40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 850     Entry time: Tue Aug 19 10:36:34 2008
Author: Sharon 
Type: Update 
Category:  
Subject: Calibrating accelerometers 
I took apart the accelerometers near MC1 and MC2.
The 2 sets of 3 accelerometers are now covered by a box on the floor. Please try not to move them... I will place it all back once I am done calibrating.
ELOG V3.1.3-