40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Mar 8 12:57:57 2013, Annalisa, Update, ABSL, BS installed on ITMY table 
    Reply  Fri Mar 8 13:42:35 2013, Jenne, Update, ABSL, BS installed on ITMY table 
Message ID: 8258     Entry time: Fri Mar 8 13:42:35 2013     In reply to: 8257
Author: Jenne 
Type: Update 
Category: ABSL 
Subject: BS installed on ITMY table 

Re:  POY beam reduction.

We are able to lock the Yarm with the beam / gain as it is.  I had thought we might need to increase the DC gain in the whitening board by a factor of 2, but so far it's fine.

ELOG V3.1.3-