40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Mar 13 21:04:37 2013, Jenne, Update, Green Locking, PSL green cleaned up 
    Reply  Thu Mar 14 04:20:54 2013, Jenne, Update, Green Locking, Ybeat attempt 
       Reply  Thu Mar 14 20:22:33 2013, Jenne, Update, Green Locking, Xbeat attempt 
    Reply  Thu Mar 14 13:38:29 2013, Jenne, Update, Green Locking, PSL green cleaned up 
Message ID: 8290     Entry time: Wed Mar 13 21:04:37 2013     Reply to this: 8291   8293
Author: Jenne 
Type: Update 
Category: Green Locking 
Subject: PSL green cleaned up 

Both X and Y green are aligned such that the arm beams hit the broadband PD.  Also, the 4th port of the combining BS for each arm was used to put a camera and DC PD for each arm.  So, ALS-TRX and ALS-TRY are both active right now.  The camera currently labeled "GRNT" is the Ygreen transmission.  I have a camera installed for Xgreen transmission, but I have not run a cable to the video matrix.  For now, to speed things up, I'll just use the GRNT cable and move it back and forth between the cameras.

ELOG V3.1.3-