40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 9113     Entry time: Thu Sep 5 15:18:41 2013
Author: Jenne 
Type: Update 
Category: LSC 
Subject: Free swinging DRMI power buildups 

I have the DRMI free swinging right now, since it's not really locking.  Looking at these time series in the attached pdf, particularly around time=1.15, it would be super handy to trigger the SRCL degree of freedom on AS110 after the PRMI is triggered on POP22.

Attachment 1: DRMI_free_swing_power_buildups.pdf  31 kB  | Hide | Hide all
DRMI_free_swing_power_buildups.pdf
ELOG V3.1.3-