12706
|
Thu Jan 12 13:43:02 2017 |
rana | HowTo | safety | closing a door | This is one of those unsolved door lock
acquisition problems. Its been happening
for years. |
|
12707
|
Thu Jan 12 13:45:58 2017 |
Steve | HowTo | safety | closing a door | It was requested this morning.
|
|
12868
|
Mon Mar 6 09:12:59 2017 |
Steve | Update | safety | crane inspection 2017 | All 3 cranes inspected by professional
Fred Goodbar of Konecranes and load tested
with 450 lbs at max reach on Friday, March |
|
12913
|
Tue Mar 28 16:47:40 2017 |
Steve | Update | safety | Projector bulb is out again | Three replacement
bulbs ordered
Rana can discribe |
|
12921
|
Fri Mar 31 10:16:07 2017 |
Steve | Update | safety | laser safety glasses annual inspection | Laser safety glasses cleaned in "
Dawn Ultra " mild soap - water solution
and measured for 1064 nm transmission at |
 |
12927
|
Tue Apr 4 11:24:21 2017 |
Steve | Update | safety | Projector bulb is out again | Shipped out for repair.
|
|
12970
|
Thu May 4 08:00:54 2017 |
Steve | Update | safety | safety training | Freshmen Rebecca Zhang as " work study
undergrad " received 40m specific
basic safety training yesterday. |
|
12994
|
Tue May 16 16:16:16 2017 |
Steve | Update | safety | safety training | Early surfs of India Jigyasa and
Kaustubh received basic 40m specific safety
traning. |
|
13095
|
Wed Jul 5 10:23:18 2017 |
Steve | Update | safety | liquid nitrogen boil off | The liquid nitrogen container has a pressure
releif valve set to 35 PSI This valve
will open periodically when contains LN2 |
|
13144
|
Tue Jul 25 14:27:19 2017 |
Steve | Update | safety | safety training | Kira Dubrovina and Naomi Wharton received
40m specific basic safety training. |
|
13406
|
Mon Oct 30 08:08:06 2017 |
Steve | Update | safety | safety training | Udit Kahndelwal received 40m specific basic
safety traning on Friday, Oct. 27 |
|
13496
|
Tue Jan 2 16:24:29 2018 |
gautam | Update | safety | Projector periodically shuts itself off | I noticed this behaviour since ~Dec 20th,
before the power failure. The bulb itself
seems to work fine, but the projector turns |
|
13592
|
Wed Jan 31 15:46:05 2018 |
Steve | Update | safety | crane inspection | Annual crane inspection with load tests
is scheduled for Monday, Feb 5, 2018 from
8 to 11:30am |
|
13630
|
Mon Feb 12 14:56:00 2018 |
Steve | Update | safety | crane inspection 2018 | Our 3 cranes passed professional
inspection. Fred Goodbar of Konacrane with
450 lbs load at full extension. |
  |
13843
|
Tue May 15 13:34:30 2018 |
Steve | Update | safety | surf safety training | Pooja and Keirthana received 40m specific
basic safety training. |
|
14031
|
Thu Jun 28 13:12:20 2018 |
Steve | Update | safety | surf safety training | Shruti and Sandrine received 40m specific
basic safety training this morning.
|
|
14199
|
Tue Sep 18 14:02:37 2018 |
Steve | Update | safety | safety training | Yuki Miyazaki received 40m specific basic
safety training.
|
|
14263
|
Thu Oct 25 16:17:14 2018 |
Steve | Update | safety | safety training | Chub Osthelder
received 40m specific basic safety traning
today. |
|
14978
|
Fri Oct 18 18:13:55 2019 |
Koji | Update | safety | Laser interlock looks OK | I've checked the state of the laser
interlock switch and everything looked normal. |
|
14980
|
Mon Oct 21 11:44:19 2019 |
gautam | Update | safety | Interlock reconnected to Innolight controller | We also took this opportunity to re-connect
the interlock to the Innolight controller
(after it was disconnected for diagnosing |
|
15508
|
Thu Aug 6 22:57:20 2020 |
gautam | Update | safety | New live HV Supplies | Be aware that there is now a KEPCO HV supply
that is energized, sitting on the floor immediately
adjacent to the OMC rack, east of the AP |
|
15544
|
Fri Aug 28 11:41:23 2020 |
gautam | Bureaucracy | safety | Crane inspection 2020 | Mr Fred Goodbar of Konacrane was in the
lab 830am-1130am today. All three cranes
in the VEA were inspected, loaded with 450lb |
|
15932
|
Wed Mar 17 15:02:06 2021 |
gautam | Update | safety | Door to outside from control room was unlocked | I came into the lab a few mins ago and
found the back door |
|
15938
|
Thu Mar 18 12:35:29 2021 |
rana | Update | safety | Door to outside from control room was unlocked | I think this is probably due to the safety
tour yesterday. I beleive Jordan showed them
around the office area and C&B. Not sure |
|
17659
|
Mon Jun 26 18:37:35 2023 |
Koji | Update | safety | 40m Lab Laser Safe | 40m Lab is now Laser Safe
- The PSL NPRO (Innolight) was
turned off with the OFF switch and the key. |
|
12998
|
Thu May 18 15:20:29 2017 |
jigyasa | Summary | telescope design | Telescope Design for the Gig-E cameras | With the objective of designing a telescope
system for the Gig-E, a system of two lenses
is implemented. A rough schematic of |
6x |
13000
|
Mon May 22 10:15:14 2017 |
jigyasa | Summary | telescope design | Lens tubes and object distances | Since the
f numbers of the lenses in the proposed design
with biconvex lenses are a little less than |
|
13004
|
Mon May 22 15:01:41 2017 |
jigyasa | Update | telescope design | Updated Telescope design with 1'' eye piece | I examined
the use of a single lens system for the available
range of focal lengths, for the required |
|
15877
|
Mon Mar 8 12:01:02 2021 |
Paco, Anchal | Summary | training | Investigate how-to XARM locking | [Paco, Anchal]
- Started zoom stream; thanks to
whoever installed it! |
|
15878
|
Mon Mar 8 12:40:35 2021 |
gautam | Summary | training | Investigate how-to XARM locking | For the arm locking, the "Restore
Xarm (XARM POX)" script from the "IFO_CONFIGURE"
MEDM screen should get you there (I just checked |
|
15912
|
Fri Mar 12 11:44:53 2021 |
Paco, Anchal | Update | training | IMC SUS diagonalization in progress | [Paco, Anchal]
- Today we spent the morning shift
debugging SUS input matrix diagonalization. |
|
15919
|
Mon Mar 15 08:55:45 2021 |
Paco, Anchal | Summary | training | | [Paco, Anchal]
Found IMC locked upon arrival.
Since