These are all priority action items need to be done before I come back (in mid-September).
BE PREPARED FOR THE FULL LOCK!
NEXT VENT:
- Prepare and install tip-tilts -JAMIE
- Adjust IP-ANG -JAMIE, JENNE, KOJI
- Make sure there's no clipping. Start from MC centering -JAMIE, JENNE, KOJI
ASS/A2L:
- Make ASS and A2L work -JENNE, JAMIE
- Better MC spot position measurement script(see the last sentence in elog #6892) -JENNE
- Daily beam spot measurements for IFO, just like MC -JENNE
- ASS for green using PZT steering mirrors on end table -JENNE
- Modeling of phase tracking ALS -JAMIE
ALS:
- PZT mounts for PSL and ALS beams -JENNE, KOJI
- Add temperature sensors for end lasers to CDS slow channels -JENNE
- Put green trans camera, GTRY PD, and GTRX PD on PSL table -JENNE
- Better beat box; include comparators, frequency dividers, and whitening filters -JAMIE, KOJI
- Adjust servo gain/filters of end green PDH lock (reduce frequency noise) -JENNE
- Add on/off switch, gain adjuster, etc to CDS for end green PDH lock -JENNE, JAMIE
PRC:
- Find why and reduce 3 Hz motion -JENNE
- Simulation of PRMI with clipping -YUTA
- Alignment tolerance of PRMI -YUTA |