40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 5437     Entry time: Fri Sep 16 17:09:07 2011
Author: Paul 
Type: Update 
Category: SUS 
Subject: ITMX oplev plan 

 I just drew a basic picture of how the ITMX oplev path could be reworked to minimise the number of optics in the path. Only possible problem with this might be the turning mirror onto the ITMX getting in the way of the collimating lenses. Should be easy to solve though. Does anyone know if there is a ITMX pick off beam I should be careful to avoid?

Attachment 1: ITMX_oplev_plan.png  1.416 MB  | Hide | Hide all
ITMX_oplev_plan.png
ELOG V3.1.3-