40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Sat Oct 1 17:47:21 2011, Koji, Summary, General, Recovery from the power shutdown 
    Reply  Sat Oct 1 22:53:49 2011, kiwamu, Summary, General, Recovery from the power shutdown : lockable 
    Reply  Sun Oct 2 13:45:13 2011, rana, Summary, General, Recovery from the power shutdown: apache / svn 
    Reply  Mon Oct 3 08:38:21 2011, steve, Summary, VAC, Recovery from the power shutdown is completed poweroutage.jpg
       Reply  Thu Oct 13 21:40:59 2011, rana, Summary, VAC, Recovery from the power shutdown is completed 
Message ID: 5599     Entry time: Mon Oct 3 08:38:21 2011     In reply to: 5592     Reply to this: 5662
Author: steve 
Type: Summary 
Category: VAC 
Subject: Recovery from the power shutdown is completed 

 

I failed to start Rana's favorit anciant desktop computer at the vac rack. He has to baby this old beast just a little bit more.

Vacuum status: Vac Normal was reached through Farfalla: Rga was switched back to IFO and and Annuloses are beeing pumped now.

V1 was closed for about a day and the pressure reached  ~2.8 mTorr in the IFO.  This leakrate plus outgassing is normal

The ref cavity 5000V was turned on.

The only thing that has to be done is to restart the RGA. I forgat to turn it off on Friday.

 

Attachment 1: poweroutage.jpg  60 kB  Uploaded Mon Oct 3 11:26:16 2011  | Hide | Hide all
poweroutage.jpg
ELOG V3.1.3-