40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Jul 22 16:30:31 2013, Koji, Update, General, Vent preparation 
    Reply  Mon Jul 22 16:56:14 2013, Jenne, Update, General, Vent preparation - In progress 
       Reply  Mon Jul 22 17:03:25 2013, Jenne, Update, General, MC spot positions MCdecenter_22July2013.png
          Reply  Tue Jul 23 04:26:54 2013, Jenne, Update, General, MC spot positions MCdecenter_22July2013_lowpower.png
       Reply  Mon Jul 22 18:49:16 2013, Jenne, Update, General, Vent preparation - In progress 
       Reply  Mon Jul 22 21:23:04 2013, manasa, Update, General, Vent preparation - In progress 
          Reply  Tue Jul 23 03:10:57 2013, Koji, Update, General, Vent preparation - In progress OSEM_RECORD.pngOPLEVS.png
          Reply  Tue Jul 23 03:43:32 2013, manasa, Update, General, Vent preparation - In progress 
             Reply  Tue Jul 23 04:22:03 2013, Koji, Update, General, Vent preparation - In progress 
       Reply  Tue Jul 23 04:31:36 2013, Jenne, Update, General, Vent preparation - Ready for Vent 
          Reply  Tue Jul 23 08:21:31 2013, Steve, Update, VAC, Vent has started beforVent.pngstartVent.png
             Reply  Tue Jul 23 14:00:03 2013, Steve, Update, VAC, the vent is completed Atm.png5cyl.pngventSum1d.png
Message ID: 8890     Entry time: Mon Jul 22 16:56:14 2013     In reply to: 8889     Reply to this: 8891   8893   8894   8903
Author: Jenne 
Type: Update 
Category: General 
Subject: Vent preparation - In progress 

Pre-vent checklist

  • Center all oplevs/IPPOS/IPANG
  • Align the arm cavities for IR and align Xgreen and Ygreen lasers to the arms.
    (X green+PSL green = TRX ~0.7 pre-swap and ~ 0.6 post-swap, Ygreen +PSL green TRY ~600 counts an hour or so after green was aligned to the arm.)
  • Make a record of the MC pointing
  • Align the beam at the PSL angle and position QPDs
     
  • Record good OSEM values.
     
  • Reduce input power by placing wave plate+PBS setup on the PSL table either BEFORE or AFTER THE PMC. (We will try attenuating the power using the WP + PBS that already exist after the laser. If this does not help attenuate enough, we will introduce WP+PBS after the PMC). Refer elog 6892 and elog 7299 for after the PMC detailed procedure.
     
  • Replace 10% BS before MC REFL PD with Y1 mirror and lock MC at low power.
  • Check the MC spot position measurement under the low power mode.
     
  • Close shutter of PSL-IR and green shutters at the ends
  • Make sure the jam nuts are protecting bellows