40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 341 of 341  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Fri Sep 23 14:10:19 2022, Radhika, Update, BHD, BH55 RFPD installed - part I IMG_3766.jpegIMG_3770.jpegIMG_3773.jpeg
[Radhika, Paco, Anchal]

I placed a lens in the B-beam path to focus the beam spot onto the RFPD [Attachment 1]. To align the beam spot onto the
RFPD, Anchal misaligned both ETMs and ITMY so that the AS and LO beams would not interfere, and the PD output would remain at some DC level (not
    Reply  Fri Sep 23 18:31:46 2022, rana, Update, BHD, BH55 RFPD installed - part I 
A design flaw in these initial LIGO RFPDs is that the SMA connector is not strain releieved by mounting to the case. Since it is only mounted to the
tin can, when we attach/remove cables, it bends the connector, causing stress on the joint.

To get around this, for this gold box RFPD, connect the SMA connector to the PCB using a S shaped squiggly wire. Don't use multi-strand:
    Reply  Fri Sep 23 19:04:12 2022, Anchal, Update, BHD, BH55 LSC Model Updates - part III 
BH55

I further updated LSC model today with following changes:


BH55 whitening switch binary output signal is now routed to correct place.

Switching FM1 which carries dewhitening digital
filter will always switch on corresponding analog whitening before ADC input.


The whitening can be triggered using LSC trigger
    Reply  Fri Sep 23 19:07:03 2022, Tega, Update, Computers, Work to improve stability of 40m models running on teststand  dolphin_state_all_green.pngdolphin_state_IPC_glitch.png
[Chris, Tega]

Timing glitch investigation:


Moved dolphin transmit node from c1sus to c1lsc bcos we suspect that
the glitch might be coming from the c1sus machine (earlier c1pem on c1sus was running faster then realtime).
Installed and started c1oaf to
    Reply  Mon Sep 26 11:39:37 2022, Paco, Update, BHD, BH55 RFPD installed - part II PXL_20220926_175010061.MOTION.jpgBH55_Transimpedance_Measurement.pdf
[Paco, Anchal]

We followed rana's suggestion for stress relief on the SMA joint in the BH55 RFPD that Radhika resoldered. We used a single core, pigtailed
wire segment after cleaning up the solder joint on J7 (RF Out) and also soldered the SMA shield to the RF cage (see Attachment #1). This
    Reply  Tue Sep 27 10:50:11 2022, Paco, Update, BHD, calibrated LO phase noise lo_phase_asd.pdf
Locked LO phase to ITMX single bounce beam at the AS port, using the DCPD (A-B) error point and actuating on LO1 POS. For this the gain was tuned from
0.6 to 4.0. A rough Michelson fringe calibration gives a counts to meters conversion of ~0.212 nm/count, and the OLTF looks qualitatively like the one
in a previous measurement (~ 20 dB at 1 Hz, UGF = 30 Hz). The displacement was then converted
    Reply  Wed Sep 28 16:37:26 2022, Paco, Update, BHD, calibrated LO phase noise; update lo_phase_asd.pdf
[yuta, paco]

Update; the high frequency ( > 100 Hz) drop is of course not real and comes from a 4th order LP filter in the HPC demod I filter which I haven't
accounted for. Furthermore, we have gone through the calibration factors and corrected a factor of 2 in the optical gain. Then, I also added the CLTF to
    Reply  Wed Sep 28 19:15:56 2022, Koji, Update, General, Testing 950nm laser found in trash pile PXL_20220929_013850989.MP.jpgPXL_20220929_013859439.jpgPXL_20220929_013911125.jpg
I don't know what was wrong with the past setup but the 950nm laser (QPHOTONICS QFLD-950-3S) just worked fine up to ~300MHz with basically the same
setup.

A 20dB coupler picks up a small amount of the driving signal from the source signal of the network analyzer. This was fed to CHR. The fiber-coupled
    Reply  Wed Sep 28 21:54:08 2022, Paco, Update, BHD, calibrated LO phase noise; update dcpd_phase_asd.pdflo_phase_asd.pdf
Repeated the LO phase noise measurement, this time with the LO - ITMY single bounce, and a couple of fixes Koji hinted at including:


The DEMOD angle was the missing piece! The previous error point showed lower noise than the individual DCPDs because the demodulation
angle had not been checked. I corrected it so that the error point in LO_PHASE control was exactly equal to the LO-ITMY single bounce fringe. With this,
    Reply  Thu Sep 29 15:12:02 2022, JC, Update, Computers, Setup the 6 new front-ends to boot off the FB1 clone 
[Jamie, Christopher, JC]

This morning we decided to label the the fiber optic cables. While doing this, we noticed that the ends had different label, 'Host' and
'Target'. Come to find out, the fiber optic cables are directional. Four out of Six of the cables were reversed. Luckily, 1 cable for the 1Y3 IO
    Reply  Thu Sep 29 18:01:14 2022, Anchal, Update, BHD, BH55 LSC Model Updates - part IV 
More model changes

c1lsc:


BH55_I and BH55_Q are now being read at ADC_0_14 and ADC_0_15. The ADC_0_20 and ADC_0_21 are bad due to faulty whitening filter board.
The
whitening switch controls were also shifted accordingly.
the slow epics channels for BH55 anti-aliasing switch and whitening switch were added
ELOG V3.1.3-