40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Tue Jul 9 17:03:06 2013, Steve, Update, Green Locking, fiber layed for Y arm  
|
Wed Jul 10 14:49:00 2013, Steve, Update, Green Locking, more fiber protective tubing layed
|
Mon Feb 24 17:21:42 2014, Steve, Update, Green Locking, green fiber status today 6x
|
|
Message ID: 8822
Entry time: Wed Jul 10 14:49:00 2013
In reply to: 8813
|
Author: |
Steve |
Type: |
Update |
Category: |
Green Locking |
Subject: |
more fiber protective tubing layed |
|
|
Quote: |
Craig, Gautam and Steve,
Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.
It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- nylon slit corrugated loom tubing " 1.5" ID
The fiber is not protected between 1Y1 and 1Y4
|
Installed 0.5" ID 10 ft long protective tubing at the PSL end of the ETMY fiber this morning. Here I had to cable tie a bunch of cables at the east side of the PSL enclosure.
They were hanging off the table blocking space were the sliding doors move.
At the ETMX end of the X-arm fiber received the same protective tubing. |
|
|