40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Aug 6 11:07:06 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
    Reply  Wed Aug 8 20:51:56 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
       Reply  Fri Aug 17 18:49:55 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
Message ID: 7125     Entry time: Wed Aug 8 20:51:56 2012     In reply to: 7090     Reply to this: 7222
Author: Manasa 
Type: Update 
Category: 40m Upgrading 
Subject: Optical layout updated 

Quote:

ACAD files of the 40m optical layout have been updated as per the vent in Aug 2011.

Files are available at the 40m svn docs-->Upgrade12-->Opt_Layout2011.

 

 To ease the pain of hunting files, optical layout ACAD files have been moved to a new directory 40M_Optical Layout in the repository. Relevant files from directories Upgrade12 and upgrade 08 will be moved to "40M_Optical Layout" very soon and eventually these old directories will be removed. 

ELOG V3.1.3-