[Rich, Jay, Koji]
We blasted the aLIGO RF PD with a 1W IR beam. We did not find any obvious damage.
Rich and Jay brought the PD back to Downs to find any deterioration of the performance with careful tests.
The power modulation setup is at the rejection side of the PBS in front of the laser source.
I checked the beams are nicely damped.
As they may come back here tomorrow, a power supply and a scope is still at the MC side of the PSL enclosure. |