Wed Oct 4 17:28:48 2023, Koji, Summary, BHD, Balance Mass Layout
|
Wed Oct 4 19:33:23 2023, Koji, Update, BHD, The optical fiber for the BHD/OMC assembly long enough 
|
Sat Oct 7 21:39:29 2023, Paco, Summary, Calibration, FSR measurement setup
| +
Mon Oct 9 14:10:50 2023, rana, paco, Update, IOO, IFO ALIGNED (WITH SOME ISSUES)
|
Tue Oct 10 14:10:11 2023, Paco, Configuration, LSC, ETMY actuation calibration using ALSY
|
Tue Oct 10 17:15:54 2023, Murtaza, Update, SUS, Post-Vertex Coil Driver Upgrade Suspension Calibration 18x
|
Tue Oct 10 17:43:39 2023, Murtaza, HowTo, Computer Scripts / Programs, ligocdsws - XQuartz Troubleshoot
| +
Wed Oct 11 22:57:11 2023, Paco, Update, ALS, On the residual frequency dependence of the ALS DARM calibration with FPMI 
|
Mon Oct 16 08:28:27 2023, JC, Update, VAC, N2 tripped and Vac locked
| +
Mon Oct 16 20:50:32 2023, Paco, Update, IOO, some IMC WFS tweaks: update - MC_TRANS +80dB FM5 back on  
|
Wed Oct 18 12:20:26 2023, JC, Update, Frequency noise measurement, Spectrogram Using GWpy
|
Wed Oct 18 13:01:52 2023, JC, Summary, Daily Progress, Lab WiFi 
|
Thu Oct 19 07:14:44 2023, JC, Update, IOO, Morning Alignment
| +
Mon Oct 23 16:41:22 2023, Koji, Summary, BHD, BHD Platform
| +
Tue Oct 24 18:07:06 2023, yuta, Update, CDS, c1sus2 crashed again
| +
Wed Oct 25 14:03:17 2023, Radhika, Update, LSC, FPMI CARM with CM board 
| +
Thu Oct 26 13:50:14 2023, Koji, Update, General, Picomotor / HWP rotator wiring
| +
Thu Oct 26 19:40:57 2023, Radhika, Update, ASS, XARM ASS Working
|
Mon Oct 30 18:04:46 2023, Paco, Update, SUS, BS Oplev check  
| +
Mon Oct 30 19:20:16 2023, Koji, Summary, General, BHD Inventory 
| +
Tue Oct 31 17:27:09 2023, Koji, Update, SUS, ETMX POS unstable when misaligned 
|
Tue Oct 31 17:27:27 2023, Paco, Update, SUS, ETMX software watchdog
| +
Tue Oct 31 21:09:15 2023, Koji, Update, BHD, OMC bond rework 
|
Wed Nov 1 17:02:33 2023, Paco, Update, BHD, PSL power lowered
|
Wed Nov 1 18:10:03 2023, Koji, Update, General, Ready for the vent
|
Wed Nov 1 18:52:28 2023, Koji, Update, SUS, c1auxey1 confusion
|
Wed Nov 1 19:13:48 2023, Koji, Update, SUS, SUS medm screen update
| +
Fri Nov 3 10:18:21 2023, JC, Update, VAC, BHD OMC Vent
|
Fri Nov 3 13:10:58 2023, Koji, Update, VAC, FRG1/2/5 recalibrated at 1atm
| +
Fri Nov 3 17:16:14 2023, Paco, Configuration, IOO, Low power IMC locked 
|
Sun Nov 5 14:29:19 2023, aaron, Update, Equipment loan, N2 regulator returned to cryo
| +
Mon Nov 6 12:27:39 2023, yuta, Update, ASC, Beam spot position measurements at low power 
|
Mon Nov 6 23:37:13 2023, Koji, Update, General, Aux Laser: Interlock SWs and fiber 
| +
Tue Nov 7 16:43:49 2023, yuta, Summary, SUS, Untripping software watchdog
|
Wed Nov 8 15:14:39 2023, jeff, Update, General, Accelerometers 
| +
Fri Nov 10 20:19:13 2023, Koji, Summary, General, In-vacuum beam centering for input optics
| +
Mon Nov 13 00:53:02 2023, Koji, Update, General, EP30-2 kit brought from Downs
| +
Mon Nov 13 16:08:47 2023, JC, Update, CDS, FB1 fan replacement (fb1 alarm)
|
Wed Nov 15 15:49:34 2023, JC, Update, Daily Progress, Input Chamber Door Removed
|
Wed Nov 15 17:37:17 2023, Koji, Update, SUS, PRM SUS UL PD not responding
|
Thu Nov 16 14:39:34 2023, JC, Update, BHD, Update on BHD Parts and Cleanroom Accomodations
| +
Wed Nov 22 19:55:21 2023, Koji, Update, BHD, BHD Platform Inventory
| +
Tue Nov 28 14:37:00 2023, Koji, Update, General, Lab Temp 
| +
Tue Nov 28 17:24:44 2023, Radhika, Update, General, LO/POP beams aligned 7x
| +
Tue Nov 28 19:47:22 2023, Radhika, Update, BHD, BHD Optics moved to BHD cleanroom    
|
|