runs OK and does not change the input INI files as they already have the required channel names. I have created a temporary folder, /opt/rtcds/caltech/c1/chans/daq/activateDQtests/, which is populated with copies of the original INI files, a modified version of activateDQ.py that does not overwrite the original input files, and a script file difftest.sh that compares the input and output files so we can test the functionality of activateDQ.py in isolation. Furthermore, looking through the code suggests that all is well. Can you look at what I have done to check that this is indeed the case? If so, your suggestion of rebuilding and installing the updated c1mcs model and running activateDQ.py afterward should do the trick.

I tested the code with:

cd /opt/rtcds/caltech/c1/chans/daq/activateDQtests/

./activateDQ.py

which creates output files with an _ prefix, for example _C1MCS.ini is the output file for C1MCS.ini, then I ran

./difftest

to compare all the input and corresponding output files.

Note that the channel names you are proposing would change after running activateDQ.py, i.e.

C1:IOO-MC_TRANS_SUMFILT_OUT_DQ -> C1:IOO-MC_TRANS_SUM_ERR

C1:IOO-MC_TRANS_PIT_OUT_DQ -> C1:IOO-MC_TRANS_PIT_ERR

C1:IOO-MC_TRANS_YAW_OUT_DQ -> C1:IOO-MC_TRANS_YAW_ERR

My question is this: why aren't we using the correct channel names in the first place so that we have less work to do later on when we finally decide to stop using this postbuild script?


[Anchal]

Yeah I found that these ERR channels are acquired and stored. I don't think we should do this either. Not sure what was the original motivation for this change. I tried commenting out this part of activateDQ.py and remaking and reinstalled c1mcs but it seems that activateDQ.py is called as postbuild script automatically on install and it uses some other copy of this file as my changes did not take affect and the DQ name change still happened.


[Tega]

Ah, we encountered the same puzzle as well. Chris found out that our models have `SCRIPT=activateDQ.py` embedded in the cds parameter block description, see attached image. We believe this is what triggers the postbuild script call to `activateDQ.py`. As for the file location, modern rtcds would have it in /opt/rtcds/caltech/c1/post_build, but I am not sure where ours is located. I did a quick search for this but could not find it in the usual place so I looked around for a bit and found this:

controls@rossa> find /opt/rtcds/userapps/ -name "activateDQ.py"

/opt/rtcds/userapps/trunk.bak/cds/c1/scripts/activateDQ.py

/opt/rtcds/userapps/tags/H2OAT_RCG2.5.1/cds/c1/scripts/activateDQ.py

/opt/rtcds/userapps/branches/StanfordGuardianDev/cds/c1/scripts/activateDQ.py

/opt/rtcds/userapps/branches/branch-2.3/cds/c1/scripts/activateDQ.py

/opt/rtcds/userapps/branches/branch-2.4/cds/c1/scripts/activateDQ.py

/opt/rtcds/userapps/trunk/cds/c1/scripts/activateDQ.py

My guess is the last one /opt/rtcds/userapps/trunk/cds/c1/scripts/activateDQ.py.

Maybe we can ask @Yuta Michimura since he wrote this script?

Anyway, we could also try removing SCRIPT=activateDQ.py from the cds parameter block description to see if that stops the postbuild script call, but keep in mind that doing so would also stop the update of the OSEM and oplev channel names. This way we know what script is being used since we will have to run it after every install (this is a bad idea).

controls@c1sus:~ 0$ env | grep script

CDS_SCRIPTS_PATH=:/opt/rtcds/userapps/release/cds/c1/scripts:/opt/rtcds/userapps/release/cds/common/scripts:/opt/rtcds/userapps/release/isc/c1/scripts:/opt/rtcds/userapps/release/isc/common/scripts:/opt/rtcds/userapps/release/sus/c1/scripts:/opt/rtcds/userapps/release/sus/common/scripts

It looks like the guess was correct. Note that in the newer version of rtcds, we can use `rtcds env` instead of `env` to see what is going on.

Attachment 1: Screen_Shot_2022-09-30_at_9.52.39_AM.png
Screen_Shot_2022-09-30_at_9.52.39_AM.png
  17168   Sat Oct 1 13:09:49 2022 AnchalUpdateIMCWFS turned on

I turned on WFS on IMC at:

PDT: 2022-10-01 13:09:18.378404 PDT
UTC: 2022-10-01 20:09:18.378404 UTC
GPS: 1348690176.378404

The following channels are being saved in frames at 1024 Hz rate:

  • C1:IOO-MC_TRANS_PIT_ERR (Same as C1:IOO-MC_TRANS_PIT_OUT)
  • C1:IOO-MC_TRANS_YAW_ERR (Same as C1:IOO-MC_TRANS_YAW_OUT)
  • C1:IOO-MC_TRANS_SUM_ERR (Same as C1:IOO-MC_TRANS_SUMFILT_OUT)

We can keep it running over the weekend as we will not use the interferometer. I'll keep an eye on it with occasional log in. We'll post the time when we switch it off again.


The IMC lost lock at:

UTC    Oct 03, 2022    01:04:16    UTC
Central    Oct 02, 2022    20:04:16    CDT
Pacific    Oct 02, 2022    18:04:16    PDT

GPS Time = 1348794274

The WFS loops kept running and thus took IMC to a misaligned state. Between the above two times, IMC was locked continuously with very brief lock loss events, and had all WFS loops running.

  17167   Fri Sep 30 20:18:55 2022 PacoUpdateBHDLO phase noise with different actuation points

[Paco, Koji]

We took lo phase noise spectra actuating on the for different optics-- LO1, LO2, AS1, and AS4. The servo was not changed during this time with a gain of 0.2, and we also took a noise spectrum without any light on the DCPDs. The plot is shown in Attachment #1, calibrated in rad/rtHz, and shown along with the rms values for the different suspension actuation points. The best one appears to be AS1 from this measurement, and all the optics seem to show the same 270 Hz (actually 268 Hz) resonant peak.


268 Hz noise investigation

Koji suspected the observed noise peak belongs to some servo oscillation, perhaps of mechanical origin so we first monitored the amplitude in an exponentially averaging spectrum. The noise didn't really seem to change too much, so we decided to try adding a bandstop filter around 268 Hz. After the filter was added in FM6, we turned it on and monitored the peak height as it began to fall slowly. We measured the half-decay time to be 264 seconds, which implies an oscillation with Q = 4.53 * f0 * tau ~ 3.2e5. This may or may not be mechanical, further investigation might be needed, but if it is mechanical it might explain why the peak persisted in Attachment #1 even when we change the actuation point; anyways we saw the peak drop ~ 20 dB after more than half an hour... After a while, we noticed the 536 Hz peak, its second harmonic, was persisting, even the third harmonic was visible.

So this may be LO1 violin mode & friends -

We should try and repeat this measurement after the oscillation has stopped, maybe looking at the spectra before we close the LO_PHASE control loop, then closing it carefully with our violin output filter on, and move on to other optics to see if they also show this noise.

Attachment 1: BHDC_asd_actuation_point.png
BHDC_asd_actuation_point.png
  17166   Fri Sep 30 18:30:12 2022 AnchalUpdateASSModel Changes

I updated c1ass model today to use PR2 PR3 instead of TT1 TT2 for YARM ASS. This required changes in c1su2 too. I have split c1su2 into c1su2 (LO1., LO2, AS1, AS4) and c1su3 (SR2, PR2, PR3). Now the two models are using 31 and 21 CPU out of 60 which was earlier 55/60. All changed compiled correctly and have been uploaded. Models have been restared and medm screens have been updated.


Model changes

c1su2:

  • Everything related to SR2, PR2, and PR3 have been moved to c1su3.
  • Extra binary output channels are also distributed between c1su2 and c1su3. BO_4 and BO5 have been moved to c1su3.

c1su3:

  • Added IPC receiving from ASS for PR2 and PR3

c1ass:

  • Inputs to TT1 and TT2 PIT and YAW filter modules have been terminated to ground.
  • The ASS outputs for YARM have been renamed to PR2 and PR3 from TT1 and TT2.
  • IPC sending blocks added to send PR2 and PR3 ASC signals to c1su3.

 


To do:

  • Updated YARM ASS output matrix to handle change in coil driver actuation on PR2 and PR3 in comparison to TT1 and TT2.
  • Yuta suggested dithering PR2 and PR3 for input beam pointing for YARM alignment.
  17165   Thu Sep 29 18:01:14 2022 AnchalUpdateBHDBH55 LSC Model Updates - part IV

More model changes

c1lsc:

  • BH55_I and BH55_Q are now being read at ADC_0_14 and ADC_0_15. The ADC_0_20 and ADC_0_21 are bad due to faulty whitening filter board.
  • The whitening switch controls were also shifted accordingly.
  • the slow epics channels for BH55 anti-aliasing switch and whitening switch were added in /cvs/cds/caltech/target/c1iscaux/C1_ISC-AUX_LSCPDs.db

c1mcs:

  • MC1, MC2, and MC3 are running on new suspension models now.

c1hpc:

  • DCPD_A and DCPD_B have been renamed to BHDC_A and BHDC_B following naming convention at other ports.
  • After the input summing matrix, the signals are called BHDC_SUM and BHDC_DIFF now.
  • BHDC_SUM and BHDC_DIFF can be directly using in sensing matrix bypassing the dither demodulation (to be used for DC locking)
  • BH55_I and BH55_Q are also sent for dither demodulation now (to be used in double dither method, RF and audio).
  • SHMEM channel names to c1bac were changed.

c1bac:

  • Conformed with new SHMEM channel names from c1hpc
  17164   Thu Sep 29 15:12:02 2022 JCUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone

[Jamie, Christopher, JC]

This morning we decided to label the the fiber optic cables. While doing this, we noticed that the ends had different label, 'Host' and 'Target'. Come to find out, the fiber optic cables are directional. Four out of Six of the cables were reversed. Luckily, 1 cable for the 1Y3 IO Chassis has a spare already laid (The cable we are currently using).  Chris, Jamie, and I have begun reversing these cable to there correct position.

Quote:

[Tega, JC]

We laid 4 out of 6 fiber cables today. The remaining 2 cables are for the I/O chassis on the vertex so we would test the cables the lay it tomorrow. We were also able to identify the problems with the 2 supposedly faulty cable, which are not faulty. One of them had a small bend in the connector that I was able to straighten out with a small plier and the other was a loose connection in the switch part. So there was no faulty cable, which is great! Chris wrote a matlab script that does the migration of all the model files. I am going through them, i.e. looking at the CDS parameter block to check that all is well. Next task is to build and install the updated models. Also need to update the '/opt/rtcds' and '/opt/rtapps' directory to the latest in the 40m chiara system.

 

 

  17163   Wed Sep 28 21:54:08 2022 PacoUpdateBHDcalibrated LO phase noise; update

Repeated the LO phase noise measurement, this time with the LO - ITMY single bounce, and a couple of fixes Koji hinted at including:

  1. The DEMOD angle was the missing piece! The previous error point showed lower noise than the individual DCPDs because the demodulation angle had not been checked. I corrected it so that the error point in LO_PHASE control was exactly equal to the LO-ITMY single bounce fringe. With this, the gain on the servo had to be adjusted from 4.00 to 0.12, still using FM4, FM5, and this time also FM8 (BLP600).
  2. Turned off 60 Hz harmonics comb notches on DCPDs, they are unecessary.
  3. Acquired noise spectra down to 0.1 Hz, with 0.03 Hz bin width to increase resolution and identify resonant SUS noise near 1 Hz.

This time, after alignment the fringe amplitude was 500 counts. Attachment #1 shows the updated plot with the calibrated noise spectra for the individual DCPD signals A and B as well as their rms values. Attachment #2 shows the error point, in loop and the estimated out of loop spectra with their rms as well. The peak at ~ 240 Hz is quite noticeable in the error point time series, and dominates the high frequency rms noise. The estimated rms out of loop noise is ~ 9.2 rad, down to 100 mHz.

Attachment 1: dcpd_phase_asd.pdf
dcpd_phase_asd.pdf
Attachment 2: lo_phase_asd.pdf
lo_phase_asd.pdf
  17162   Wed Sep 28 19:15:56 2022 KojiUpdateGeneralTesting 950nm laser found in trash pile

I don't know what was wrong with the past setup but the 950nm laser (QPHOTONICS QFLD-950-3S) just worked fine up to ~300MHz with basically the same setup.

A 20dB coupler picks up a small amount of the driving signal from the source signal of the network analyzer. This was fed to CHR. The fiber-coupled NewFocus PD RF output was connected to CHA.
The calibration of the response was done with the thru response (connect the source signal to the CHA via all the long cables).

Attachment 1 shows the response CHA/CHR. The output is somewhat flat up to 20MHz and goes down towards 100MHz, but still active up to 500MHz as long as the normalization with the New Focus PD works.
The structure around 200MHz~300MHz changes with how the wires of the clips are arranged. I have twisted and coiled them as shown and the notch disappeared. For the permanent setup we should keep the lines as short as possible and take care of the stray capacitance and the inductance.

Attachment 2 shows the setup at the network analyzer side. Nothing special.

Attachment 3 shows the setup at the laser side. The DB9 connector on the Jenne's laser has the negative output of the LD driver connected to the coax core and the positive output connected to the shield of the coax. Therefore the coax core (red clip) has to be connected to Pin 9 and the coax shield (black clip) to PIn 5.

Attachment 1: PXL_20220929_013850989.MP.jpg
PXL_20220929_013850989.MP.jpg
Attachment 2: PXL_20220929_013859439.jpg
PXL_20220929_013859439.jpg
Attachment 3: PXL_20220929_013911125.jpg
PXL_20220929_013911125.jpg
  17161   Wed Sep 28 16:37:26 2022 PacoUpdateBHDcalibrated LO phase noise; update

[yuta, paco]

Update; the high frequency ( > 100 Hz) drop is of course not real and comes from a 4th order LP filter in the HPC demod I filter which I haven't accounted for. Furthermore, we have gone through the calibration factors and corrected a factor of 2 in the optical gain. Then, I also added the CLTF to show in loop and out of loop error respectively. The updated plot, though not final, is in Attachment #1.

Attachment 1: lo_phase_asd.pdf
lo_phase_asd.pdf
  17160   Tue Sep 27 10:50:11 2022 PacoUpdateBHDcalibrated LO phase noise

Locked LO phase to ITMX single bounce beam at the AS port, using the DCPD (A-B) error point and actuating on LO1 POS. For this the gain was tuned from 0.6 to 4.0. A rough Michelson fringe calibration gives a counts to meters conversion of ~0.212 nm/count, and the OLTF looks qualitatively like the one in a previous measurement (~ 20 dB at 1 Hz, UGF = 30 Hz). The displacement was then converted to phase using lambda=1e-6; I'm not sure what the requirement is on the LO phase (G1802014 says 1e-4 rad/rtHz at 1 Hz, but our requirement doc says 1 to 20 nrad/rtHz (rms?)... anyways wit this rough calibration we are still off in either case.

The balancing gain is obvious at DC in the individual DCPD spectra, and the common mode rejection in the (A-B) signal is also appreciable. I'll keep working on refining this, and implementing a different control scheme.

Attachment 1: lo_phase_asd.pdf
lo_phase_asd.pdf
  17159   Mon Sep 26 11:39:37 2022 PacoUpdateBHDBH55 RFPD installed - part II

[Paco, Anchal]

We followed rana's suggestion for stress relief on the SMA joint in the BH55 RFPD that Radhika resoldered. We used a single core, pigtailed wire segment after cleaning up the solder joint on J7 (RF Out) and also soldered the SMA shield to the RF cage (see Attachment #1). This had a really good effect on the rigidity of the connection, so we moved back to the ITMY table.

We measured the TEST in to RF Out transfer function using the Agilent network analyzer, just to see the qualitative features (resonant gain at around 55 MHz and second harmonic suppression at around 110 MHz) shown in Attachment #2. We used 10kOhm series resistance in test input path to calibrate the measured transimpedance in V/A. The RFPD has been installed in the ITMY table and connected to the PD interface box and IQ demod boards in the LSC rack as before.

Measurement files

Attachment 1: PXL_20220926_175010061.MOTION.jpg
PXL_20220926_175010061.MOTION.jpg
Attachment 2: BH55_Transimpedance_Measurement.pdf
BH55_Transimpedance_Measurement.pdf
  17158   Fri Sep 23 19:07:03 2022 TegaUpdateComputersWork to improve stability of 40m models running on teststand

[Chris, Tega]

Timing glitch investigation:

  • Moved dolphin transmit node from c1sus to c1lsc bcos we suspect that the glitch might be coming from the c1sus machine (earlier c1pem on c1sus was running faster then realtime).
  • Installed and started c1oaf to remove the shared memory IPC error to/from c1lsc model
  • /opt/DIS/sbin/dis_diag gives two warnings on c1sus2
    • [WARN] IXH Adapter 0 - PCIe slot link speed is only Gen1
    • [WARN] Node 28 not reachable, but is an entry in the dishosts.conf file - c1shimmer is currently off, so this is fine.

DAQ network setup:

  • Added the DAQ ethernet MAC address  and fixed IPV4 address for the front-ends to '/etc/dhcp/dhcpd.conf'
  • Added the fixed DAQ IPV4 address and port for all the front-ends to '/etc/advligorts/subscriptions.txt' for `cps_recv` service
  • Edited '/etc/advligorts/master' by including all the iop and user models '.ini' files in '/opt/rtcds/caltech/c1/chans/daq/' containing channel info and the corresponding tespoint files in '/opt/rtcds/caltech/c1/target/gds/param/'
  • Created systemd environment file for each front-end in '/diskless/root/etc/advligorts/' containing the argument for local data concentrator and daq data transmitter (`local_dc_args` and `cps_xmit_args`). We currently have staggered the delay (-D waitValue) times of the front-ends by setting it to the last number in the daq ip address when we were facing timing glitch issues, but should probably set it back to zero to see if it has any effect.

Other:

  • Edited /etc/resolv.conf on fb1 and 'diskless/root' to enable name resolution via for example `host c1shimmer` but the file gets overwritten on chiara for some reason

Issues:

  1. Frame writing is not working at the moment. It did at some point in the past for a couple of days but stopped working earlier today and we can't quite figure out why. 
  2. We can't get data via diaggui or ndscope either. Again, we recall the working in the past too but not sure why it has stopped working now.   
  3. The cpu load on c1su2 is too high so we should split into two models
  4. We still get the occassional IPC glitch both for shared memory and dolphin, see attachments
Attachment 1: dolphin_state_all_green.png
dolphin_state_all_green.png
Attachment 2: dolphin_state_IPC_glitch.png
dolphin_state_IPC_glitch.png
  17157   Fri Sep 23 19:04:12 2022 AnchalUpdateBHDBH55 LSC Model Updates - part III

BH55

I further updated LSC model today with following changes:

  • BH55 whitening switch binary output signal is now routed to correct place.
    • Switching FM1 which carries dewhitening digital filter will always switch on corresponding analog whitening before ADC input.
  • The whitening can be triggered using LSC trigger matrix as well.
  • The ADC_0 input to LSC subsystem is now a single input and channels are separated inside the subsystem.

The model built and installed with no issues.

Further, the slow epics channels for BH55 anti-aliasing switch and whitening switch were added in /cvs/cds/caltech/target/c1iscaux/C1_ISC-AUX_LSCPDs.db


IPC issue resolved

The IPC issue that we were facing earlier is resolved now. The BH55_I and BH55_Q signal after phase rotation is successfully reaching c1hpc model where it can be used to lock LO phase. To resolve this issue, I had to restart all the models. I also power cycled the LSC I/O chassis during this restart as Tega suspected that such a power cycle is required while adding new dolphin channels. But there is no way to find out if that was required or not. Good news is that with the new cds upgrade, restarting rtcds models will be much easier and modular.


ETMY Watchdog Updated

[Anchal, Tega]

Since ETMY does not use HV coil driver anymore, the watchdog on ETMY needs to be similar to other new optics. We made these updated today. Now ETMY watchdog while slowly ramps down the alignment offsets when it is tripped.

  17156   Fri Sep 23 18:31:46 2022 ranaUpdateBHDBH55 RFPD installed - part I

A design flaw in these initial LIGO RFPDs is that the SMA connector is not strain releieved by mounting to the case. Since it is only mounted to the tin can, when we attach/remove cables, it bends the connector, causing stress on the joint.

To get around this, for this gold box RFPD, connect the SMA connector to the PCB using a S shaped squiggly wire. Don't use multi-strand: this is usually good, since its more flexible, but in this case it affects the TF too much. Really, it would be best to use a coax cable, but a few-turns cork-screw, or pig-tail of single-core wire should be fine to reduce the stress on the solder joint.

Quote:
 

Later Anchal noticed that there was no RFPD output (C1:LSC-BH55_I_ERR, C1:LSC-BH55_Q_ERR). I took out the RFPD and opened it up, and the RF OUT SMA to PCB connection wire was broken [Attachment 2]. I re-soldered the wire and closed up the box [Attachment 3]. After placing the RFPD back, we noticed spikes in C1:LSC-BH55_I_ERR and C1:LSC-BH55_Q_ERR channels on ndscope. We suspect there is still a loose connection, so I will revisit the RFPD circuit on Monday. 

 

  17155   Fri Sep 23 14:10:19 2022 RadhikaUpdateBHDBH55 RFPD installed - part I

[Radhika, Paco, Anchal]

I placed a lens in the B-beam path to focus the beam spot onto the RFPD [Attachment 1]. To align the beam spot onto the RFPD, Anchal misaligned both ETMs and ITMY so that the AS and LO beams would not interfere, and the PD output would remain at some DC level (not fringing). The RFPD response was then maximized by scanning over pitch and yaw of the final mirror in the beam path (attached to the RFPD).

Later Anchal noticed that there was no RFPD output (C1:LSC-BH55_I_ERR, C1:LSC-BH55_Q_ERR). I took out the RFPD and opened it up, and the RF OUT SMA to PCB connection wire was broken [Attachment 2]. I re-soldered the wire and closed up the box [Attachment 3]. After placing the RFPD back, we noticed spikes in C1:LSC-BH55_I_ERR and C1:LSC-BH55_Q_ERR channels on ndscope. We suspect there is still a loose connection, so I will revisit the RFPD circuit on Monday. 

Attachment 1: IMG_3766.jpeg
IMG_3766.jpeg
Attachment 2: IMG_3770.jpeg
IMG_3770.jpeg
Attachment 3: IMG_3773.jpeg
IMG_3773.jpeg
  17154   Fri Sep 23 10:05:38 2022 JCUpdateVACN2 Interlocks triggered

[Chub, Anchal, Tega, JC]

After replacing an empty tank this morning, I heard a hissing sound coming from the nozzle area. It turns out that this was from the copper tubing. The tubing we slightly broken and this was comfirmed with soapy water bubbles. This caused the N2 pressure to drop and the Vac interlocks to be triggered. Chub and I went ahead and replaced the fitting in connected this back to normal. Anchal and Tega have used the Vacuum StartUp procedures to restore the vacuum to normal operation.

Adding screenshot as the pressure is decreasing now.

Attachment 1: Screenshot_2022-09-23_10-19-39.png
Screenshot_2022-09-23_10-19-39.png
Attachment 2: Screenshot_2022-09-23_10-22-45.png
Screenshot_2022-09-23_10-22-45.png
  17153   Thu Sep 22 20:57:16 2022 TegaUpdateComputersbuild, install and start 40m models on teststand

[Tega, Chris]

We built, installed and started all the 40m models on the teststand today. The configuration we employ is to connect c1sus to the teststand I/O chassis and use dolphin to send the timing to other frontends. To get this far, we encounterd a few problems that was solved by doing the following:

0. Fixed frontend timing sync to FB1 via ntp

1. Set the rtcds enviroment variable `CDS_SRC=/opt/rtcds/userapps/trunk/cds/common/src` in the file '/etc/advligorts/env'

2. Resolved chgrp error during models installation using sticky bits on chiara, i.e. `sudo chmod g+s -R /opt/rtcds/caltech/c1/target`

3. Replaced `sqrt` with `lsqrt` in `RMSeval.c` to eliminate compilation error for c1ioo

4. Created a symlink for 'activateDQ.py' and 'generate_KisselButton.py' in '/opt/rtcds/caltech/c1/post_build'

5. Installed and configured dolphin for new frontend 'c1shimmer'

6. Replaced 'RFM0' with 'PCIE' in the ipc file, '/opt/rtcds/caltech/c1/chans/ipc/C1.ipc'

 

We still have a few issues namely:

1. The user models are not running smoothly. the cpu usage jumps to its maximum value every second or so.

2. c1omc seems to be unable to get its timing from its IOP model (Issue resolved by changing the CDS block parameter 'specific_cpu' from 6 to 4 bcos the new FEs only have 6 cores, 0-5)

3. The need to load the `dolphin-proxy-km` library and start the `rts-dolphin_daemon` service whenever we reboot the front-end

Attachment 1: dolphin_state_plus_c1shimmer.png
dolphin_state_plus_c1shimmer.png
Attachment 2: FE_status_overview.png
FE_status_overview.png
  17152   Thu Sep 22 19:51:58 2022 AnchalUpdateBHDBH55 LSC Model Updates - part II

I updated follwoing in teh rtcds models and medm screens:

  • c1lsc
    • Added reading of ADC0_20 and ADC0_21 as demodulated BHD output at 55 MHz, I and Q channels.
    • Connected BH55_I and BH55_Q to phase rotation and creation of output channels.
    • Replaced POP55 with BH55 in the RFPD input matrix.
    • Send BH55_I and BH55_Q over IPC to c1hpc
    • Added BH55 RFPD model in LSC screen, in RFPD input matrix, whitening box. Some work is still remaining.
  • c1hpc
    • Added recieving BH55_I and BH55_Q.
    • Added BH55_I and BH55_Q to sensing matrix through filter modules. Now these can be used to control LO phase.
    • Added BH55 signals to the medm screen.
  • c1scy
    • Updated SUS model to new sus model that takes care of data acquisition rates and also adds BIASPOS, BIASPIT and BIASYAW filter modules at alignment sliders.

Current state:

  • All models built and installed without any issue or error.
  • On restarting all models, I first noticed 0x2000 error on c1lsc, c1scy and c1hpc. But these errors went away with doing daqd restart on fb1.
  • BH55 FM buttons are not connected to antialiasing analog filter. Need to do this and update medm screen accordingly.
  • The IPC from c1lsc to c1hpc is not working. One sender side, it does not show any signal which needs to be resolved.
  17151   Wed Sep 21 17:16:14 2022 TegaUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone

[Tega, JC]

We laid 4 out of 6 fiber cables today. The remaining 2 cables are for the I/O chassis on the vertex so we would test the cables the lay it tomorrow. We were also able to identify the problems with the 2 supposedly faulty cable, which are not faulty. One of them had a small bend in the connector that I was able to straighten out with a small plier and the other was a loose connection in the switch part. So there was no faulty cable, which is great! Chris wrote a matlab script that does the migration of all the model files. I am going through them, i.e. looking at the CDS parameter block to check that all is well. Next task is to build and install the updated models. Also need to update the '/opt/rtcds' and '/opt/rtapps' directory to the latest in the 40m chiara system.

 

  17150   Wed Sep 21 17:01:59 2022 PacoUpdateBHDBH55 RFPD installed - part I

[Radhika, Paco]

Optical path setup

We realized the DCPD - B beam path was already using a 95:5 beamsplitter to steer the beam, so we are repurposing the 5% pickoff for a 55 MHz RFPD. For the RFPD we are using a gold RFPD labeled "POP55 (POY55)" which was on the large optical table near the vertex. We have decided to test this in-situ because the PD test setup is currently offline.

Radhika used a Y1-1025-45S mirror to steer the B-beam path into the RFPD, but a lens should be added next in the path to focus the beam spot into the PD sensitive area. The current path is illustrated by Attachment #1.

We removed some unused OPLEV optics to make room for the RFPD box, and these were moved to the optics cabinet along Y-arm [Attachment #2].

 


[Anchal, Yehonathan]

PD interfacing and connections

In parallel to setting up the optical path configuration in the ITMY table, we repurposed a DB15 cable from a PD interface board in the LSC rack to the RFPD in question. Then, an SMA cable was routed from the RFPD RF output to an "UNUSED" I&Q demod board on the LSC rack. Lucky us, we also found a terminated REFL55 LO port, so we can draw our demod LO from there. There are a couple (14,15,20,21) ADC free inputs after the WF2 and WF3 whitening filter interfaces.


Next steps

  • Finish alignment of BH55 beam to RFPD
  • Test RF output of RFPD once powered
  • Modify LSC model, rebuild and restart
Attachment 1: IMG_3760.jpeg
IMG_3760.jpeg
Attachment 2: IMG_3764.jpeg
IMG_3764.jpeg
  17149   Wed Sep 21 10:10:22 2022 YehonathanUpdateCDSC1SU2 crashed

{Yehonathan, Anchal}

Came this morning to find that all the BHD optics watchdogs tripped. Watchdogs were restored but the all ADCs were stuck.

We realized that the C1SU2 model crashed.

We run /scripts/cds/restartAllModels.sh to reboot all machines. All the machines rebooted and burt restored to yesterday around 5 PM.

The optics seem to have returned to good alignment and are damped.

  17148   Tue Sep 20 23:06:23 2022 TegaUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone

[Tega, Radhika, JC]

We wired the front-ends for power, DAQ and martian network connections. Then moved the I/O chassis from the buttom of the rack to the middle just above the KVM switch so we can leave the top og the I/O chassis open for access to the ports of OSS target adapter card for testing the extension fiber cables.

Attachment 1 (top -> bottom)

c1sus2

c1iscey

c1iscex

c1ioo

c1sus

c1lsc


When I turned on the test stand with the new front-ends, after a few minutes, the power to 1x7 was cut off due to overloading I assume. This brought down nodus, chiara and FB1. After Paco reset the tripped switch, everything came back without us actually doing anything, which is an interesting observation.


After this event, I moved the test stand power plug to the side wall rail socket. This seems fine so far. I then brought chiara (clone) and FB1 (clone) online. Here are some changes I made to get things going:

Chiara (clone)

  • Edited '/etc/dhcp/dhcpd.conf' to update the MAC address of the front-ends to match the new machines, then run
  • sudo service isc-dhcp-server restart
  • then restart front-ends
  • Edited '/etc/hosts' on chiara to include c1iscex and c1iscey as these were missing

 

FB1 (clone)

Getting the new front-ends booting off FB1 clone:

1. I found that the KVM screen was flooded with setup info about the dolphin cards on the LLO machines. This actually prevented login using the KVM switch for two of these machines.  Strangely, one of them 'c1sus' seemed to be fine, see attachment 2, so I guessed this was bcos the dolphin network was already configured earlier when we were testing the dolphin communications. So I decided to configure the remaining dolphin cards. To do so, we do the following

Dolphin Configuration:

1a. Ideally running

sudo /opt/DIS/sbin/dis_mkconf -fabrics 1 -sclw 8 -stt 1 -nodes c1lsc c1sus c1ioo c1iscex c1iscey c1sus2 -nosessions

should set up all the nodes, but this did not happen. In fact, I could no longer use the '/opt/DIS/sbin/dis_admin' GUI after running this operation and restarting the 'dis_networkmgr.service' via

sudo systemctl restart dis_networkmgr.service

so  I logged into each front-end and configured the dolphin adapter there using

sudo /opt/DIS/sbin/dis_config

After which I shut down FB1 (clone) bcos restarting it earlier didn't work, I waited a few minutes and then started it.  Everything was fine afterward, although I am not quite sure what solved the issue as I tried a few things and I was glad to see the problem go!

1b. I later found after configuring all the dolphin nodes that 2 of them failed the '/opt/DIS/sbin/dis_diag' test with an error message suggesting three possible issues of which one was 'faulty cable'. I looked at the units in question and found that swapping both cables with the remaining spares solved the problem. So it seems like these cables are faulty (need to double-check this). Attachment 3 shows the current state of the dolphin nodes on the front-ends and the dolphin switch.


2. I noticed that the NFS mount service for the mount points '/opt/rtcds' and '/opt/rtapps' in /etc/fstab exited with an error, so I ran 

sudo mount -a

3. edit '/etc/hosts' to include c1iscex and c1iscey as these were missing

 

Front-ends

To test the PCIe extension fiber cables that connect the front-ends to their respective I/O chassis, we run the following command (after booting the machine with the cable connected): 

controls@c1lsc:~$ lspci -vn | grep 10b5:3
    Subsystem: 10b5:3120
    Subsystem: 10b5:3101

If we see the output above, then both the cable and OSS card are fine (We know from previous tests that the OSS card on the I/O chassis is good). Since we only have one I/O chassis, we repeat the step above 8 times, also cycling through the six new front-end as we go so that we are also testing the installed OSS host adapter cards. I was able to test 4 cables and 4 OSS host cards (c1lsc, c1sus, c1ioo, c1sus2), but the remaining results were inconclusive (i.e. it seems to suggest that 3 out of the remaining 5 fiber cables are faulty, which in itself would be considered unfortunate but I found the reliability if the test to be in question when I went back to test the functionality to the 2 remaining OSS host cards using a cable that passed the test earlier and it didn't pass. After a few retries, I decided to call it a day b4 I lose my mind) and need to be redone again tomorrow.

 

Note: We were unable to lay the cables today bcos these tests were not complete, so we are a bit behind the plan. Would see if we can catch up tomorrow.

 

Quote:

Plan for the remainder of the week

Tuesday

  • Setup the 6 new front-ends to boot off the FB1 clone.
  • Test PCIe I/O cables by connecting them btw the front-ends and teststand I/O chassis one at a time to ensure they work
  • Then lay the fiber cables to the various I/O chassis.

 

Attachment 1: IMG_20220921_084220465.jpg
IMG_20220921_084220465.jpg
Attachment 2: dolphin_err_init_state.png
dolphin_err_init_state.png
Attachment 3: dolphin_final_state.png
dolphin_final_state.png
  17147   Tue Sep 20 18:18:07 2022 AnchalSummarySUSETMX, ETMY damping loop gain tuning

[Paco, Anchal]

We performed local damping loop tuning for ETMs today to ensure all damping loops' OLTF has a Q of 3-5. To do so, we applied a step on C1:SUS-ETMX/Y_POS/PIT/YAW_OFFSET, and looked for oscillations in the error point of damping loops (C1:SUS-EMTX/Y_SUSPOS/PIT/YAW_IN1) and increased or decreased gains until we saw 3-5 oscillations before the error signal stabilizes to a new value. For side loop, we applied offset at C1:SUS-ETMX/Y_SDCOIL_OFFSET and looked at C1:SUS-ETMX/Y_SUSSIDE_IN1. Following are the changes in damping gains:

C1:SUS-ETMX_SUSPOS_GAIN : 61.939   ->   61.939
C1:SUS-ETMX_SUSPIT_GAIN :   4.129     ->   4.129
C1:SUS-ETMX_SUSYAW_GAIN : 2.065     ->   7.0
C1:SUS-ETMX_SUSSIDE_GAIN : 37.953  ->   50

C1:SUS-ETMY_SUSPOS_GAIN : 150.0     ->   41.0
C1:SUS-ETMY_SUSPIT_GAIN :   30.0       ->   6.0
C1:SUS-ETMY_SUSYAW_GAIN : 30.0       ->   6.0
C1:SUS-ETMY_SUSSIDE_GAIN : 50.0      ->   300.0

 

  17146   Tue Sep 20 15:40:07 2022 yehonathanUpdateBHDTrying doing AC lock

We resume the LO phase locking work. MICH was locked with an offset of 80 cts. LO and AS beams were aligned to maximize the BHD readout visibility on ndscope.

We lock the LO phase on a fringe (DC locking) actuating on LO1.

Attachment 1 shows BHD readout (DCPD_A_ERR = DCPD_A - DCPD_B) spectrum with and without fringe locking while LO2 line at 318 Hz is on. It can be seen that without the fringe locking the dithering line is buried in the A-B noise floor. This is probably due to multiple fringing upconversion. We figured that trying to directly dither-lock the LO phase might be too tricky since we cannot resolve the dither line when the LO phase is unlocked.

We try to handoff the lock from the fringe lock to the AC lock in the following way: Since the AC error signal reads the derivative of the BHD readout it is the least sensitive to the LO phase when the LO phase is locked on a dark fringe, therefore we offset the LO to realize an AC error signal. LO phase offset is set to ~ 40 cts (peak-to-peak counts when LO phase is uncontrolled is ~ 400 cts).

We look at the "demodulated" signal of LO1 from which the fringe locking error signal is derived (0 Hz frequency modulation 0  amplitude) and the demodulated signal of LO2 where a ~ 700 Hz line is applied. We dither the LO phase at ~ 50Hz to create a clear signal in order to compare the two error signals. Although the 50 Hz signal was clearly seen on the fringe lock error signal it was completely unresolved in the LO2 demodulated signal no matter how hard we drove the 700Hz line and no matter what demodulation phase we chose. Interestingly, changing the demodulation phase shifted the noisy LO2 demodulated signal by some constant. Will post a picture later.

Could there be some problem with the modulation-demodulation model? We should check again but I'm almost certain we saw the 700Hz line with an SNR of ~ 100 in diaggui, even with the small LO offset changes in the 700Hz signal phase should have been clearly seen in the demodulated signal. Maybe we should also check that we see the 50Hz side-bands around the 700Hz line on diaggui to be sure.

Attachment 1: Screenshot_2022-09-20_15-38-44.png
Screenshot_2022-09-20_15-38-44.png
  17145   Tue Sep 20 07:03:04 2022 PacoSummaryGeneralPower Outage 220916 -- restored all

[JC, Tega, Paco ]

I would like to mention that during the Vacuum startup, after the AUX pump was turned on, Tega and I were walking away while the pressure decreases. While we were, valves opened on their own. Nobody was near the VAC Desktop during this. I asked Koji if this may be an automatic startup, but he said the valves shouldn't open unless they are explicitely told to do so. Has anyone encountered this before?

Quote:

Restore lab

[Paco, Tega, JC, Yehonathan]

We followed the instructions here. There were no major issues, apart from the fb1 ntp server sync taking long time after rebooting once.


ETMY damping

[Yehonathan, Paco]

We noticed that ETMY had to much RMS motion when the OpLevs were off. We played with it a bit and noticed two things: Cheby4 filter was on for SUS_POS and the limiter on ULCOIL was on at 0 limit. We turned both off.

We did some damping test and observed that the PIT and YAW motion were overdamped. We tune the gain of the filters in the following way:

SUSSIDE_GAIN 1250->50

SUSPOS_GAIN 200->150

SUSYAW_GAIN 60->30

These action seem to make things better.

 

  17144   Mon Sep 19 20:21:06 2022 TegaUpdateComputers1X7 and 1X6 work

[Tega, Paco, JC]


We moved the GPS network time server and the Frequency distribution amplifier from 1X7 to 1X6 and the PEM AA, ADC adapter and Martian network switch from 1X6 to 1X7. Also mounted the dolphin IX switch at the rear of 1X7 together with the DAQ and martian switches. This cleared up enough space to mount all the front-ends, however, we found that the mounting brackets for the frontends do not fit in the 1X7 rack, so I have decided to mount them on the upper part of the test stand for now while we come up with a fix for this problem. Attachments 1 to 3 show the current state of racks 1X6, 1X7 and the teststand.

 

Attachment 1: Front of racks 1X6 and 1X7

Attachment 2: Rear of rack 1X7

Attachment 3: Front of teststand rack


Plan for the remainder of the week

Tuesday

  • Setup the 6 new front-ends to boot off the FB1 clone.
  • Test PCIe I/O cables by connecting them btw the front-ends and teststand I/O chassis one at a time to ensure they work
  • Then lay the fiber cables to the various I/O chassis.

Wednesday

  • Migrate the current models on the 6 front-ends to the new system.
  • Replace RFM IPC parts with dolphin IPC parts in c1rfm model running c1sus machine
  • Replace the RFM parts in c1iscex and c1iscey models
  • Drop c1daf and c1oaf models from c1isc machine, since the front-ends have only have 6 cores
  • Build and install models

Thursday [CAN I GET THE IFO ON THIS DAY PLEASE?]

  • Complete any remaining model work
  • Connect all I/O chassis to their respective (new) front-end and see if we can start the models (Need to think of a safe way to do this. Should we disconnect coil drivers b4 starting the models?)

Friday

  • Tie-up any loose ends
Attachment 1: IMG_20220919_204013819.jpg
IMG_20220919_204013819.jpg
Attachment 2: IMG_20220919_203541114.jpg
IMG_20220919_203541114.jpg
Attachment 3: IMG_20220919_203458952.jpg
IMG_20220919_203458952.jpg
  17143   Mon Sep 19 17:02:57 2022 PacoSummaryGeneralPower Outage 220916 -- restored all

Restore lab

[Paco, Tega, JC, Yehonathan]

We followed the instructions here. There were no major issues, apart from the fb1 ntp server sync taking long time after rebooting once.


ETMY damping

[Yehonathan, Paco]

We noticed that ETMY had to much RMS motion when the OpLevs were off. We played with it a bit and noticed two things: Cheby4 filter was on for SUS_POS and the limiter on ULCOIL was on at 0 limit. We turned both off.

We did some damping test and observed that the PIT and YAW motion were overdamped. We tune the gain of the filters in the following way:

SUSSIDE_GAIN 1250->50

SUSPOS_GAIN 200->150

SUSYAW_GAIN 60->30

These action seem to make things better.

  17142   Thu Sep 15 21:12:53 2022 PacoUpdateBHDLO phase "dc" control

Locked the LO phase with a MICH offset=+91. The LO is midfringe (locked using the A-B zero crossing), so it's far from being "useful" for any readout but we can at least look at residual noise spectra.

I spent some time playing with the loop gains, filters, and overall lock acquisition, and established a quick TF template at Git/40m/measurements/BHD/HPC_LO_PHASE_TF.xml

So far, it seems that actuating on the LO phase through LO2 POS requires 1.9 times more strength (with the same "A-B" dc sensing). After closing the loop by FM4, and FM5, actuating on LO2 with a filter gain of 0.4 closes the loop robustly. Then, FM3 and FM6 can be enabled and the gain stepped up to 0.5 without problem. The measured UGF (Attachment #1) here was ~ 20 Hz. It can be increased to 55 Hz but then it quickly becomes unstable. I added FM1 (boost) to the HPC_LO_PHASE bank but didn't get to try it.

The noise spectra (Attachment #2) is still uncalibrated... but has been saved under Git/40m/measurements/BHD/HPC_residual_noise_spectra.xml

Attachment 1: lophase_oltf.pdf
lophase_oltf.pdf
Attachment 2: lophase_noise_spectra.pdf
lophase_noise_spectra.pdf
  17141   Thu Sep 15 16:19:33 2022 YehonathanUpdateLSCPOX-POY noise budget

Doing POX-POY noise measurement as a poor man's FPMI for diagnostic purposes. (Notebook in /opt/rtcds/caltech/c1/Git/40m/measurements/LSC/POX-POY/Noise_Budget.ipynb)

The arms were locked individually using POX11 and POY11. The optical gain was estimated to be by looking at the PDH signal of each arm: the slope was computed by taking the negative peak to positive peak counts and assuming that the arm length change between those peaks is lambda/(2*Finesse), where lambda = 1um and the arm finesse is taken to be 450.

Xarm peak-to-peak counts is ~ 850 while Yarm's is ~ 1100. This gives optical gains of 3.8e11 cts/m and 4.95e11 cts/m respectively.

Next, ETMX actuation TF is measured (attachments 1,2) by exciting C1:LSC-ETMX/Y_EXC and measuring at C1:LSC-X/YARM_IN1_DQ and calibrating with the optical gain.

Using these calibrations I plot the POX-POY (attachment 3) and POX+POY (attachment 4) total noise measurements using two methods:

1. Plotting the calibrated IN and OUT channels of XARM-YARM (blue and orange). Those two curves should cross at the UGF (200Hz in this case).

2. Plotting the calibrated XARM-YARM IN channels times 1-OLTF (black).

The UGF bump can be clearly seen above the true noise in those plots.

However, POX+POY OUT channel looks too high for some reason making the crossing frequency between IN and OUT channels to be ~ 300Hz. Not sure what was going on with this.

Next, I will budget this noise with the individual noise contributions.

Attachment 1: XARM_Actuation_Plot.pdf
XARM_Actuation_Plot.pdf
Attachment 2: YARM_Actuation_Plot.pdf
YARM_Actuation_Plot.pdf
Attachment 3: Sensitivity_Plot_1347315385.pdf
Sensitivity_Plot_1347315385.pdf
  17140   Thu Sep 15 11:13:32 2022 AnchalSummaryASSYARM and XARM ASS restored

With limited proof of working for a few times (but robustly), I'm happy to report that ASS on YARM and XARM is working now.


What is wrong?

The issue is that PR3 is not placed in correct position in the chamber. It is offset enough that to send a beam through center of ITMY to ETMY, it has to reflect off the edge of PR3 leading to some clipping. Hence our usual ASS takes us to this point and results in loss of transmission due to clipping.

Solution: We can not solve this issue without moving PR3 inside the chamber. But meanwhile, we can find new spot positions on ITMY and ETMY, off the center in YAW direction only, which would allow us to mode match properly without clipping. This would mean that there will be YAW suspension noise to Length coupling in this cavity, but thankfully, YAW degree of freedom stays relatively calm in comparison to PIT or POS for our suspensions. Similarly, we need to allow for an offset in ETMX beam spot position in YAW. We do not control beam spot position on ITMX due to lack of enough actuators to control all 8 DOFs involved in mode matching input beam with a cavity. So instead I found the right offset for ITMX transmission error signal in YAW that works well.

I found these offsets (found empirically) to be:

  • C1:ASS-YARM_ETM_YAW_L_DEMOD_I_OFFSET: 22.6
  • C1:ASS-YARM_ITM_YAW_L_DEMOD_I_OFFSET: 4.2
  • C1:ASS-XARM_ETM_YAW_L_DEMOD_I_OFFSET: -7.6
  • C1:ASS-XARM_ITM_YAW_T_DEMOD_I_OFFSET: 1

These offsets have been saved in the burt snap file used for running ASS.


Using ASS

I'll reiterate here procedure to run ASS.

  • Get YARM locked to TEM00 mode and atleast 0.4 transmission on C1:LSC-TRY_OUT
  • Open sitemap->ASC->c1ass
  • Click ! Scripts YARM -> Striptool to open a striptool monitor for ASS error signals.
  • Click on ! Scripts YARM -> Dither ON to switch on the dither.
  • Wait for all error signals to have settled around zero (this should also maximize the transmission channel (currently maximizing to 1.1).
  • Click on ! Scripts YARM -> Freeze Offsets
  • Click on ! Scripts YARM -> Offload Offsets
  • Click on ! Scripts YARM -> Dither OFF.
  • Then proceed to XARM. Get it locked to TEM00 mode and atleast 0.4 transmission on C1:LSC-TRX_OUT
  • Open sitemap->ASC->c1ass
  • Click ! Scripts XARM -> Striptool to open a striptool monitor for ASS error signals.
  • Click on ! Scripts XARM -> Dither ON to switch on the dither.
  • Wait for all error signals except C1:ASS-XARM_ITM_PIT_L_DEMOD_I_OUT16 and C1:ASS-XARM_ITM_YAW_L_DEMOD_I_OUT16 to have settled around zero (this should also maximize the transmission channel (currently maximizing to 1.1).
  • Click on ! Scripts XARM -> Freeze Offsets
  • Click on ! Scripts XARM -> Offload Offsets
  • Click on ! Scripts XARM -> Dither OFF.
  17139   Wed Sep 14 15:40:51 2022 JCUpdateTreasurePlastic Containers

There are brand new empty plastic containers located inside the shed that is outside in the cage. These can be used for organizing new equipment for CDS, or cleanup after Wednesday meetings

Attachment 1: B0DD2BEC-E57E-4AA2-8672-2ABB41F44F84.jpeg
B0DD2BEC-E57E-4AA2-8672-2ABB41F44F84.jpeg
  17138   Tue Sep 13 14:12:03 2022 YehonathanUpdateBHDTrying LO phase locking again

[Paco, Yehonathan]

Summary:  We locked LO phase using the DC PD (A - B) error point without saturating the control point, i.e. not a "bang bang" control.


Some suspensions were improved so we figure we should go back to trying to lock the LO phase.

We misalign ETMs and lock MICH using AS55. We put a small MICH offset by putting C1:LSC-MICH_OFFSET = -80.

AS and LO beams were aligned to overlap by maximizing the BHD signal visibility.

BHD DCPDs were balanced by misaligning the AS beam and using the LO beam only.

We measure the transfer function between the DCPDs and find the coherence is 1 at 1 Hz (because of seismic motion) so we measure the ratio between them to be 0.3db.

AS beam is aligned again to overlap with the LO beam. For the work below, we use the largest MICH OFFSET we could impinge before losing the lock = +90. This has the effect of increasing our optical gain.

We started using the HPC LOCK IN screen to dither POS on the different BHD SUS. We first started with AS1 (freq = 137.137 Hz, gain = 1000). The sensing matrix element was chosen accordingly (from the demodulated output) and fed to the LO_PHASE; because this affected the AS port alignment this was of course not the best choice. We moved over to LO2 (freq = 318.75 Hz, gain = 1000) but for the longest time couldn't see the dither line at the error point (A-B).

After this we added comb60 notch filters at DCPD_A and DCPD_B input signals. We ended up just feeding the (A-B) error point to LO1, and trying to lock mid fringe, which suceeded without saturation. The gain of the LO_PHASE filter was set to 0.2 (previously 20; attributable to the newly unclipped LO beam intensity?), and again we only enabled FM4 and FM5 for this. After this a dither line at 318.75 Hz finally appeared in the A-B error point! To be continued...

Attachment 1: Screenshot_2022-09-13_17-41-33.png
Screenshot_2022-09-13_17-41-33.png
  17137   Thu Sep 8 16:03:25 2022 YehonathanUpdateLSCRealignment, arm locking, gains adjustments

{Anchal, Yehonathan}

We came this morning and the IMC was misaligned. The IMC was realigned and locked. This of course changed the input beam and sent us down to a long alignment journey.

We first use TTs to find beam on BHD DCPD/Camera since it is only single bounce on all optics.

Then, PR2/3 were used to find POP beam while keeping the BHD beam.

Unfortunately, that was not enough. TTs and PRs have some degeneracy which caused us to lose the REFL beam.

Realizing this we went to AS table to find the REFL beam. We found a ghost beam that decieved us for a while. Realizing it was a ghost beam, we moved TT2 in pitch, while keeping the POP DCPD high with PRs, until we saw a new beam on the viewing card.

We kept aligning TT1/2, PR2/3 to maximize the REFL DCPD while keeping the POP DCPD high. We tried to look at the REFL camera but soon realized that the REFL beam is too weak for the camera to see.

At that point we already had some flashing in the arms (we centered the OpLevs in the beginning).

Arms were aligned and locked. We had some issue with the X-ARM not catching lock. We increased the gain and it locked almost immediately. To fix the arms gains correctly we took OLTFs (Attachment) and adjusted the XARM gain to 0.027 to make the UGF at 200Hz.


Both arms locked with 200 Hz UGF from:

From GPS: 1346713049
    To GPS: 1346713300

From GPS: 1346713380
    To GPS: 1346714166

HEPA turned off:
From GPS: 1346714298
    To GPS: 1346714716

 

  17136   Thu Sep 8 12:01:02 2022 JCConfigurationLab OrganizationLab Organization

The floor cable cover has been changed out for a new one. This is in Section X11.

Attachment 1: F41AD1DA-29E9-4449-99CB-5F43AE527CA6_1_105_c.jpeg
F41AD1DA-29E9-4449-99CB-5F43AE527CA6_1_105_c.jpeg
Attachment 2: FF5F2CE8-85E8-4B6F-8F8A-9045D978F670.jpeg
FF5F2CE8-85E8-4B6F-8F8A-9045D978F670.jpeg
  17135   Thu Sep 8 11:54:37 2022 JCConfigurationLab OrganizationLab Organization

The arms in the 40m laboratory have now been sectioned off. Each arm has been divided up into 15 sections. Along the Y arm, the section are labelled "Section Y1 - Section Y15". For the X arm, they are labelled "Section X1- Section X15". Anything changed or moved will now be updated into the elog with their appropriate section.

 

Below is an example of Section X6.

Attachment 1: 1A7026BC-82A9-49E9-BA22-1A700DFEC5D2.jpeg
1A7026BC-82A9-49E9-BA22-1A700DFEC5D2.jpeg
Attachment 2: 2A904809-82F0-40C0-B907-B48C3A0E789E.jpeg
2A904809-82F0-40C0-B907-B48C3A0E789E.jpeg
Attachment 3: CB4B8591-B769-454D-9A16-EE9176004099.jpeg
CB4B8591-B769-454D-9A16-EE9176004099.jpeg
  17134   Wed Sep 7 14:32:15 2022 AnchalUpdateSUSUpdated SD coil gain to keep all coil actuation signals digitally same magnitude

The coil driver actuation strength for face coils was increased by 13 times in LO1, LO2, SR2, AS1, AS4, PR2, and PR3.

After the change the damping strenghth of POS, PIT, and YAW were reduced, but not SIDE coil output filter module requires higher digital input to cause same force at the output. This wouldn't be an issue until we try to correct for cross coupling at output matrix where we would want to give similar order of magnitude coefficients for SIDE coil as well. So I did the following changes to make input to all coil output filters (Face and side) same for these particular suspensions:

  • C1:SUS-LO1_SUSSIDE_GAIN 40.0 -> 3.077
    C1:SUS-AS1_SUSSIDE_GAIN 85.0 -> 6.538
    C1:SUS-AS4_SUSSIDE_GAIN 41.0 -> 3.154
    C1:SUS-PR2_SUSSIDE_GAIN 150.0 -> 11.538
    C1:SUS-PR3_SUSSIDE_GAIN 100.0 -> 7.692
    C1:SUS-LO2_SUSSIDE_GAIN 50.0 -> 3.846
    C1:SUS-SR2_SUSSIDE_GAIN 140.0 -> 10.769
  • C1:SUS-LO1_SDCOIL_GAIN -1.0 -> -13.0
    C1:SUS-AS1_SDCOIL_GAIN 1.0 -> 13.0
    C1:SUS-AS4_SDCOIL_GAIN -1.0 -> -13.0
    C1:SUS-PR2_SDCOIL_GAIN -1.0 -> -13.0
    C1:SUS-PR3_SDCOIL_GAIN -1.0 -> -13.0
    C1:SUS-LO2_SDCOIL_GAIN -1.0 -> -13.0
    C1:SUS-SR2_SDCOIL_GAIN -1.0 -> -13.0

In short, now 10 cts of input to C1:SUS-AS1_ULCOIL would create same actuation on UL as 10 cts of input to C1:SUS-AS1_SDCOIL will on SD.


In reply to

Quote: http://nodus.ligo.caltech.edu:8080/40m/16802

[Koji, JC]

Coil Drivers LO2, SR2, AS4, and AS1 have been updated a reinstalled into the system. 

LO2 Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        Unit: S2100008

LO2 Coil Driver 2 (LR/SD)now has R=100 // 1.2k ~ 92Ohm for CH3                    Unit: S2100530

SR2 Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        Unit: S2100614

SR2 Coil Driver 2 (LR/SD)now has R=100 // 1.2k ~ 92Ohm for CH3                    Unit: S2100615

AS1 Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        Unit: S2100610

AS1 Coil Driver 2 (LR/SD)now has R=100 // 1.2k ~ 92Ohm for CH3                    Unit: S2100611

AS4 Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        Unit: S2100612

AS4 Coil Driver 2 (LR/SD)now has R=100 // 1.2k ~ 92Ohm for CH3                    Unit: S2100613

 

Quote: http://nodus.ligo.caltech.edu:8080/40m/16791

[JC Koji]

To give more alignment ranges for the SUS alignment, we started updating the output resistors of the BHD SUS coil drivers.
As Paco has already started working on LO1 alignment, we urgently updated the output Rs for LO1 coil drivers.
LO1 Coil Driver 1 now has R=100 // 1.2k ~ 92Ohm for CH1/2/3, and LO1 Coil Driver 2 has the same mod only for CH3. JC has taken the photos and will upload/update an elog/DCC.

We are still working on the update for the SR2, LO2, AS1, and AS4 coil drivers. They are spread over the workbench right now. Please leave them as they're for a while.
JC is going to continue to work on them tomorrow, and then we'll bring them back to the rack.

 

Quote: https://nodus.ligo.caltech.edu:8081/40m/16760

[Yuta Koji]

We took out the two coil driver units for PR3 and the incorrect arrangement of the output Rs were corrected. The boxes were returned to the rack.

In order to recover the alignment of the PR3 mirror, C1:SUS_PR3_SUSPOS_INMON / C1:SUS_PR3_SUSPIT_INMON / C1:SUS_PR3_SUSYAW_INMON were monitored. The previous values for them were {31150 / -31000 / -12800}. By moving the alignment sliders, the PIT and YAW values were adjusted to be {-31100 / -12700}. while this change made the POS value to be 52340.

The original gains for PR3 Pos/Pit/Yaw were {1, 0.52, 0.2}. They were supposed to be reduced to  {0.077, 0.04, 0.015}.
I ended up having the gains to be {0.15, 0.1, 0.05}. The side gain was also increased to 50.

----

Overall, the output R configuration for PR2/PR3 are summarized as follows. I'll update the DCC.

PR2 Coil Driver 1 (UL/LL/UR) / S2100616 / PCB S2100520 / R_OUT = (1.2K // 100) for CH1/2/3

PR2 Coil Driver 2 (LR/SD) / S2100617 / PCB S2100519 / R_OUT = (1.2K // 100) for CH3

PR3 Coil Driver 1 (UL/LL/UR) / S2100619 / PCB S2100516 / R_OUT = (1.2K // 100) for CH1/2/3

PR3 Coil Driver 2 (LR/SD) / S2100618 / PCB S2100518 / R_OUT = (1.2K // 100) for CH3

 

  17133   Tue Sep 6 17:39:40 2022 PacoUpdateSUSLO1 LO2 AS1 AS4 damping loop step responses

I tuned the local damping gains for LO1, LO2, AS1, and AS4 by looking at step responses in the DOF basis (i.e. POS, PIT, YAW, and SIDE). The procedure was:

  1. Grab an ndscope with the error point signals in the DOF basis, e.g. C1:SUS-LO1_SUSPOS_IN1_DQ
  2. Apply an offset to the relevant DOF using the alignment slider offset (or coil offset for the SIDE DOF) while being careful not to trip the watchdog. The nominal offsets found for this tuning are summarized below:
Alignment/Coil Step sizes
  POS PIT YAW SIDE
LO1 800 300 300 10000
LO2 800 300 400 -10000
AS1 800 500 500 20000
AS4 800 400 400 -10000
  1. Tune the damping gains until the DOF shows a residual Q with ~ 5 or more oscillations.
  2. The new damping gains are below for all optics and their DOFs, and Attachments #1-4 summarize the tuned step responses as well as the other DOFs (cross-coupled).
Local damping gains
  POS PIT YAW SIDE
LO1 10.000 5.000 3.000 40.000
LO2 10.000 3.000 3.000 50.000
AS1 14.000 2.500 3.000 85.000
AS4 15.000 3.100 3.000 41.000

Note that during this test, FM5 has been populated for all these optics with a BounceRoll (notches at 16.6, 23.7 Hz) filter, apart from the Cheby (HF rolloff) and the 0.0:30 filters.

Attachment 1: LO1_Step_Response_Test_2022-09-06_17-19.pdf
LO1_Step_Response_Test_2022-09-06_17-19.pdf LO1_Step_Response_Test_2022-09-06_17-19.pdf LO1_Step_Response_Test_2022-09-06_17-19.pdf LO1_Step_Response_Test_2022-09-06_17-19.pdf
Attachment 2: LO2_Step_Response_Test_2022-09-06_17-30.pdf
LO2_Step_Response_Test_2022-09-06_17-30.pdf LO2_Step_Response_Test_2022-09-06_17-30.pdf LO2_Step_Response_Test_2022-09-06_17-30.pdf LO2_Step_Response_Test_2022-09-06_17-30.pdf
Attachment 3: AS1_Step_Response_Test_2022-09-06_17-53.pdf
AS1_Step_Response_Test_2022-09-06_17-53.pdf AS1_Step_Response_Test_2022-09-06_17-53.pdf AS1_Step_Response_Test_2022-09-06_17-53.pdf AS1_Step_Response_Test_2022-09-06_17-53.pdf
Attachment 4: AS4_Step_Response_Test_2022-09-06_18-16.pdf
AS4_Step_Response_Test_2022-09-06_18-16.pdf AS4_Step_Response_Test_2022-09-06_18-16.pdf AS4_Step_Response_Test_2022-09-06_18-16.pdf AS4_Step_Response_Test_2022-09-06_18-16.pdf
  17132   Tue Sep 6 09:57:26 2022 JCSummaryGeneralLab cleaning

DB9 Cables have been assorted and placed behind the Y-Arm. Long BNC Cables and Ethernet Cables have been stored under the Y-Arm. 

Quote:

We held the lab cleaning for the first time since the campus reopening (Attachment 1).
Now we can use some of the desks for the people to live! Thanks for the cooperation.

We relocated a lot of items into the lab.

  • The entrance area was cleaned up. We believe that there is no 40m lab stuff left.
    • BHD BS optics was moved to the south optics cabinet. (Attachment 2)
    • DSUB feedthrough flanges were moved to the vacuum area (Attachment 3)
  • Some instruments were moved into the lab.
    • The Zurich instrument box
    • KEPCO HV supplies
    • Matsusada HV supplies
  • We moved the large pile of SUPERMICROs in the lab. They are around MC2 while the PPE boxes there were moved behind the tube around MC2 area. (Attachment 4)
  • We have moved PPE boxes behind the beam tube on XARM behind the SUPERMICRO computer boxes. (Attachment 7)
  • ISC/WFS left over components were moved to the pile of the BHD electronics.
    • Front panels (Attachment 5)
    • Components in the boxes (Attachment 6)

We still want to make some more cleaning:

- Electronics workbenches
- Stray setup (cart/wagon in the lab)
- Some leftover on the desks
- Instruments scattered all over the lab
- Ewaste removal

 

Attachment 1: 982146B2-02E5-4C19-B137-E7CC598C262F.jpeg
982146B2-02E5-4C19-B137-E7CC598C262F.jpeg
Attachment 2: 0FBB61AC-E882-458D-A891-7B11F35588FF.jpeg
0FBB61AC-E882-458D-A891-7B11F35588FF.jpeg
  17131   Fri Sep 2 15:40:25 2022 AnchalSummaryALSDFD cable measurements

[Anchal, Yehonathan]

I laid down another temporary cable from Xend to 1Y2 (LSC rack) for also measuring the Q output of the DFD box. Then to get a quick measurement of these long cable delays, we used Moku:GO in oscillator mode, sent 100 ns pulses at a 100 kHz rate from one end, and measured the difference between reflected pulses to get an estimate of time delay. The other end of long cables was shorted and left open for 2 sets of measurements.

I-Mon Cable delay: (955+/- 6) ns / 2 = 477 +/- 3 ns

Q-Mon Cable delay: (535 +/- 6) ns / 2 = 267 +/- 3 ns

Note: We were underestimating the delay in I-Mon cable by about a factor of 2.

I also took the opportunity to take a delay time measurement of DFD delayline. Since both ends of cable were present locally, it made more sense to simply take a transfer function to get a clean delay measurement. This measurement resulted with value of 197.7 +/- 0.1 ns. See attached plot. Data and analysis here.

Attachment 1: ICableOpenEnd_2022-09-02_3_08_34_PM.png
ICableOpenEnd_2022-09-02_3_08_34_PM.png
Attachment 2: ICableShortedEnd_2022-09-02_3_04_43_PM.png
ICableShortedEnd_2022-09-02_3_04_43_PM.png
Attachment 3: QCableOpenEnd_2022-09-02_3_09_49_PM.png
QCableOpenEnd_2022-09-02_3_09_49_PM.png
Attachment 4: QCableShortedEnd_2022-09-02_3_00_55_PM.png
QCableShortedEnd_2022-09-02_3_00_55_PM.png
Attachment 5: DFD_Delay_Measurement.pdf
DFD_Delay_Measurement.pdf
  17130   Fri Sep 2 15:35:19 2022 AnchalUpdateGeneralAlong the Y arm part 2

[Anchal, Radhika]

The cables in USPS open box were important cables that are part of the new electronics architecture. These are 3 ft D2100103 DB15F to DB9M Reducer Cable that go between coil driver output (DB15M on back) to satellite amplifier coil driver in (DB9F on the front). These have been placed in a separate plastic box, labeled, and kept with the rest of the D-sub cable plastic boxes that are part of the upgrade wiring behind the tube on YARM across 1Y2. I believe JC would eventually store these dsub cable boxes together somewhere later.

  17129   Fri Sep 2 15:30:10 2022 AnchalUpdateGeneralAlong the X arm part 1

[Anchal, Radhika]

Attachment 2: The custom cables which were part of the intermediate setup between old electronics architecture and new electronics architecture were found.
These include:

  • 2 DB37 cables with custom wiring at their connectors to connect between vacuum flange and new Sat amp box, marked J4-J5 and J6-J7.
  • 2 DB15 to dual head DB9 (like a Hydra) cables used to interface between old coil drivers and new sat amp box.

A copy of these cables are in use for MC1 right now. These are spare cables. We put them in a cardboard box and marked the box appropriately.
The box is under the vacuum tube along Yarm near the center.

 

  17128   Fri Sep 2 15:26:42 2022 YehonathanUpdateGeneralSOS and other stuff in the clean room

{Paco, Yehonathan}

BHD Optics box was put into the x-arm last clean cabinet. (attachment 5)

OSEMs were double bagged in a labeled box on the x-arm wire racks. (attachment 1)

SOS Parts (wire clamps, winches, suspension blocks, etc.) were put in a box on the x-arm wire rack. (attachment 3)

2"->3" optic adapter parts were put in a box and stored on the xarm wire rack. (attachment 3)

Magnet gluing parts box was labeled and stored on the xarm rack. (attachment 2)

TT SUS with the optics were stored on the flow bench at the x end. Note: one of the TT SUS was found unsuspended. (attachment 4)

InVac parts were double bagged and stored in a labeled box on the x arm wire rack. (attachment 2)

Attachment 1: osem_sus.jpeg
osem_sus.jpeg
Attachment 2: magnet_gluing.jpeg
magnet_gluing.jpeg
Attachment 3: 2-3inch_adapter_parts.jpeg
2-3inch_adapter_parts.jpeg
Attachment 4: TTs.jpeg
TTs.jpeg
Attachment 5: BHD_optics.jpeg
BHD_optics.jpeg
  17127   Fri Sep 2 13:30:25 2022 Ian MacMillanSummaryComputersQuantization Noise Calculation Summary

P. P. Vaidyanathan wrote a chapter in the book "Handbook of Digital Signal Processing: Engineering Applications" called "Low-Noise and Low-Sensitivity Digital Filters" (Chapter 5 pg. 359).  I took a quick look at it and wanted to give some thoughts in case they are useful. The experts in the field would be Leland B. JacksonP. P. VaidyanathanBernard Widrow, and István Kollár.  Widrow and Kollar  wrote the book "Quantization Noise Roundoff Error in Digital Computation, Signal Processing, Control, and Communications" (a copy of which is at the 40m). it is good that P. P. Vaidyanathan is at Caltech.

Vaidyanathan's chapter is serves as a good introduction to the topic of quantization noise. He starts off with the basic theory similar to my own document on the topic. From there, there are two main relevant topics to our goals.

The first interesting thing is using Error-Spectrum Shaping (pg. 387). I have never investigated this idea but the general gist is as poles and zeros move closer to the unit circle the SNR deteriorates so this is a way of implementing error feedback that should alleviate this problem. See Fig. 5.20 for a full realization of a second-order section with error feedback.

The second starts on page 402 and is an overview of state space filters and gives an example of a state space realization (Fig. 5.26). I also tested this exact realization a while ago and found that it was better than the direct form II filter but not as good as the current low-noise implementation that LIGO uses. This realization is very close to the current realization except uses one less addition block.

Overall I think it is a useful chapter. I like the idea of using some sort of error correction and I'm sure his other work will talk more about this stuff. It would be useful to look into.

One thought that I had recently is that if the quantization noise is uncorrelated between the two different realizations then connecting them in parallel then averaging their results (as shown in Attachment 1) may actually yield lower quantization noise. It would require double the computation power for filtering but it may work. For example, using the current LIGO realization and the realization given in this book it might yield a lower quantization noise. This would only work with two similarly low noise realizations. Since it would be randomly sampling two uniform distributions and we would be going from one sample to two samples the variance would be cut in half, and the ASD would show a 1/√2 reduction if using realizations with the same level of quantization noise. This is only beneficial if the realization with the higher quantization noise only has less than about 1.7 times the one with the lower noise. I included a simple simulation to show this in the zip file in attachment 2 for my own reference.

Another thought that I had is that the transpose of this low-noise state-space filter (Fig. 5.26) or even of LIGO's current filter realization would yield even lower quantization noise because both of their transposes require one less calculation.

Attachment 1: averagefiltering.pdf
averagefiltering.pdf
Attachment 2: AveragingFilter.py.zip
  17126   Thu Sep 1 09:00:02 2022 JCConfigurationDaily ProgressLocked both arms and aligned Op Levs

Each morning now, I am going to try to align both arms and lock. Along with that, sometime at towards the end of each week, we should align the OpLevs. This is a good habit that should be practiced more often, not only by me. As for the Y Arm, Yehonathan and I had to adjust the gain to 0.15 in order to stabilize the lock.

Attachment 1: Daily.pdf
Daily.pdf
Attachment 2: Daily.pdf
Daily.pdf
  17125   Wed Aug 31 16:11:37 2022 KojiUpdateGeneralVertex Lab area to be cleaned

The analog electronics units piled up along the wall was moved into 1X3B rack which was basically empty. (Attachments 1/2/4)

We had a couple of unused Sun Machines. I salvaged VMIC cards (RFM and Fast fiber networking? for DAQ???) and gave them to Tega.
Attachment 3 shows the eWastes collected this afternoon.

Attachment 1: PXL_20220831_224457839.jpg
PXL_20220831_224457839.jpg
Attachment 2: PXL_20220831_224816960.jpg
PXL_20220831_224816960.jpg
Attachment 3: PXL_20220831_225408183.jpg
PXL_20220831_225408183.jpg
Attachment 4: PXL_20220901_021729652.jpg
PXL_20220901_021729652.jpg
  17123   Wed Aug 31 12:57:07 2022 ranaSummaryALScontrol of ALS beat freq from command line -easy

The PZT sweeps that we've been making to characterize the ALS-X laser should probably be discarded - the DFD was not setup correctly for this during the past few months.

Since the DFD only had a peak-peak range of ~5 MHz, whenever the beat frequency drifts out of the linear range (~2-3 MHz), the data would have an arbitrary gain. Since the drift was actually more like 50 MHz, it meant that the different parts of a single sweep could have some arbitrary gain and sign !!! This is not a good way to measure things.

I used an ezcaservo to keep the beat frequency fixed. The attacehed screenshot shows the command line. We read back the unwrapped beat frequency from the phase tracker, and feedback on the PSL's NPRO temperature. During this the lasers were not locked to any cavities (shutters closed, but servos not disabled).

For the purposes of this measurement, I reduced the CAL factor in the phase tracker screen so that the reported FINE_PHASE_OUT is actually in kHz, rather than Hz on this plot. So the green plot is moving by 10's of MHz. When the servo is engaged, you can see the SLOWDC doing some action. We think the calibration of that channel is ~1 GHz/V, so 0.1 SLOWDC Volts should be ~100 MHz. I think there's a factor of 2 missing here, but its close.

As you can see in the top plot, even with the frequency stabilized by this slow feedback (-1000 to -600 seconds), the I & Q outputs are going through multiple cycles, and so they are unusable for even a non serious measurement.

The only way forward is to use less of a delay in the DFD: I think Anchal has been busily installing this shorter cable (hopefully, its ~3-5 m long so that the linear range is more. I think a 10 m cable is too long.), and the sweeps taken later today should be more useful.

Attachment 1: Untitled.png
Untitled.png
  17122   Wed Aug 31 11:39:48 2022 YehonathanUpdateLSCUpdated XARM noise budget

{Radhika, Paco, Yehonathan}

For educational purposes we update the XARM noise budget and add the POX11 calibrated dark noise contribution (attachment).

Attachment 1: Screenshot_2022-08-31_11-38-46.png
Screenshot_2022-08-31_11-38-46.png
  17121   Wed Aug 31 01:54:45 2022 KojiUpdateGeneralAlong the Y arm part 2
Attachment 1: PXL_20220831_021459596.jpg
PXL_20220831_021459596.jpg
Attachment 2: PXL_20220831_021522069.jpg
PXL_20220831_021522069.jpg
Attachment 3: PXL_20220831_021536313.jpg
PXL_20220831_021536313.jpg
Attachment 4: PXL_20220831_021544477.jpg
PXL_20220831_021544477.jpg
Attachment 5: PXL_20220831_021553458.jpg
PXL_20220831_021553458.jpg
Attachment 6: PXL_20220831_021610724.jpg
PXL_20220831_021610724.jpg
Attachment 7: PXL_20220831_021618209.jpg
PXL_20220831_021618209.jpg
Attachment 8: PXL_20220831_021648175.jpg
PXL_20220831_021648175.jpg