Koji, Jamie and I talked together and I decided to VENT TOMORROW MORNING. Main purpose of this vent is to see if PRM is flipped or not.
Vent schedule:
June 28 (Thu)
Prepare for the vent tonight
June 29 (Fri)
Start vent in the morning
Look into PRC in the evening. If PRM was flipped, we will correct them. We'll use REFL to align the PRM. If PRM was not flipped, look into PR2,PR3 and other related optics.
June 30 (Sat)
July 1 (Sun)
Thinking time. I can work if needed.
July 2 (Mon)
If we need something else to do, do it.
If not, start pumping.
July 4th is the Independence Day. So, I need IFO working before July 4th.
Check List:
We will just open the BS chamber.
- PRM flipping
- PR2, PR3 flipping
- PRC suspensions
- Cipping check in PRC |