40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Nov 13 22:12:15 2012, Jenne, Update, IOO, Turn off MCL path before doing MC spot measurement 
    Reply  Wed Nov 14 09:01:42 2012, Dumb statement catcher, Update, IOO, Turn off MCL path before doing MC spot measurement 
       Reply  Wed Nov 14 13:58:18 2012, Jenne, Update, IOO, Turn off MCL path before doing MC spot measurement 
Message ID: 7709     Entry time: Tue Nov 13 22:12:15 2012     Reply to this: 7711
Author: Jenne 
Type: Update 
Category: IOO 
Subject: Turn off MCL path before doing MC spot measurement 

[Jenne, Den]

We have discovered that the MCL loop squishes the length fluctuations that result from the MC spot measurement angular dither.  This is good, in that the MCL is doing what it ought to do.  However, we need to turn it off before doing a spot measurement.

ELOG V3.1.3-