40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Feb 5 15:39:41 2014, manasa, Update, General, We are pumping down pre_pump_down.png
    Reply  Wed Feb 5 19:36:50 2014, Steve, Update, VAC, pumpdown at 25 Torr pd77at3.5h.png
       Reply  Wed Feb 5 19:53:51 2014, Steve, Update, VAC, pumpdown stops for the day at 14 Torr stopHere.png
          Reply  Thu Feb 6 11:14:07 2014, Steve, Update, VAC, pumpdown completed pd77.png
             Reply  Mon Feb 10 09:45:53 2014, Steve, Update, VAC, vacuum normal is reached pd77m5d.png13daysAtm.png
                Reply  Tue Feb 11 10:44:15 2014, Steve, Update, VAC, RGA scan at day 6 pd77m6d.png
                   Reply  Tue Feb 18 10:38:55 2014, Steve, Update, VAC, RGA scan at day 13 pd77m13d.pngRGAscan13d.png
                      Reply  Wed Mar 12 08:40:42 2014, Steve, Update, VAC, RGA scan at day 35 pd77m35d.png
                         Reply  Mon Mar 24 10:41:46 2014, Steve, Update, VAC, RGA scan at day 50 pd77m50dRGA.png
                Reply  Fri Mar 7 16:13:03 2014, Steve, Update, VAC, pumping speed is recovered pumpingSpeed.png
Message ID: 9607     Entry time: Thu Feb 6 11:14:07 2014     In reply to: 9605     Reply to this: 9615
Author: Steve 
Type: Update 
Category: VAC 
Subject: pumpdown completed 

 Pumpdown completed. IR shutter opened at P1 1 mTorr  The block is still in the beam path.

Remember to protect MCR pd before crack up the PSL power.

The ion pump gate valves were just closed by cc1 triggered interlock

The cry pump was "regenerated" during the vent and it's outgassing rate minimized.

CC3 cold cathode gauge was replaced.

 

Valve configuration for week end:

1, VA6 disconnected to avoid accidental venting the IFO through the annulos

2, VC2 disconnected to insure that the cryo stays closed

3, RGA is not running, It's pressure limit 1e-5 Torr

 

Attachment 1: pd77.png  67 kB  | Show | Show all
ELOG V3.1.3-