[Steve, Manasa, Jenne, Sendhil, Evan, Yuta]
We put heavy doors on ITMX/ITMY/BS chamber and started pumping down from annulus.
What we did:
1. Replaced POP55 with AS55 back, because it was not broken.
2. Centered on AS55, REFL55, REFL11, POPDC PD.
3. Tried to lock PRMI, but I couldn't lock even MI stably for more than 1 min. I believe this is because it was noisy this morning. But I checked again that REFL/POP/AS beams are coming out without clipping and we have some error signals.
4. Noticed AS beam has less range in left (on AS camera), so we tweaked OM4 a little to make more room.
6. Took pictures inside ITMX and BS chambers
7. Put heavy doors on ITMX/ITMY/BS chambers.
8. Started pumping down annulus.
9. Recentered IPANG/IPPOS and oplevs on their QPDs.
POP, REFL, AS:
|