40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 8466     Entry time: Fri Apr 19 15:19:25 2013
Author: Jamie 
Type: Update 
Category: PEM 
Subject: Trilliums moved from bench to concrete 

I moved the two Trillium seismometers that Den left on the electronics bench out onto the new concrete blocks in the lab that will be their final resting places.  I moved one onto the slab at the vertex and the other to the slab at the Y end.  I left them both locked and just sitting on the concrete.

The pile of readout electronics that were sitting next to them I moved on to the yellow foam box half way down the MC tube, between the MC tube and the X arm tube.  This is obviously not a good place to store them, but I couldn't think of a better place to put them for the moment.

ELOG V3.1.3-