40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 339 of 339  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Mon May 16 11:14:36 2011, rana, Update, IOO, wiring diagram for IP-POS 
Just FYI, the 3113 is a 12-bit ADC, so we won't get very good resolution out of these. We should get one of those purple boxes.
Also, I corresponded some with Dave Barker. The 40m Wiki at LHO is down because of disk errors. He's working on it and will let us know. But suggests
that we move it to Caltech since he'll turn the box off at the end of the year.
    Reply  Mon Nov 25 10:57:14 2013, Koji, Update, CDS, woes on the X-end hosts Screenshot.png
This morning I came in the 40m then found 
1) c1auxex was throwing out the same errors as recently seen. 
2) c1iscex processes had errors which persisted even after the mx stream reset.
Entry  Fri Jan 27 19:40:03 2017, rana, Metaphysics, elog, word wrapping & large images 
"Why does the word wrapping not work in our browsers with ELOG?" I sometimes wonder. Some of the elogs are fine, but often the 40m one has
the text run off the page.

I found that this is due to people
Entry  Thu Jun 23 02:12:12 2011, Sonali, Update, Green Locking, work schedule. 
 June 22-June 24:
1.Coupling light into fibre at the ETMY.
2.Routing of the fibre to the PSL table.
    Reply  Tue May 26 11:05:10 2015, Steve, Update, PEM, worked around ETMY seism. ETMYseismic.pngcut.jpg
The cable tray holder cross beam is removed and cut short for good access to seismometer.
    Reply  Wed Aug 10 10:32:44 2016, Steve, Update, SEI, working Guralps as they are 6x
The saga has started here  We have to give credit to the Boss who fixed it. The seismometers
themself are not labeled yet.

Atm6  added on 8-12-2016   EX needed to be centered
Entry  Fri Oct 30 04:41:37 2009, rob, Update, Locking, working again 
I never actually figured out exactly what was wrong in entry 2162, but I managed to circumvent
by changing the time sequence of events in the up script, moving the big gain increases in the common mode servo to the end of the script.  So the
IFO can be locked again.
Entry  Mon Sep 21 15:22:19 2015, jamie, Update, DAQ, working on new fb replacement 
I've been putting together a new machine that Rolf got for us as a replacement for fb.

I've installed and configured the OS, and compiled daqd and the necessary supporting software.  I want to try acquiring data with it. 
This will require removing the current/old fb from the DAQ network, and adding the new machine.  It should be able to be done relatively non-invasively,
Entry  Tue Nov 24 14:33:22 2009, Alberto, Update, ABSL, working on the AP table 
I'm working on the AP table. I also opened the auxiliary NPRO shutter. The auxiliary beam is on its path on the AP table and PSL table.
    Reply  Tue Nov 24 19:16:02 2009, Alberto, Update, ABSL, working on the AP table 


    
        
            Quote:
        
        
            
            I'm working on the AP table. I also opened the auxiliary NPRO shutter. The auxiliary beam is on its path on the AP
    Reply  Fri Aug 12 14:37:34 2016, Steve, Update, SEI, working seismometers as they are eq_2.1m_Geysers_CA.pngeq2.1m_GeysersCA.pngoscillations.png
2.1 mag earth quake in Norhten Ca

Our seimometers need professorial centering. Related electronics must be checked too.




Entry  Sat May 4 00:21:00 2013, rana, Configuration, Computers, workstation updates 
 Koji and I went into "Update Manager" on several of the Ubuntu workstations and unselected the "check for updates" button.
This is to prevent the machines from asking to be upgraded so frequently - I am concerned that someone might be tempted to upgrade the workstations to
Ubuntu 12.
Entry  Thu Sep 29 03:43:20 2011, kiwamu, Update, ASC, wrong channel assignment on IPPOS 
The channels for IPPOS had been assigned in a wrong way.
Because of this, C1:ASC-IP_POS_X_Calc corresponds to the actual vertical motion and C1:ASC-IP_POS_Y_Calc is for the horizontal motion.
We should fix the database file to get the correct vertical/horizontal corrdinate.
Entry  Tue May 17 19:38:32 2011, kiwamu, Update, SUS, wrong connection on 1X5 wrong.pngcorrect.png
Today Steve was working around the 1X5 rack to strain relief the cable jungles and the jungle is now getting
less jungle.
During the work he disconnected and reconnected some cables.
Entry  Fri Jan 23 16:33:27 2009, pete, Update, oplevs, x-arm oplev calibrations 
ITMXpit 71 microrad/ct
ITMXyaw 77 microrad/ct
ETMXpit 430 microrad/ct
    Reply  Mon Jul 18 17:07:12 2022, yuta, Update, LSC, x4.12 added to ETMX coil outputs to balance with ETMY 
To balance the actuation on ETMX and ETMY, x4.12 was aded to C1:SUS-ETMX_(UL|UR|LR|LL|SD)COIL FM1.
OSEM damping filter gains, oplev loop gains, and alignment offsets were divided by this factor.
C1:LSC-ETMX_GAIN is now 1.
Entry  Fri Nov 16 03:12:39 2012, Ayaka, Den, Update, Green Locking, xarm locked etmxf.png
We aligned and locked xarm for green.
    Reply  Fri Nov 16 09:57:57 2012, Jenne, Update, Green Locking, xarm locked 


    
        
            Quote:
        
        
            

           We aligned and locked xarm for green.
    Reply  Mon May 19 22:44:21 2014, den, Update, PEM, xend sei isolation kit is set 


    
        
            Quote:
        
        
            

           Yend seismometer isolation kit (elog 8461) hosts Guralp seismometer. I made a cable
Entry  Thu Nov 15 21:52:48 2012, Den, Ayaka, Update, Green Locking, yarm locked yarm.pngetmyf.png
We aligned and locked Y arm for green:

    installed camera on PSL to monitor green transmission
    aligned green path on the ETMY table to see the beam on the PSL
camera
    misaligned ETMY and aligned ITMY to see reflected beam on REFL PD
    installed green transmission PD on PSL
    aligned
Entry  Wed Dec 18 03:29:48 2013, Den, Update, LSC, yarm locked on mc MC_ARM.pdf
As a CM slow path test I locked free swinging yarm by actuating on MC length with bandwidth of 200 Hz. Crossover with AO is not stable so far.
I used xarm as an ool frequency noise sensor. MC2 violin mode is at 645 Hz, I have added a notch filter to LSC-MC2 bank.
Entry  Sat May 17 14:48:06 2014, den, Update, PEM, yend sei isolation kit is set IMG_1405.JPGIMG_1406.JPG
Yend seismometer isolation kit (elog 8461) hosts Guralp seismometer. I made a cable for inside
connection, assembled the kit and relocated the instrument from its previous position at the yend inside the kit.
Seismometer is connected to the readout box and running.
Entry  Mon Jul 7 08:13:41 2014, steve, Update, General, yes,there was firework 8days.png
 
Entry  Mon Apr 19 13:23:03 2010, josephb, Configuration, Computers, yum update fixed on control room machines 
I went to Ottavia, and tried running yum update.  It was having dependancy issues with mjpegtools, which was a rpmforge provided package. 
In order to get it to update, I moved the rpmforge priority above (a lower number) that of epel ( epel -> 20 from 10, rpmforge -> 10 to 20). 
This resolved the problem and the updates proceeded (all 434 of them). yum update on Ottavia now reports nothing needs to be done.
Entry  Thu Mar 5 02:24:19 2009, rana, Configuration, Computers, yum.repos.d 
I added the following repos which I found on allegra to megatron and then did a 'yum install sshfs' on both machines:
allegra:yum.repos.d>l
total 28
Entry  Tue May 5 09:22:46 2009, caryn, Update, PEM, zeros zerotest2.pngzerotest.png
For several of the channels on the PEM ADCU, zeros are occuring at the same time. Does anyone know why that might happen or how to fix it?
    Reply  Thu Jun 7 12:49:50 2012, Jamie, Update, Computers, zita network configured 
Added zita to the martian host table, and configured his network accordingly:

zita            A       192.168.113.217

https://wiki-40m.ligo.caltech.edu/Martian_Host_Table
    Reply  Tue Nov 12 21:50:01 2013, rana, Update, , zita network configured 
 
 I installed 'nfs-client' on zita (the StripTool terminal). It now has mounted all the shared disks, but still can't do StripTool since its
a 32-bit machine and our StripTool is 64.
Entry  Wed Jun 6 22:25:05 2012, Jamie, Update, Computers, zita now running ubuntu 10.04 
I'll finish the rest of the config to turn it into a full-fledged workstation tomorrow.
    Reply  Wed Nov 6 17:45:34 2019, gautam, Update, LSC, ~ 
Here is a comparison of the response of various DoFs in our various RFPD sensors for two different CARM offsets. Even in the case of the smaller CARM
offset of ~1kHz, we are several linewidths away from the resonance. Need to do some finesse modeling to make any meaningful statement about this - why
is the CARM response in REFL11 apparently smaller for the smaller CARM offset?
ELOG V3.1.3-