These are things need to be done for demonstrating PRFPMI using ALS.
All of these should be done before March 8!
CDS:
- Fix c1iscex -JAMIE (done Feb 19: elog #8109)
- Is ASS and A2L working? -JENNE
- Are all whitening filters for PDs toggling correctly? -JENNE, JAMIE
PRMI locking:
- Adjust I/Q rotation angles for error signals -JENNE, YUTA
- Adjust filters -JENNE, YUTA
- Coil balancing for BS (and ITMs/ETMs) -YUTA
PRC characterization in PRMI:
- Measure PR2 loss from flipping -MANASA
- Measure mode matching ratio -JENNE, YUTA
- Measure finesse, PR gain -JENNE, YUTA
- Calibrate PRM and/or ITM oplevs -MANASA, YUTA
- Measure g-factor by tilting PRM or ITMs -JAMIE, YUTA
- Calculate expected mode matching ratio and g-factor -JAMIE
- Calculate expected finesse, PR gain -JENNE
- Align aux laser into AS port? -ANNALISA?
ALS:
- What's the end green situation? Optical layout changed? Laser temperature in CDS? -MANASA
- What's the PSL green situation? Green trans cameras/PD? -JENNE, MANASA
- Make ALS handing off to DARM/CARM LSC script -JENNE, YUTA
- Demonstrate FPMI using ALS -JENNE, YUTA
- Phase tracker characterization -YUTA, KOJI
PRFPMI:
- Measure mode matching between PRC and arms -JENNE, YUTA
- Measure PR gain -JENNE, YUTA
- Calculate expected finesse, PR gain -JENNE
Others:
- Update optical layout CAD after PR2 flipping -JAMIE, MANASA
- AS55 situation? -YUTA
- Look into PMC drift -JENNE, MANASA
- Measure RFAM contribution to error signals -YUTA
Please fix, add or update if you notice anything.
|