40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 5891     Entry time: Tue Nov 15 00:00:15 2011
Author: Suresh 
Type: Update 
Category: IOO 
Subject: MC was realigned to remove beam clipping and to accommodate PZT1 range 

[Kiwamu, Suresh]

The MC was realigned to readjust the input beam direction in pitch such that the clipping of the beam at the PSL table reduced and the railing of the PZT1 is avoided.

The current spot positions are given below on the last row:

 

 Date  #### MC1P MC2P MC3P MC1Y MC2Y MC3Y
03Nov2011   0.1354 -0.2522 -0.1383 -1.0893 0.7122 -1.5587
04Nov2011   4.0411 4.4994 3.5564 -1.4170 -0.2606 -1.7109
08Nov2011   4.7341 4.8794  4.3907 1.3542 -3.0508 -1.7167
10Nov2011    1   3.9944 3.7676 6.1001 -1.3058 -3.8087 -1.6418
11Nov2011    1  3.8542 3.6831 3.0418 -0.8383 0.1550 -2.3841
11Nov2011    2    3.6876 2.7429 2.7830 -1.6250 -0.0386 -1.6346
14Nov2011    1 5.9412 2.7658 5.4806 -4.7676 0.7778 2.2053

 

We have quite a lot of decentering in the MC which we must try to remove by parallel transporting the beam in Pitch and Yaw..

At the current settings we might be clipping on the Faraday Isolator as we had estimated that we can allow atmost a 2mm offset in spot positions due to this constraint.

 

 

 

ELOG V3.1.3-