Keven, Steve
The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack 1Y1, 2 and 3.
Last week we did the south arm tube floor.
Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7
|
Keven, Steve
1Y4, 1X1,2,3,4 & 5 instrument racks floor space were cleaned.
|
Keven, Steve
1X6, 1X7 and 1X9 instrument racks floor space were cleaned today |