40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue May 28 17:00:50 2013, Jenne, Update, ASC, Proposed POP path, to be installed this evening CurrentPOPpath.pdfProposedPOPpath.pdf
    Reply  Thu May 30 17:18:58 2013, Jenne, Update, ASC, New POP path 
       Reply  Sat Jun 1 14:14:56 2013, Jenne, Update, ASC, New POP path POX_table_30May2013progress.pdfPOP_QPD_lensSolution.png
          Reply  Fri Jun 14 03:10:40 2013, Jenne, Update, ASC, New POP path - PDs in place, need cabling 
             Reply  Fri Jun 14 17:54:11 2013, Jenne, Update, ASC, New POP path - cabling work 
             Reply  Wed Jun 19 22:02:03 2013, Jenne, Update, ASC, New POP path - ready to try 
Message ID: 8649     Entry time: Tue May 28 17:00:50 2013     Reply to this: 8658
Author: Jenne 
Type: Update 
Category: ASC 
Subject: Proposed POP path, to be installed this evening 

I have mounted 2 2" G&H high reflective mirrors, to be used in the new POP path.  Manasa and Annalisa are doing green things on their respective arms, so I will hopefully be able to install the new POP path after dinner tonight.

Here are photos of the current POP path, and my proposed POP layout.  In the proposed layout, the optical components whose labels are shaded are the ones which will change.

CurrentPOPpath.pdf

ProposedPOPpath.pdf