7944
|
Fri Jan 25 08:10:42 2013 |
Steve | Update | General | Laseroptik mirrors |
Here are the German plots. Unfortunately they are not logarithmic.
Ed: Proprietary data removed. Use wiki (Koji)
Steve uploaded data to the 40m wiki / Aux_Optics on 02-07-2013
|
7999
|
Tue Feb 5 09:08:11 2013 |
Steve | Update | PEM | exterier doors to be painted |
Quote: |
The wood exteier walls, gutters and doors were painted at CES-Annex building #69
|
The east and south end of the 40m emergency exit doors are sealed- tapped off temporarily. They will be painted on the out side only. This job will be done by tomorrow noon
Do not open chamber if you smell the paint ! |
Attachment 1: IMG_0055.JPG
|
|
8001
|
Tue Feb 5 10:18:54 2013 |
Steve | Update | PEM | high particle count ALART |
Quote: |
Quote: |
The BS camber is open only. We should close ASAP
Outside air quality is 1.7- 2.2 million particles / cf min of 0.5 micron
|
Air is still bad and the chambers are closed. Before lunch Jamie repointed the PRM oplev. Manasa and I reset oplevs: BS and ITMX.
ETMX and ETMY are fine.
SRM and ITMY oplevs needs more work.
|
The bad outside air quality is pushing up the inside counts.
The outside air is 5 million counts / cf min for 0.3 micron and 2 million counts / cf min for 0.5 micron particles
Do not open chamber over 10,000 counts / cf min of 0.5 micron |
Attachment 1: badair.png
|
|
Attachment 2: 100d_airq.png
|
|
8004
|
Tue Feb 5 15:31:03 2013 |
Steve | Update | General | clean assembly room benches cleaned up |
Manasa, Jamie and Steve,
Tip-Tilts and parts moved into the most north " 40m " cabinet in the assembly room.
Green-black glass and related components were moved to the 40m E0 cabinet in plastic boxes.
The north flow bench has a few items that belong to us: HE/Ne laser, qpd on translation stages, an iris and one red mirror. These were moved to the north edge of this bench.
However this leveled table is still full with other people's stuff |
Attachment 1: IMG_0057.JPG
|
|
Attachment 2: IMG_0061.JPG
|
|
8009
|
Wed Feb 6 15:05:18 2013 |
Steve | Update | SAFETY | cameras must be anchord |
Cameras must be immediately anchord to avoid a possible collusion with the view port ! |
Attachment 1: IMG_0070_1.JPG
|
|
Attachment 2: IMG_0069_1.JPG
|
|
8010
|
Wed Feb 6 15:10:22 2013 |
Steve | Update | PEM | new safety signs on exterier doors |
Quote: |
Quote: |
The wood exteier walls, gutters and doors were painted at CES-Annex building #69
|
The east and south end of the 40m emergency exit doors are sealed- tapped off temporarily. They will be painted on the out side only. This job will be done by tomorrow noon
Do not open chamber if you smell the paint !
|
The east and south end of the 40m emergency exit doors received new safety signs. |
Attachment 1: IMG_0068.JPG
|
|
8013
|
Wed Feb 6 15:39:19 2013 |
Steve | Update | Electronics | DC power supplies in cabinets |
East arm cabinet E9 and E10
|
Attachment 1: IMG_0066_1.JPG
|
|
8026
|
Thu Feb 7 17:24:13 2013 |
Steve | Update | SAFETY | fire extinguishers checked |
The fire department weighted and pressure checked our units today. Surprisingly they found one powder filled can. We can only use HALON gas in the lab.
|
8057
|
Mon Feb 11 16:16:27 2013 |
Steve | Update | VAC | 55 days at atmoshere |
CP Stat 100 sheet-covers were replaced by clean ones on open chambers BS, ITMX, ITMY and ETMY this morning.
Try to fold the sheets such way that the clean side is facing each other, so they do not accumulate dust.
|
Attachment 1: atm55d.png
|
|
8075
|
Wed Feb 13 09:28:56 2013 |
Steve | Update | Optics | G&H - HR plots |
Gooch & Housego optics order specification from 03-13-2010
Side 1: HR Reflectivity >99.99 % at 1064 nm for 0-45 degrees for S & P polarization
Side 2: AR coat R <0.15
The HR coating scans uploaded to 40mwiki / Aux optics today |
8083
|
Thu Feb 14 08:29:41 2013 |
Steve | Update | IOO | low MC1 OSEM voltage |
MC1 - LR, LL, UL & UR OSEMs should be adjusted to get 1.2V |
Attachment 1: Feb14_2013.png
|
|
8087
|
Fri Feb 15 09:58:49 2013 |
Steve | Update | General | beam traps ready to be installed |
Black-green glass traps are ready for light in vacuum. I can assemble more if needed. These three sizes are available. |
Attachment 1: IMG_0083.JPG
|
|
Attachment 2: IMG_0084.JPG
|
|
8107
|
Tue Feb 19 09:37:23 2013 |
Steve | Update | IOO | low MC1 OSEM voltage |
See TT DB25 pin swapping elog#7869 |
Attachment 1: MC1_MC3.png
|
|
Attachment 2: MC1_MC3_.png
|
|
8131
|
Thu Feb 21 18:01:27 2013 |
Steve | Update | VAC | pumpdown at 230 Torr |
We are pumping down with RP1 & RP3 oily roughing pumps at 3 Torr/min speed. The butterfly valve was just removed.
The PSL shutter is open to vacuum at ~100 mW 1064 nm. The inter lock should close it at ~5 mTorr.
Rana will shut down pumping tonight.
He will close V3 from screen, close RV1 valve with torque wheel, turn off roughing pumps and disconnect hose between RV1 and roughing pumps.
I will restart pumping early morning tomorrow.
|
8135
|
Fri Feb 22 08:01:25 2013 |
Steve | Update | VAC | pumpdown continuous |
Pump down is restarted after 10.5 hrs stop overnight. |
Attachment 1: 16hrs_pd75.png
|
|
8136
|
Fri Feb 22 11:12:16 2013 |
Steve | Update | VAC | pumpdown completed |
IFO P1 pressure is 1 mTorr. It is ready for high power light.
The Maglev took over the pumping at 500 mTorr
|
Attachment 1: mag60min.png
|
|
Attachment 2: pd75at20h.png
|
|
8155
|
Mon Feb 25 08:22:03 2013 |
Steve | Update | VAC | pumpdown at day 4 |
All normal, IFO pressure 1.5e-5 Torr
RGA is pumped by TP-3 in back ground mode.
|
Attachment 1: 4d.png
|
|
Attachment 2: 66d@atm.png
|
|
8167
|
Tue Feb 26 09:55:46 2013 |
Steve | Update | SAFETY | Evan receives safety training |
Evan got 40m specific safety training today. |
8184
|
Wed Feb 27 14:53:02 2013 |
Steve | Update | LSC | what is the Fibox ? |
Fibox FBAI-M 20bit units were connected with multimode fibre. This pair of fiber is not protected in the cable tray. |
8205
|
Fri Mar 1 08:19:40 2013 |
Steve | Update | ASS | drift |
Early morning drift in pitch. This plot is meaningless because there is no real light on IP-Ang
The beam is clipping on the pick off mirror at ETMY chamber. The beam is half beam size too high. Yaw is perfect
|
Attachment 1: drift.png
|
|
8206
|
Fri Mar 1 14:50:36 2013 |
Steve | Update | VAC | pumpdown day 8 |
Atm1, RGA background scan with TP3 pumping at day 7
Atm2, IFO CC1 = 1.1e-5 Torr at day 8
Vacuum valve VM3 closed and VM2 opened, it switched the RGA to IFO scanning mode. CC4 = 3.5e-6 Torr
TP3 is pumping on the annuloses, their pressures are 1-3 mTorr
Vacuum condition reached the state of Vacuum Normal. The MEDM screen "Current State" channel does not work because we disconnected some valves after the VME swap CAOS
Note: TP1 Maglev performance on Atm2 CC4 = 4e-9 Torr when VM2 valve was open
|
Attachment 1: bgTP3d7.png
|
|
Attachment 2: RGAonIFO.png
|
|
8216
|
Mon Mar 4 09:51:26 2013 |
Steve | Update | ASS | IP-ANG is still not real |
IP-ANG is coming out of ETMY without clipping. The beam is very high on the pick off mirror at the end table but it is still missing the qpd .
|
Attachment 1: IP-ANG.png
|
|
8219
|
Mon Mar 4 11:30:47 2013 |
Steve | Update | PEM | air cond problem |
The air cond is out of order at the area covered by racks 1 X 1 through 1 X 7
The arm X and Y AC units are working. |
Attachment 1: 40dAC.png
|
|
8231
|
Tue Mar 5 14:59:32 2013 |
Steve | HowTo | VAC | dry-forepump replaced |
TP3 turbo pump's dry-foreline pump was replaced.
How to do it:
The pump should be replaced when it's performance <1.0 - 1.3 Torr
Set up valve configuration as shown at Atm1: close in this order VAEE, VASV, VABS, VASV, VASE, VA6 and V5,
Turn TP3 off at it's controller in the rack. Wait till is stops, so you can read 760 Torr at TP3 foreline gauge
Disconnect intake, exhaust vacuum seals and replace pump. Reconnect vacuum fitting and start it up.
Confirm operational details on the front of the controller: 50 K_RPM, 0.2A and <100 mTorr
Reset valves in reverse order
PS: the average life of the tip seal on the Varian SSH-110 dry-pump is about 1 year
This pump " ser LP1007L556 " seal made new record of 668 days: thanks to Bob Taylor who is replacing these seals
|
Attachment 1: changingforepump.png
|
|
Attachment 2: TP3wFp600.jpg
|
|
8238
|
Wed Mar 6 08:40:03 2013 |
Steve | Update | VAC | first scan of this pumpdown |
Pumpdown 75 - Maglev - day 12
Precondition: 66 days at atm, installed TIP-TILTs with coils that replaced PZT-Jena input steering
|
Attachment 1: pd75m12d.png
|
|
Attachment 2: pd75mRGA12d.png
|
|
8241
|
Wed Mar 6 16:14:27 2013 |
Steve | Update | SAFETY | safety training |
Chloe Ling, Max Horton and Annalisa Allocca have received basic 40m specific safety training. |
Attachment 1: IMG_500.jpg
|
|
8270
|
Mon Mar 11 16:29:29 2013 |
Steve | Update | PEM | proposed seismometer locations |
Granite base 20" x 20" x 5" locations are on the CES side of our IFO arms: as shown ETMY_ south-west, ETMX_north-east, ITMX_south-east . No height limitation. This side of the tube has no traffic.
SS cover McMaster# 41815T4 (H) SS container cov |
Attachment 1: ETMY_sw.jpg
|
|
Attachment 2: ITMX_se.jpg
|
|
Attachment 3: ETMX_ne.jpg
|
|
8280
|
Tue Mar 12 14:51:00 2013 |
Steve | Update | Computers | buy warranty or not ? |
Details of the warranties are posted on wiki power supply cost, warranty described, cost
.......I’ve also attached a warranty renewal quote. A 1 year warranty renewal is usually $.... per year, but we gave you special pricing of $.... / year if you renew both units. This pricing is also special due to the fact that both warranties expired awhile ago. We usually require that the warranty renewal begin on the date of expiration, but we will waive this for you this time if both are renewed.
JetStor SATA 416S, SN: SB09040111A3 – expired 04/24/2012 (3 years old)
JetStor SATA 516F, SN: SB09080016P – expired on 08/21/2012........
. Are we keep it for an other 2 years? buy warranty or buy better storage.
|
8285
|
Wed Mar 13 11:34:24 2013 |
Steve | Update | optical tables | table covers moved to CES |
The two acrylic optical table enclosures were moved from the carpenter shop to CES. I need to order windows. The latest quotes from Laseroptik are posted at the wiki / aux_optics page.
Things to do: order windows, draw and order window flange, install surgical tubing seals, buy and line enclosures with IR shield films. |
Attachment 1: acrylicEnclosure.jpg
|
|
8307
|
Mon Mar 18 14:58:15 2013 |
Steve | Update | Green Locking | repair or replace dead NPRO |
JDSU can repair the Lightwave M126-1064-700 NPRO, sn 415 They do not need the Controller sn 516
Posted in the 40m Wiki_ PSL_ NPRO cost repair and/or option to buy Innolight laser as replacement |
8311
|
Tue Mar 19 17:00:14 2013 |
Steve | Update | VAC | large window quote of Cascade |
Optical quality 6.5" OD window specs and quotes for vacuum view ports and optical table enclosure are on the 40m wiki_ Aux Optics page.
We have just received a very good quote #2 from Cascade Optical. |
8314
|
Wed Mar 20 08:59:24 2013 |
Steve | Update | PEM | air cond maitenance is today |
Outside air quality at 8:30am 1.1 million of 0.5 micron particles cf / min with MET counter #2
AC unit output measured directly at the outlet of east end 6,000 and south end 3,000 of 0.5 micron particles cf / min with counter #2
Lab measurement at the top of IOOC 20K of 0.5 micron particles cf / min with MET #1
HEPA filters: 2 mobile units at the middle of the east arm at speed 100%, PSL enclosure 20% and south end flow bench are running.
The PSL, south flow bench and mobile unit (Envirco sn69406003 ) measured zero counts of 0.5 & 0.3 micron particles
Envirco HEPA filter unit sn 69406001 measured 50 particles of 0.5micron and 320 of 0.3 micron particles cf / min with counter #2
This filter will be replaced.
NOTE: inside air quality peaks we can not control. It depends on the weather and our house keeping.
When your work is particle sensitive keep your eyes on the particle counter.
|
Attachment 1: 100dPEM.png
|
|
8315
|
Wed Mar 20 14:00:21 2013 |
Steve | Update | 40m Upgrading | Endtable upgrade |
As discussed at the 40m meeting: Koji, Manasa and Steve
We are planning to remove the whole 4'x2' optical table ETMY-ISCT with optics as it is tomorrow morning.
This way I can start placing the new 4'x3' table and acrylic enclosure in place. |
8320
|
Thu Mar 21 08:11:53 2013 |
Steve | Update | 40m Upgrading | ETMY table swap |
Quote: |
Quote: |
As discussed at the 40m meeting: Koji, Manasa and Steve
We are planning to remove the whole 4'x2' optical table ETMY-ISCT with optics as it is tomorrow morning.
This way I can start placing the new 4'x3' table and acrylic enclosure in place.
|
I will be removing all cables on the ETMY endtable and labeling them today before we remove the table tomorrow morning. If there is anything else that should be done before the swapping which we might have not considered, elog it and we'll have it all done.
Also,I've attached the updated inventory.
|
The cables are Not disconnected. I have people coming to do the lifting at 9:45am Email is not working. This will cause a delay. I need conformation that we still moving on with the swap |
8330
|
Thu Mar 21 17:06:34 2013 |
Steve | Update | 40m Upgrading | ETMY table is out |
Quote: |
Yes! We are swapping.
I'll be there very soon!
|
The ETMY optical table 4' x 2' with all optical components was placed on two carts and rolled out of the end. The 4' x 3' x 4" TMC 78-235-02R breadboard was placed into position and marked for anchoring bolt locations.
It will be drilled, tapped, shimmed, leveled and bolted it into final position tomorrow morning. I'm planning to bring the acrylic enclosure to the east end tomorrow afternoon. |
Attachment 1: ETMYtableSupport.jpg
|
|
8340
|
Mon Mar 25 18:07:31 2013 |
Steve | Update | 40m Upgrading | ETMY table is out |
Quote: |
Quote: |
Yes! We are swapping.
I'll be there very soon!
|
The ETMY optical table 4' x 2' with all optical components was placed on two carts and rolled out of the end. The 4' x 3' x 4" TMC 78-235-02R breadboard was placed into position and marked for anchoring bolt locations.
It will be drilled, tapped, shimmed, leveled and bolted it into final position tomorrow morning. I'm planning to bring the acrylic enclosure to the east end tomorrow afternoon.
|
The new table is tapped and leveled, but not ready for final anchoring. The existing 8 mm shims on the top of the support legs will be moved to the bottom of the legs, where more torque is available on the 1/2" bolts
The coated tin film sheets are being installed at the shop. The table and the enclosure will be ready on Friday. |
Attachment 1: shimmingEE.jpg
|
|
8350
|
Tue Mar 26 08:50:02 2013 |
Steve | Update | General | janitor day |
Keven, our janitor accidentally pushed the main entry door laser emergency stop switch.
The laser was turned back on. The MC and the arms were started flashing happily as they were before. |
8356
|
Tue Mar 26 16:36:24 2013 |
Steve | Update | 40m Upgrading | table leveling mounts go here |
Quote: |
Steve's suggestion for how to level the end table using "swivel leveling mounts":

|
1, level table with 4 swivels, lock nuts 3/16 -vertical alignment 2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction
Adjustable mount is here to compensate for bad tilting floor <http://www.mcmaster.com/#6111K52>
See grouting plans of the past http://nodus.ligo.caltech.edu:8080/40m/7248 |
Attachment 1: optabSTAND.PDF
|
|
Attachment 2: swivvelMountEE.jpg
|
|
8365
|
Thu Mar 28 07:58:15 2013 |
Steve | Update | Green Locking | NPRO repair |
Quote: |
JDSU can repair the Lightwave M126-1064-700 NPRO, sn 415 They do not need the Controller sn 516
Posted in the 40m Wiki_ PSL_ NPRO cost repair and/or option to buy Innolight laser as replacement
|
NPRO shipped out for evaluation yesterday under RMA 18022707 |
8372
|
Fri Mar 29 16:30:27 2013 |
Steve | Update | 40m Upgrading | table leveling mounts go here |
Quote: |
Quote: |
Steve's suggestion for how to level the end table using "swivel leveling mounts":

|
1, level table with 4 swivels, lock nuts 3/16 -vertical alignment 2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction
Adjustable mount is here to compensate for bad tilting floor <http://www.mcmaster.com/#6111K52>
See grouting plans of the past http://nodus.ligo.caltech.edu:8080/40m/7248
|
|
8373
|
Fri Mar 29 16:35:54 2013 |
Steve | Update | 40m Upgrading | Endtable upgrade |
My full effort to get the optical table enclosure ready for the lab has failed today.
What I did: cut IR thermashield sheets to size for sides and top and sandwitched them beetween 1" and 1/4" acrylic.
The carpenter shop recut the bottom o -ring groove to 0.250" wide and 0.150" deep.
O-ring was cut and installed. So this was ready to go lab.
NO, I realized that the liner yellow acrylic was not cut correctly. It was larger than 1" wall.
The shop is cutting them down to fit and I have to resize IR shields |
8392
|
Tue Apr 2 17:23:23 2013 |
Steve | Update | 40m Upgrading | new ETMY optical table & enclosure in place |
Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm
I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.
|
Attachment 1: EEopt1d.jpg
|
|
8416
|
Thu Apr 4 17:23:05 2013 |
Steve | Update | 40m Upgrading | ETMY optical table & enclosure is ready for optics |
Quote: |
Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm
I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.
|
Glued surgical latex tubing with super glue into O-ring shape. The existing in place tubing K-100, OD 0.125" (actual size 0.140"), wall 0.031", ID 0.062".
I have just found out that tolerances on tubing OD are + - 0.026" by the manufacturer. I'm getting larger tubing for better fit.
The table is ready for optics.
Things left to do:
1, finalize o-ring size 2, finish cable feedthrough 3, finalize window connection 4, IR-Thermashield strips for bridge sides 5, replace bridge support post with solid one
|
8421
|
Mon Apr 8 08:05:41 2013 |
Steve | Update | PSL | PMC locked |
The PMC locked manually. MC grabbed lock instantaniously |
8423
|
Mon Apr 8 16:37:26 2013 |
Steve | Update | 40m Upgrading | ETMY enclosure wall transmission |
Enclosure cover #1 transmission measured in 1064 nm, 156 mW, P polarization and beam size ~ 1 mm
As condition: fully assembled, protective layer removed, tinted- adhesive activated on yellow acrylic on top of each other.
T = 1.2 % in 20 minutes exposure test. This agrees with the test measurement of 6-18-2012
There is a reflected 2-3 cm circular glare that is barely visible on sensor card. It is well below 1 mW level
As we are installing the NPRO with ~350 mW of power we have to address what additional shield should be installed.
The June 2012 test with 1W power burned through of the 3 layer IR coated films in 3-4 hours.
We 'll use Aluminum shields in the high power path till we come up with better solution. |
8429
|
Tue Apr 9 07:48:10 2013 |
Steve | Update | PSL | PMC locked |
Quote: |
The PMC locked manually. MC grabbed lock instantaniously
|
PMC locked |
Attachment 1: pmc10d.png
|
|
8430
|
Tue Apr 9 08:37:54 2013 |
Steve | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : TRY temporarily in place |
Quote: |
The TRY path on the end table is temporarily in place to help IFO locking.
The Y arm transmission was steered to get TRY back on the PD and the camera. I found that TRY is a couple of inches off in yaw at the end table (comparing to the CAD layout and the earlier layout) and I believe it is because of the changes in input pointing.
I've used a Y1 mirror to steer the Y transmission to an R98% BS. The reflected beam falls on PDA520 and the transmitted beam is steered to the camera. The earlier normalization of TRY is no more valid as the power distribution at the PD has changed.
|
Temporary acrylic wind guard added between enclosure and ETMY transmission window to help IFO locking |
8435
|
Wed Apr 10 07:37:33 2013 |
Steve | Update | PSL | PMC locked |
Quote: |
Quote: |
The PMC locked manually. MC grabbed lock instantaniously
|
PMC locked
|
PMC locked. |
Attachment 1: pmc4d.png
|
|
8443
|
Thu Apr 11 10:15:55 2013 |
Steve | Update | Locking | PRM yaw oplev transferfunction |
See Feb 2012 PRM yaw transferfunctions, also check Valera's modified side sensor may effect yaw motion
|
8461
|
Thu Apr 18 15:08:14 2013 |
Steve | Update | PEM | seismometer isolation kit in place |
Quote: |
We got granite bases today from the manufacturer. We plan to set them up on Wednesday, 8 am. Please note, there will be an installation mess at Xend, Yend and corner during ~4 hours. Let us know if you have any objections to do this at this particular time.
Installation locations are specified in elog 8270, scheme attached is valid except for Xend. Instrument will be installed on the place of nitrogen containers.
( next to the wall at corner sout-east of the south end )
|
The carpenter shop finished the installation of the 3 granite bases.Rapid Set Cement All high strength non-shrink grout was used.
Compressive strength 3000 PSI at 1 hour and 9000 PSI at day 28 The janitor is still cleaning up after them at the south end.
The soft silicon gas kits are working well with the SS can. Den is making the adaptor plate drawing for the feedthrough. |
Attachment 1: grouting1.jpg
|
|
Attachment 2: grouting2.jpg
|
|
Attachment 3: grouting3.jpg
|
|
Attachment 4: grouting4.png
|
|