Entry  Tue Feb 28 11:20:51 2012, steve, Update, SAFETY, safety audit 2012 safety12.JPG
    Reply  Fri Mar 30 09:37:13 2012, steve, Update, SAFETY, safety audit 2012 CORRECTIONS 
       Reply  Wed Mar 6 11:33:09 2013, steve, Update, SAFETY, safety audit 2013 IMG_0010.JPG
          Reply  Wed Mar 13 16:04:24 2013, steve, Update, SAFETY, laser safety glasses checked safetyglasseschecked.jpg
             Reply  Wed Feb 19 08:07:01 2014, steve, Update, safety, annual laser safety glasses check  AA2014checked.jpg2014check.jpg
                Reply  Tue Feb 25 16:54:57 2014, steve, Update, safety, safety audit 2014 
                   Reply  Thu Feb 27 13:11:13 2014, steve, Update, safety, safety audit correction noDaisyChaining.jpgZbThumbnail.info
                   Reply  Thu Mar 13 16:05:48 2014, steve, Update, safety, safety audit 2014 T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf
                      Reply  Mon Mar 17 10:50:58 2014, steve, Update, safety, 2014 annual crane certification 2014craneCert.jpg
                         Reply  Thu Oct 2 14:36:52 2014, steve, Update, PEM, oil drops on vertex crane VertexOilDrops.jpg
                      Reply  Mon Apr 28 17:27:29 2014, steve, Update, safety, safety audit 2014 
                         Reply  Tue Apr 29 00:11:03 2014, steve, Update, safety, safety audit 2014 
                            Reply  Fri May 2 08:15:54 2014, steve, Update, safety, safety audit 2014 solidCoverRequired.jpg
          Reply  Tue Mar 19 10:30:00 2013, steve, Update, SAFETY, crane inspection 2013 sippingOIL.jpg03191301.PDF
          Reply  Fri May 31 10:25:17 2013, steve, Update, safety, first aid kits refilled refilledFAidK.jpg
             Reply  Thu Jun 6 16:33:19 2013, steve, Update, safety, updated laser inventory ELSOconnected.jpg
          Reply  Fri Aug 30 08:08:29 2013, steve, Update, safety, fire horns-flashers tested OK 
Message ID: 8661     Entry time: Fri May 31 10:25:17 2013     In reply to: 8240     Reply to this: 8687
Author: steve 
Type: Update 
Category: safety 
Subject: first aid kits refilled 

Quote:

 

                                                 Recommended correction list:

1,  refill- upgrade first aid boxes

2,  maintain 18" ceiling to bookshelf clearance so the ceiling fire sprinklers are not blocked: room 101

3,  label chilled water supply & return valves in IFO room

4,  calibrate bake room hoods annually

5,  update safety sign at fenced storage

 

              40m still to do list:

1,   clean and measure all safety glasses

2,   annual crane inspection is scheduled for 8am March 19, 1013

3,   make PSL encloser shelf earthquake proof

 

Do you see something that is not safe? Add it to this list please.

 

 

 

Restocked First Aid Kits Location:

Main entrance, room 100

Drill press - above N2 cylinders, room 103

Control room, next to fire extinguisher, room  102

Vertex-north wall, IFO room 104

ETMY - right on ends light switches, IFO room 104_ east end

ETMX - on vertical I-beam of crane, IFO room 104_south end

Behind 1X3 Rack, on south wall - under instrument breakers panel PC-1, IFO room 104

 

Last thing remaining to be fixed from 2013 Safety Audit:

replace book shelf with 83" height

 

 

Attachment 1: refilledFAidK.jpg  246 kB  | Hide | Hide all
refilledFAidK.jpg